# Ballybane, Co. Dublin: townland, land parcels and planning Townland in the civil parish of Clondalkin, barony of Uppercross, Co. Dublin; in Irish An Baile Bán. - Area (Tailte Éireann): 860,709 m² (86.07 ha, 212.69 acres) - Land parcels (Tailte Éireann): 59 registered freehold parcels lie mostly in it, median 3,143 m² (0.31 ha, 0.78 acres) - Zoning (national zoning, MyPlan): C2.1 EE, the zone with the most parcels - Planning (National Planning Applications): over 100 applications since 2010 - Civil parish: Clondalkin, https://everytownland.com/dublin/parish/clondalkin.md - Barony: Uppercross - Electoral division: Clondalkin-Dunawley, the unit of the census - Census 2022 (Central Statistics Office): 11,298 people lived in 3,826 households in the Clondalkin-Dunawley electoral division. 51% of households owned their home. 20% of homes were built since 2001. 3% of dwellings stood vacant on census night, and 0% were holiday homes. - County: Co. Dublin, https://everytownland.com/dublin.md - Placenames Database of Ireland: https://www.logainm.ie/en/17354 - Townland number at Tailte Éireann: 260067 - Centre: latitude 53.319752, longitude -6.447111 (WGS 84) ## Land parcels (registered freehold land, Tailte Éireann) 59 registered freehold parcels lie mostly in Ballybane, from 46 m² to 192,814 m² (19.28 ha, 47.65 acres); 28 neighbouring parcels touch its boundary. Largest first: - Parcel 1882597: 192,814 m² (19.28 ha, 47.65 acres), https://everytownland.com/parcel/1882597.md - Parcel 1882592: 60,485 m² (6.05 ha, 14.95 acres), https://everytownland.com/parcel/1882592.md - Parcel 1789133: 51,286 m² (5.13 ha, 12.67 acres), https://everytownland.com/parcel/1789133.md - Parcel 1882595: 47,707 m² (4.77 ha, 11.79 acres), https://everytownland.com/parcel/1882595.md - Parcel 1789121: 46,757 m² (4.68 ha, 11.55 acres), https://everytownland.com/parcel/1789121.md - Parcel 1917704: 43,485 m² (4.35 ha, 10.75 acres), https://everytownland.com/parcel/1917704.md - Parcel 1882583: 39,645 m² (3.96 ha, 9.8 acres), https://everytownland.com/parcel/1882583.md - Parcel 1882579: 38,791 m² (3.88 ha, 9.59 acres), https://everytownland.com/parcel/1882579.md - Parcel 1882589: 36,724 m² (3.67 ha, 9.07 acres), https://everytownland.com/parcel/1882589.md - Parcel 1789131: 36,099 m² (3.61 ha, 8.92 acres), https://everytownland.com/parcel/1789131.md - Parcel 1789137: 34,340 m² (3.43 ha, 8.49 acres), https://everytownland.com/parcel/1789137.md - Parcel 1789128: 25,851 m² (2.59 ha, 6.39 acres), https://everytownland.com/parcel/1789128.md - Parcel 4268913: 20,089 m² (2.01 ha, 4.96 acres), https://everytownland.com/parcel/4268913.md - Parcel 1789124: 19,088 m² (1.91 ha, 4.72 acres), https://everytownland.com/parcel/1789124.md - Parcel 1789125: 18,575 m² (1.86 ha, 4.59 acres), https://everytownland.com/parcel/1789125.md - Parcel 1882584: 16,594 m² (1.66 ha, 4.1 acres), https://everytownland.com/parcel/1882584.md - Parcel 1882596: 15,602 m² (1.56 ha, 3.86 acres), https://everytownland.com/parcel/1882596.md - Parcel 3058335: 12,667 m² (1.27 ha, 3.13 acres), https://everytownland.com/parcel/3058335.md - Parcel 5509910: 10,800 m² (1.08 ha, 2.67 acres), https://everytownland.com/parcel/5509910.md - Parcel 1789126: 9,889 m² (0.99 ha, 2.44 acres), https://everytownland.com/parcel/1789126.md - Parcel 5450481: 9,612 m² (0.96 ha, 2.38 acres), https://everytownland.com/parcel/5450481.md - Parcel 1789127: 7,475 m² (0.75 ha, 1.85 acres), https://everytownland.com/parcel/1789127.md - Parcel 1789120: 7,431 m² (0.74 ha, 1.84 acres), https://everytownland.com/parcel/1789120.md - Parcel 1882588: 6,664 m² (0.67 ha, 1.65 acres), https://everytownland.com/parcel/1882588.md - Parcel 2698992: 4,930 m² (0.49 ha, 1.22 acres), https://everytownland.com/parcel/2698992.md - Parcel 1882586: 4,881 m² (0.49 ha, 1.21 acres), https://everytownland.com/parcel/1882586.md - Parcel 1882587: 4,673 m² (0.47 ha, 1.15 acres), https://everytownland.com/parcel/1882587.md - Parcel 1882685: 3,988 m² (0.4 ha, 0.99 acres), https://everytownland.com/parcel/1882685.md - Parcel 3058415: 3,203 m² (0.32 ha, 0.79 acres), https://everytownland.com/parcel/3058415.md - Parcel 1882580: 3,143 m² (0.31 ha, 0.78 acres), https://everytownland.com/parcel/1882580.md - Parcel 1882684: 2,692 m² (0.27 ha, 0.67 acres), https://everytownland.com/parcel/1882684.md - Parcel 2698991: 2,603 m² (0.26 ha, 0.64 acres), https://everytownland.com/parcel/2698991.md - Parcel 1882593: 2,456 m² (0.25 ha, 0.61 acres), https://everytownland.com/parcel/1882593.md - Parcel 1789129: 2,376 m² (0.24 ha, 0.59 acres), https://everytownland.com/parcel/1789129.md - Parcel 1882591: 1,683 m², https://everytownland.com/parcel/1882591.md - Parcel 1882582: 1,518 m², https://everytownland.com/parcel/1882582.md - Parcel 1882687: 1,490 m², https://everytownland.com/parcel/1882687.md - Parcel 1882688: 1,225 m², https://everytownland.com/parcel/1882688.md - Parcel 1742283: 1,177 m², https://everytownland.com/parcel/1742283.md - Parcel 4268919: 1,052 m², https://everytownland.com/parcel/4268919.md - Parcel 4833251: 842 m², https://everytownland.com/parcel/4833251.md - Parcel 5483799: 741 m², https://everytownland.com/parcel/5483799.md - Parcel 2516288: 728 m², https://everytownland.com/parcel/2516288.md - Parcel 5075034: 694 m², https://everytownland.com/parcel/5075034.md - Parcel 4795259: 654 m², https://everytownland.com/parcel/4795259.md - Parcel 4596182: 565 m², https://everytownland.com/parcel/4596182.md - Parcel 1882594: 547 m², https://everytownland.com/parcel/1882594.md - Parcel 1789134: 540 m², https://everytownland.com/parcel/1789134.md - Parcel 1789136: 492 m², https://everytownland.com/parcel/1789136.md - Parcel 1789212: 387 m², https://everytownland.com/parcel/1789212.md - Parcel 2516306: 363 m², https://everytownland.com/parcel/2516306.md - Parcel 1789135: 327 m², https://everytownland.com/parcel/1789135.md - Parcel 1882590: 306 m², https://everytownland.com/parcel/1882590.md - Parcel 1882585: 295 m², https://everytownland.com/parcel/1882585.md - Parcel 3058195: 270 m², https://everytownland.com/parcel/3058195.md - Parcel 1789132: 243 m², https://everytownland.com/parcel/1789132.md - Parcel 5450486: 74 m², https://everytownland.com/parcel/5450486.md - Parcel 1789130: 51 m², https://everytownland.com/parcel/1789130.md - Parcel 5450490: 46 m², https://everytownland.com/parcel/5450490.md ## Zoning (national zoning of development plans, MyPlan) - C2.1 EE (Industrial, enterprise, employment): South Dublin County Development Plan 2022-2028, South Dublin; 66 parcels. The zoning objective in the plan: https://www.sdcc.ie/en/devplan2022/adopted-plan/ - G1 OS (Open space, park): South Dublin County Development Plan 2022-2028, South Dublin; 2 parcels. The zoning objective in the plan: https://www.sdcc.ie/en/devplan2022/adopted-plan/ ## Planning applications whose site touches the townland (National Planning Applications, Department of Housing, Local Government and Heritage) The 100 most recent applications are listed; the file holds more. - 30 Jul 2026, South Dublin County Council SD26A/0187W: Grant permission. Permission. Provision of a boiler house, boiler, heat exchangers and ancillary equipment; The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence; The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.. File: https://planning.agileapplications.ie/southdublin/application-details/70754 - 21 Jul 2026, South Dublin County Council SD26A/0121W: Grant permission. Permission. Installation of a new culvert to convey the Baldonnell Stream. The proposed culvert will be an approximately 90m long concrete box culvert with overall internal dimensions of 1.1m wide by 1.7m high. And all associated works.. File: https://planning.agileapplications.ie/southdublin/application-details/70397 - 27 May 2026, South Dublin County Council SD20A/0283/EP: Grant extension of duration of permission. Extension of duration of permission. Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.. File: https://planning.agileapplications.ie/southdublin/application-details/70427 - 2 Apr 2026, South Dublin County Council SD20A/0295/EP: Grant extension of duration of permission. Extension of duration of permission. Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.. File: https://planning.agileapplications.ie/southdublin/application-details/70089 - 16 Jan 2026, South Dublin County Council SD26A/0012W: Grant permission. Permission. Amendments to planning permission Reg. Ref.: SD21A/0241, as previously amended by Reg. Ref.: SD23A/0035, SD23A/0203, SD23A/0291, SD24A/0162W and SD25A/0102W. The proposed amendments consist of the following: The provision of an underground firewater retention tank c. 840m3 located to the north of the overall site; The provision of a new entrance onto the New Nanagor Road to service this tank and for infrequent maintenance; Security fencing and associated ground pipework and planting; and All associated and ancillary works. File: https://planning.agileapplications.ie/southdublin/application-details/69646 - 13 Jan 2026, South Dublin County Council ED26/0001: Declared exempt. Declaration of exemption sect. 5. The proposed works consist of the erection of 6 No. platforms at the DUB07, DUB 09, DUB13, and DUB14 data centres at Grange Castle Business Park for the purpose of monitoring flue emissions.. File: https://planning.agileapplications.ie/southdublin/application-details/69623 - 14 Oct 2025, South Dublin County Council SD25A/0251W: Grant permission. Permission. The proposed development seeks to provide a temporary construction access road including entrance from Baldonnel Road to provide for the construction of a Regional Network Gateway (RNG) facility permitted under South Dublin County Council Reg. Ref. SD25A/0035W. The works will also involve the temporary provision of a security hut, security gate, vehicle set down area, associated fencing, lighting, civils, drainage, and landscaping works. The temporary works will be removed and lands reinstated to their former use when the construction of the RNG facility is complete.. File: https://planning.agileapplications.ie/southdublin/application-details/69100 - 30 Apr 2025, South Dublin County Council SD25A/0102W: Grant permission. Permission. The proposed development comprises amendments to planning permission Reg. Ref.: SD21A/0241, as previously amended by Reg. Ref.: SD23A/0035, SD23A/0203, SD23A/0291 and SD24A/0162W. The proposed amendments consist of the following: The provision of a sprinkler tank to a height of c. 11m (c. 12.8m to top of maintenance ladder) with a diameter of c. 10.1m located to the north west of the overall site; The provision of a pumphouse to the east of the sprinkler tank comprising c. 73sq.m; Security fencing and associated above ground pipework; and All associated and ancillary works.. File: https://planning.agileapplications.ie/southdublin/application-details/68181 - 25 Mar 2025, South Dublin County Council SD25A/0071W: Grant permission. Permission. PERMISSION for development at this site at Grange Castle Business Park. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of revisions to parent permission SDCC Reg. Ref. SD24A/0188W to include the following: Removal of internal mezzanine floor level (175sqm). Removal of internal staircase. Introduction of external staircase to be located adjacent the south façade and enclosed in screening panels. All other developments as permitted under the SDCC Reg. Ref. SD24A/0188W: A permitted storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.. File: https://planning.agileapplications.ie/southdublin/application-details/67947 - 31 Jan 2025, South Dublin County Council SD25A/0017W: Grant permission. Permission. Microsoft Ireland Operations Ltd. intend to apply for permission for development at the Microsoft Campus, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22. The development will consist of the temporary provision of 9 No. generators (fuelled with Hydrotreated Vegetable Oil (HVO)) and associated site development works for a period to run concurrently with the lifespan of the permitted development under South Dublin County Council (SDCC) Reg. Ref. SD20A/0283 and SD21A/0203. The maximum height of the flue stacks associated with the generators is c. 30.95m. The temporary works will be removed when the permission expires. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.. File: https://planning.agileapplications.ie/southdublin/application-details/67628 - 31 Oct 2024, South Dublin County Council ED24/0062: Declared exempt. Declaration of exemption sect. 5. The development will consist of two basic canopy shelters which are to be erected directly above two existing generator compounds for weather protection and maintenance. The canopy design and materials are chosen to have minimal impact on the external appearance.. File: https://planning.agileapplications.ie/southdublin/application-details/67172 - 30 Oct 2024, South Dublin County Council ED24/0060: Declared not exempt. Declaration of exemption sect. 5. Implementation and use of 13 no. temporary replacement generators at the Dub15 Data Centre building within the Microsoft Campus to operate the data hall until the recently permitted Gas Network Ireland (GNI) Skid (SDCC Reg Ref. SD24A/0019) is constructed and operational.. File: https://planning.agileapplications.ie/southdublin/application-details/67175 - 31 Jul 2024, South Dublin County Council SD24A/0188W: Grant permission. Permission. Microsoft Ireland Operations Ltd. intend to apply for PERMISSION for development at this site at Grange Castle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of a storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.. File: https://planning.agileapplications.ie/southdublin/application-details/66617 - 1 Jul 2024, South Dublin County Council SD24A/0166W: Grant permission. Permission. The development will consist of the development of a Regional Network Gateway (RNG) facility (supporting infrastructure for the MS data centres) comprising the following: Demolition of existing, temporary, single storey showroom. Construction of a single storey main building (RNG Building - c.1,297.7 sq.m) with air handling units (AHUs). External plant/equipment yards including 3 no. diesel generators; sprinkler tank and pump house; electrical plant rooms, PV panels. Replacement of existing estate road access with new main access and secondary/emergency access. MV substation (with separate estate road access). Stormwater attenuation pond. Bike parking shelter and bin store. 12 no. car parking spaces (4 of which are EV parking spaces and with 1 accessible parking space). Internal road and footpath layout, perimeter fencing and security gates. Landscaped and planted areas including riparian zones. All associated site development works, site lighting, boundary treatments, services/utilities provision (including underground works), and all other ancillary works. Total gross floor area of the development c.1,536.9 sq.m. File: https://planning.agileapplications.ie/southdublin/application-details/66443 - 29 Jan 2024, South Dublin County Council SD24A/0019: Grant permission. Permission. Amendments to a previously permitted development (Ref. SD21A/0203 which amended Ref. SD20A/0283); Amendments relate to the permitted Gas Skid Compound to provide layout details which will include the provision of a boiler house kiosk, Electrical & Instrumentation kiosk, regulators/meters kiosk, gas analyser kiosk and all associated infrastructure and site development works; The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Licence; The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.. File: https://planning.agileapplications.ie/southdublin/application-details/65504 - 15 Sept 2023, South Dublin County Council SD18A/0134/EP2: Grant extension of duration of permission. Extension of duration of permission. Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/64814 - 14 Aug 2023, South Dublin County Council ED23/0037: Declared exempt. Declaration of exemption sect. 5. Use of an existing internal room as a shredding room for operational waste management. No works are required to facilitate the operation as the shredding equipment would be sited wholly within the permitted and completed structure.. File: https://planning.agileapplications.ie/southdublin/application-details/64656 - 14 Jul 2023, South Dublin County Council SD18A/0134/EP: Refuse ext. of duration of permission. Extension of duration of permission. Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/64550 - 14 Jun 2023, South Dublin County Council SD22A/0156: Refuse permission. Permission. 10 year permission on a site is bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue) for modifications to the permitted data centre granted under SDCC Reg. Ref. SD21A/0186 comprising the following, reconfiguration and alterations to the data centre building to include removal of front of house offices at third floor level, alterations to floor levels at second floor to provide consistency between front of house and data halls, parapet height increase of front of house to c.16.8m, provision of storage at second floor level in lieu of relocated internal generators to the external generator yard and associated elevational alterations; extension of loading dock at ground floor level by c.6osqm in area with minor height increase to c.5.3m; removal of 3 air plenums to the front (north) elevation and provision of screening to generator flues in lieu of omitted plenums; alterations at roof level to include removal of 2m high gantry screening; alterations to the permitted generator plant yard to the north of the data centre to include the removal of fuel tanks, reconfiguration of plant and generators, provision of 2 additional external generators (increase from 5 to 9 external generators), provision of 4 additional external plant rooms, provision of diesel pump tank cabinets and stepover, relocation of generator yard doors and enlarged generator yard to accommodate the proposed modifications; increase in plant areas by c.77sq.m; reconfiguration of plant within the permitted chiller plant yard to the south of the data centre; removal of 1 sprinkler/water tank and removal of stairs and door to the side of the waste compound; reconfiguration of car parking and motorcycle spaces and removal of 1 accessible space. 64 total number of car parking spaces; the proposal also includes provision of on-site gas power generation compound ( c.2,604sq.m in area) in the area previously reserved for a future data centre; the compound comprises 7 modular plant rooms (totalling c.180sq.m in area), 10 gas fired generators and associated flues c.14.7m high, gas skid, associated modular plant, boundary treatment surrounding the compound c.6.5m high and 2 vehicular access points including general and emergency access; all associated site development works, services provision, drainage works, access, landscaping and boundary treatment works; no buildings are proposed above the existing ESB and SDCC wayleaves to the west and north of the site; the overall Gross Floor Area of the development is reduced by c.44sq.m to c.9,795sq.m from previously permitted under SDCC Reg. Ref. SD21A/0186; the application is accompanied by a Natura Impact Statement.. File: https://planning.agileapplications.ie/southdublin/application-details/62502 - 19 May 2023, South Dublin County Council SD23A/0035: Grant permission. Permission. Amendment and modification of SD21A/0241 including the replacement of the permitted 2 sprinkler tanks and pump room with a two storey battery energy storage system (435.56sq.m) over a single level basement that will contain a sprinkler system, water tanks and pump room that will serve the overall permitted development as granted under Ref. SD21A/0241; A single additional car parking space will be provided adjacent to the new building that will be accessed via permitted access road from Falcon Avenue within Profile Park that was granted under Ref. SD21A/0241; 2 new transformers to be located to the north of the permitted switch rooms; 1 life safety generator to be located adjacent to the permitted step up transformer compound within the site.. File: https://planning.agileapplications.ie/southdublin/application-details/63838 - 4 Apr 2023, South Dublin County Council SD22A/0420: Refuse permission. Permission. Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/63410 - 28 Feb 2023, South Dublin County Council SD23A/0039: Grant permission. Permission. Provision of an establishment to which to European Communities (Major Accident Hazards involving Dangerous Substances) Regulations 2006 as amended by Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 apply, constituting a change of use; The new establishment will include all the existing and permitted buildings (SD13A/0143 as amended by SD13A/0265, SD14A/0194 as amended by SD15A/0343, SD16A/0088 as amended by AD17A/0318 & SD20A/0283, SD21A/0203 & SD21A/0288, all within an existing campus; The proposal relates to the total quantum of fuel oil to be stored within existing and permitted tanks across the existing and permitted buildings; For the avoidance of doubt no works or physical development is proposed and the application relates to an existing development which comprises or is for the purpose of an activity requiring an integrated pollution prevention and control (IE) licence.. File: https://planning.agileapplications.ie/southdublin/application-details/63869 - 28 Nov 2022, South Dublin County Council SD22A/0446: Invalid application. Permission. Provision of an establishment to which the European Communities (Major Accident Hazards involving Dangerous Substances) Regulations 2006 as amended by Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply. The new establishment will include all the existing permitted buildings (SD13A/0143 as amended by SD13A/0265; SD14A/0194 as amended by SD15A/0343; SD16A/0088 as amended by SD17A/0318 and SD20A/0283; SD21A/0203; SD21A/0288), all within existing campus. The proposal relates to the total quantum of fuel oil to be stored within existing and permitted tanks across existing and permitted buildings. For the avoidance of doubt no works or physical development id proposed. The application relates to an existing development which comprises or is for the purposes of an activity requiring an integrated pollution prevention and control (IE) licence. File: https://planning.agileapplications.ie/southdublin/application-details/63516 - 21 Mar 2022, South Dublin County Council SD21A/0241: Grant permission. Permission. Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.. File: https://planning.agileapplications.ie/southdublin/application-details/61269 - 25 Feb 2022, South Dublin County Council SD21A/0186: Grant permission. Permission. Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement.. File: https://planning.agileapplications.ie/southdublin/application-details/61048 - 3 Feb 2022, South Dublin County Council SD22A/0029: Refuse permission. Permission. Widening of the site entrance to provide for a separate lane for the entrance and exit of cars to separate car traffic from heavy good vehicle traffic and associated works at Kilcarberry Business Park, Clondalkin, Dublin 22.. File: https://planning.agileapplications.ie/southdublin/application-details/61854 - 21 Oct 2021, South Dublin County Council SD21A/0288: Grant permission. Permission. Erect 329sq.m or 67.34 KWp of photovoltaic panels on the roof of the building DUB12 in data centre; all associated site works.. File: https://planning.agileapplications.ie/southdublin/application-details/61451 - 13 Oct 2021, South Dublin County Council SD21A/0203: Grant permission. Permission. Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.. File: https://planning.agileapplications.ie/southdublin/application-details/61113 - 17 Feb 2021, South Dublin County Council SD20A/0295: Grant permission & grant retention. Permission and retention. Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.. File: https://planning.agileapplications.ie/southdublin/application-details/59762 - 1 Feb 2021, South Dublin County Council SD20A/0283: Grant permission. Permission. Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.. File: https://planning.agileapplications.ie/southdublin/application-details/59672 - 21 Jan 2021, South Dublin County Council ABP-309146-21: Grant permission. Strategic infrastructure application. The proposed development primarily comprises the provision of two 110kV transmission lines and a 110kV Gas Insulated Switchgear (GIS) substation compound along with associated and ancillary works and is described as follows: The proposed 110kV GIS Substation Compound is to be located on lands to the north-east of the two storey data centre facility and associated three storey office block that was permitted under SDCC Reg. Ref. SD18A/0134/An Bord Pleanála Ref. ABP-302813-18, and within an overall landholding bound to the north by the Grange Castle South Business Park access road; to the west by the Baldonnel Road and to the south by 3 residential properties and the Baldonnel Road; and to the east by the Google data centre facility within the Grange Castle South Business Park, Baldonnel, Dublin 22. The site of the proposed development has an area of c. 0.9163 hectares. The proposed 110kV Gas Insulated Switchgear (GIS) Substation Compound includes the provision of a two storey GIS Substation building (with a gross floor area of 1,307.2sqm) (known as the Aungierstown Substation), two transformers, lighting and lightning masts, car parking, associated underground services and roads within a 2.6m high fenced compound and all associated construction and ancillary works. Two proposed underground single circuit 110kV transmission lines will connect the proposed Aungierstown 110kV GIS Substation to the existing 220kV / 110kV Castlebaggot Substation to the immediate north-east. The proposed transmission lines cover a distance of approximately 120m and 140m within the townlands of Ballybane, and Aungierstown and Ballybane. The development includes the connections to the two substations (existing and proposed), changes to landscaping permitted under SDCC Reg. Ref. SD18A/0134 / An Bord Pleanála Ref. ABP-302813-18 and all associated construction and ancillary works. An Environmental Impact Assessment Report has been prepared in respect of this application. The planning application and the Environmental Impact Assessment Report may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy) during public opening hours for a period of seven weeks commencing on the 21st January 2021 at the following locations: The Offices of An Bord Pleanála, 64 Marlborough Street, Dublin 1. South Dublin County Council, County Hall, Town Centre, Tallaght, Dublin 24. The application may also be viewed/downloaded on the following website: www.aungierstown-substation.com Submissions or observations may be made only to An Bord Pleanála ('the Board'), 64 Marlborough Street, Dublin 1 during the above-mentioned period of seven weeks relating to: the implications of the proposed development for proper planning and sustainable development, and the likely effects on the environment of the proposed development, and the likely significant effects of the proposed development on a European site, if carried out. Any submissions/observations must be accompanied by a fee of €50 (except for certain prescribed bodies) and must be received by the Board not later than 5.30p.m. on the 10th March 2021. Such submissions/observations must also include the following information: The name of the person making the submission or observation, the name of the person acting on his or her behalf, if any, and the address to which any correspondence relating to the application should be sent, The subject matter of the submission or observation, and The reasons, considerations and arguments on which the submission or observation is based in full. (Article 217 of the Planning & Development Regulations refers). Any submissions or observations which do not comply with the above requirements cannot be considered by the Board. The Board may at its absolute discretion hold an oral hearing on the application. (For further details see ‘A Guide to Public Participation in Strategic Infrastructure Development' on the Board’s website www.pleanala.ie). The Board may in respect of an application for permission/ approval decide to (a) (i) grant the permission/approval, or (ii) make such modifications to the proposed development as it specifies in its decision and grant permission/approval in respect of the proposed development as so modified, or (iii) grant permission/approval in respect of part of the proposed development (with or without specified modifications of it of the foregoing kind), and any of the above decisions may be subject to or without conditions, or (b) refuse to grant the permission/approval. Any enquiries relating to the application process should be directed to the Strategic Infrastructure Development Section of a Bord Pleanála (Tel. 01- 8588100). A person may question the validity of any such decision by the Board by way of an application for judicial review, under Order 84 of the Rules of the Superior Courts (S. I. No.15 of 1986, as amended), in accordance with section 50 of the Planning and Development Act, 2000, as amended. Practical information on the review mechanism can be accessed under the heading Information on cases / Weekly lists - Judicial review of planning decisions on the Board's website www.pleanala.ie or on the Citizens Information Service website www.citizensinformation.ie.. File: https://planning.agileapplications.ie/southdublin/application-details/60160 - 14 Oct 2020, South Dublin County Council SD20A/0124: Grant permission. Permission. (1) Demolition of existing single storey dwelling (c.108.5sq.m); (2) construction of a Distribution Warehouse Building comprising warehousing and ancillary areas at ground floor and support offices, staff areas and plant across two floors; (3) the development will be accessed from the existing Profile Park estate road; (4) provision of car parking, cycle parking, security gatehouse, landscaping and boundary treatments (including security fencing and gates); (5) all associated site development and services works (including diversion/culverting/reprofiling of existing stream on site); (6) total gross floor area of the development c.17,006sq.m.. File: https://planning.agileapplications.ie/southdublin/application-details/58733 - 16 Jul 2020, South Dublin County Council SD20A/0121: Grant permission. Permission. Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the Grange Castle South Business Park and includes the residential property of Ballybane, Old Nangor Road on land within the townlands of Milltown; Ballybane and; Aungierstown and Ballybane; and bounding Baldonnel Road to the west; both the Old and New Nangor Road to the north; and Grange Castle South Access Road to the South, Baldonnel, Dublin 22. The development will consist of the following: (1) The demolition of the existing two storey dwelling of Ballybane and associated farm buildings (565sq.m) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq.m on an overall site of 16.5hectares. (2) 1 two storey data centre (Building A) that will be located to the south-west of the site and will have a gross floor area of 28,573sq.m. and will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (Building B) which will be located to the north-west of the site, and to the immediate north of Building A and will have a gross floor area of 21,725sq.m and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (Building C) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq.m. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) Each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) The overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq.m). (8) 3 single storey MV buildings (each 249sq.m - 747sq.m in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings A and B, and to the south of the generator compound withing building C. (9) 8 prefabricated containerised electrical rooms (65sq.m each and 520sq.m overall) that are stacked in pairs to the immediate south of the temporary substation. (10) Ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under Baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq.m), security hut (30sq.m) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the Grange Castle South Access Road from the south via the Baldonnel Road. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/58726 - 23 Mar 2020, South Dublin County Council SD20A/0082: Grant permission for retention. Retention. 784 photovoltaic panels on the roof of the existing building with all associated site works.. File: https://planning.agileapplications.ie/southdublin/application-details/58497 - 24 Feb 2020, South Dublin County Council SD20A/0049: Grant permission for retention. Retention. Retain the two rooftop lattice telecommunications support structures carrying antennas and link dishes.. File: https://planning.agileapplications.ie/southdublin/application-details/58276 - 24 Sept 2019, South Dublin County Council SD19A/0300: Grant permission. Permission. Single storey ESB substation (27sq.m) that will be accessed from the north off the Grange Castle South Access Road via the Baldonnel Road and off the permitted internal road granted under Reg. Ref. SD18A/0134, An Bord Pleanála Ref. ABP-302813-18 to the south; the proposal will result in a minor and temporary amendment to the landscaping and fencing permitted under Reg. Ref. SD18A/0134, An Bord Pleanála Ref. ABP-302813-18 that granted permission for a two storey data centre and delivery bays with associated three storey office block and services within the overall lands; no other changes to the permission granted under this decision are proposed under this application.. File: https://planning.agileapplications.ie/southdublin/application-details/57340 - 30 Jan 2019, South Dublin County Council SD19A/0030: Invalid application. Retention. Installation of over ground class 3 oil storage tanks; associated ancillary site works.. File: https://planning.agileapplications.ie/southdublin/application-details/55784 - 4 Dec 2018, South Dublin County Council SD18A/0425: Invalid application. Retention. Installation of over ground class 3 oil storage tanks and associated ancillary site works.. File: https://planning.agileapplications.ie/southdublin/application-details/55460 - 30 Jul 2018, South Dublin County Council SD18A/0134: Grant permission. Permission. Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/54061 - 9 Nov 2017, South Dublin County Council SD17A/0402: Grant permission. Permission. Amendments (2,186sq.m) approx. to previous Planning Ref; SD16A/0250 and amendments (188.2sq.m) approx. to previous Planning Ref: SD13A/0186. Previous Planning Ref’s also include SD15A/0243 and SD15A/0352. The amendments proposed to previous Planning Ref: SD16A/0250 include: relocation of part of the 2.4m high north boundary fence and associated works to landscaping, relocation of proposed feature trees within the site, relocation of proposed pedestrian gate within north boundary fence and re-routing of pedestrian/cycle path (pursuant to Condition 2(e) of SD16A/0250); removal of 2 bicycle shelters, additional louvres, service openings and doors to the production building façade with a cumulative area of (107sq.m) approx; relocation of doors to boiler house; allocation of internal floor slab area (288sq.m) to first floor production building and (10sq.m) to second floor; alterations with a total area (724sq.m) approx. to double height platform, pipe-bridge and single height platform to service yard with approximate overall heights of (11m, 10.5m and 6.4m) respectively; proposed amendments to tank yard with (13.5m) approx. max. tank height; proposed increase in flue heights to (16m) approx. and an additional 3m high fence with gates to service yard. A proposed tank enclosure and hard-standing of (101sq.m) approx. and 3m high fence is proposed to the east side of the Link Corridor with a tank height of 8.5m approx. A refuse storage area 6.5m high with approx. footprint of (427sq.m), 111sq.m of which is fully enclosed and all associated drainage and site-works is proposed to eastern boundary of the service yard. Material alterations of (449sq.m) approx. is proposed to the east façade of link corridor and approx. 80sq.m to south façade of boiler house. Amendments to previous Planning Ref: SD13A/0186 include: increased area of approx. (17sq.m) to set-down area at existing south site entrance and proposed pedestrian route with demarcation to road, new pedestrian gate 2.4m high within south boundary fence and proposed footpath and access gate within existing security hut guarding with combined area of approx. (23sq.m); proposed 3m high panel screening with sliding gates (31sq.m) approx. to existing compactor area and all associated site-works. All proposed amendments are on an 11 hectare site.. File: https://planning.agileapplications.ie/southdublin/application-details/53258 - 6 Sept 2017, South Dublin County Council SD17A/0318: Grant permission. Permission. The provision of a temporary (for 3 years) 18MW gas powered electricity generator compound to provide electricity to the DUB08 data centre located within the Microsoft Data Centre Campus, in advance of the upgrade of electricity infrastructure locally. The development will include 16 generators, gas skid compound and site compound (providing control cabinets, drying room, toilets and staff canteen – total floor area of buildings c.125sq.m). Temporary access arrangements via existing construction access from business park road. Provision of 10m high acoustic screen, palisade fencing and gates, staff parking, additional landscape screening. All associated site development, service provision, landscaping and other works. The temporary generator compound will be located within campus lands subject to an extant planning permission – Reg. Ref: SD16A/0088 (4 No. data centres; DUB09, DUB10, DUB12, DUB13) and the current application represents a modification to this permission. The compound will be located across part of the footprint of permitted data centre DUB12. It is intended that DUB12 and DUB13 will be constructed and permission Reg. Ref: SD16/0088 completed following decommissioning of the temporary generator compound. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/52971 - 30 May 2017, South Dublin County Council SD16A/0418: Grant permission. Permission. Installation of over ground class 3 oil storage tanks and associated ancillary site works.. File: https://planning.agileapplications.ie/southdublin/application-details/51467 - 29 May 2017, South Dublin County Council ED17/0028: Declared exempt. Declaration of exemption sect. 5. Change of use from warehouse ( with ancillary offices) to data centre (with ancillary offices).. File: https://planning.agileapplications.ie/southdublin/application-details/52352 - 17 Oct 2016, South Dublin County Council SD16A/0358: Grant permission for retention. Retention. Retention in three locations consisting of: (i) Signage - double sided totem poles with back lighting (33sq.m) (ii) Signage to main building façade with back lighting (68sq.m) (iii) Flag pole - 7m high.. File: https://planning.agileapplications.ie/southdublin/application-details/51219 - 9 Aug 2016, South Dublin County Council SD16A/0286: Invalid - site notice. Retention. Retention in three locations consisting of: (i) Signage – double sided totem poles with back lighting (33sq.m) (ii) Signage to main building façade with back lighting (68sq.m) (iii) Flag pole – 7m high.. File: https://planning.agileapplications.ie/southdublin/application-details/50900 - 15 Jul 2016, South Dublin County Council SD16A/0250: Grant permission. Permission. The expansion of the existing facility (previous planning ref. no.'s SD13A/0186, SD15A/0243 & SD15A/0352) to include the construction of a new 3 storey Bio-Pharma production and filling facility at a height of 20m, two storey central utilities building, single storey boiler building, a fenced external services yard for tanks and equipment, single storey glazed link corridor to the existing logistics building. The facility has a total floor area of 20,000sq.m approx. The proposed development will also include signage, bicycle shelters, underground Clarifier tank, extension of the generator compound, 90 additional car park spaces (of these 3 spaces are accessible); new hard and soft landscaping and modifications to existing, alterations to the existing internal roads, a rainwater retention pond, circulation roads and footpaths are also to be included, temporary construction access to the north of the site and all associated site works. An E.I.S. (Environmental Impact Statement) will be submitted with this application all on a site of 11 hectares.. File: https://planning.agileapplications.ie/southdublin/application-details/50771 - 18 Mar 2016, South Dublin County Council SD16A/0088: Grant permission. Permission. Site enabling works including demolition of existing vacant house and outbuildings (total floor area c.241sq.m), diversion of Baldonnel stream, provision of below ground attenuation. Development of 4 single storey data centres (DUB09, DUB10, DUB12, DUB13) located west of data centres DUB06 (existing), DUB07 & DUB08 (both granted under SD15A/0343), each data centre will contain the following: offices, computer and associated support areas, electrical component rooms, plant and associated equipment, plant at roof level and 5 flues each (each c.25m high) (gross floor area of each data centre c.17,598sq.m c.70,392sq.m in total). The height of each data centre will range between c.6.1m & c.13.3m high. Ancillary site works for connection to infrastructural services, as well as fencing, landscaping, perimeter service roads around the buildings. The provision for installation of heat dispersal infrastructure to facilitate the future potential recycling of waste heat energy by 3rd parties. 160 additional operational parking spaces (including universal accessible spaces). Provision of 20 bicycle parking spaces. Provision of 1 adiabatic water storage tank (c.273sq.m), 1 water treatment storage tank (416sq.m) and 2 pump houses (c.75sq.m each). Provision of 1,750 temporary construction worker parking spaces on adjoining Takeda and SDCC sites. All associated site development, service provision, landscaping ans associated works. This application includes modifications to permission ref. SD15A/0343 in relation to the lands west of permitted DUB07 & DUB08 now forming part of the current application. An Environmental Impact Statement (EIS) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/50158 - 16 Mar 2016, South Dublin County Council SD16A/0087: Grant permission. Permission. Site enabling works including demolition of existing vacant house and outbuildings (total floor area c.241sq.m), diversion of Baldonnell stream, provision of below ground attenuation and associated landscape works on a site of c.9.4ha located north of the Nangor Road and west of kilcarberry Business Park.. File: https://planning.agileapplications.ie/southdublin/application-details/50157 - 26 Feb 2016, South Dublin County Council SD15A/0277: Refuse permission for retention. Retention. (1) Installation of overground oil storage tanks; (2) underground interceptors, slit trap, flume chamber and associated ancillary site works.. File: https://planning.agileapplications.ie/southdublin/application-details/49310 - 20 Nov 2015, South Dublin County Council SD15A/0352: Grant permission. Permission. Addition of corporate signage (19.2sq.m approx.) to the east elevation of the +5°C cold room storage warehouse of the logistics building to the previously approved planning permission, reference No. SD13A/0186; planning permission reference No. SD15A/0092 (withdrawn) and planning permission retention reference No. SD15A/0243.. File: https://planning.agileapplications.ie/southdublin/application-details/49604 - 17 Nov 2015, South Dublin County Council SD15A/0343: Grant permission. Permission. Provision of 2 single storey data centres (DUB07 & DUB08) immediately west of existing data centre (DUB06). These data centres replace 6 buildings permitted under SD14A/0194. Each data centre will contain the following; offices, computer and associated support areas, electrical component rooms, plant and associated equipment, 5 flues (each c.25m high), plant at roof level. Gross floor area of each c.16,900sq.m (c.33,800sq.m in total). The height of each data centre will range between c.6.5m & c.13m high. Also proposed are ancillary site works for connection to infrastructural services, as well as fencing, landscaping, perimeter service roads around the buildings. The provision for installation of heat dispersal infrastructure to facilitate the future potential recycling of waste heat energy by 3rd parties. Revision to permitted car parking and additional parking to now provide a total of 257 spaces (including 5 universal accessible spaces) serving DUB06, DUB07 and DUB08. Provision of 10 bicycle parking spaces. Relocation of fire sprinkler water storage tank (c.128sq.m) permitted under SD14A/0194. Otherwise no changes to the existing DUB06 data centre, plant/tanks, signage, landscaping as permitted/modified under Ref's SD13A/0265 & SD14A/0194. An Environmental Impact Statement (EIS) has been submitted with this planning application.. File: https://planning.agileapplications.ie/southdublin/application-details/49585 - 18 Sept 2015, South Dublin County Council SD15A/0133: Grant permission. Permission. Construction of a single storey data centre, with offices (of circa. 1,560sq.m), storage space, computer and associated support areas, electrical component rooms, loading dock area (the building having a total gross floor area of c.7,609sq.m), roof plant and externally a generator compound (635sq.m), evaporative cooling tank, (150m3) & associated pump house (c.75sq.m), ESB sub station (c.68sq.m), drivers toilet (c.5sq.m), smoking shelter and carparking and bicycle facilities for the sole and only use of Microsoft Operations Ireland Ltd. in connection with this installation. For site safety purposes the provision of sprinkler tank of c.737m3 and associated water tank pump room of 75sq.m is proposed. Also included are ancillary site works for connection to existing Grange Castle infrastructural services as well as fencing, signage, perimeter services road around the building, 60 car parking spaces (including 5 universal accessible car parking spaces) and 18 bicycle spaces. The site perimeter will be enclosed with berming and landscaping to the frontage onto Technology Park Road and the New Nangor Road. All of the above for the sole use of Microsoft Operations Ireland Ltd. An EIS (Environomental Impact Statement) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/48725 - 13 Aug 2015, South Dublin County Council SD15A/0243: Grant permission for retention. Retention. Retention & completion of amendments (1047sq.m approx.) to previously approved planning permission reference SD13A/0186 and planning permission reference SD15A/0092 (withdrawn). Amendments are primarily to the logistics building comprising: increased area (586sq.m approx. inclusive) to the +5°C and -30°C cooling pods to the cold room storage warehouses and reorientation of the centrally located cooling pods to extend lengthways across the roof of the cold room storage warehouses. Reduced length to the -30°C cold room storage warehouse. Minor increase to parapet levels and roof profile to cold room storage warehouses. Removal of the access stairs to these cold room storage warehouses and inclusion of proposed escape ladders. Removal of the Central Utilities Building (CUB) (374sq.m), reorientation of stair at original CUB location. Logistics MV switch room changed to office area and inclusion of window to south elevation of logistics building. Penthouse louvres removed and 3 cooling towers removed. The cold room storage warehouse buildings are a height of 20m and 31.5m. Material alterations include facade envelope finish to administration building (412sq.m approx.). Logistics building south elevation (21sq.m approx.), some relocation of external doors to both administration & logistics building; internal room layout modifications to administration and logistics building. Additional accessible parking bay, revisions to hardstanding at security hut / site entrance, revised canopy and floor level to security hut, inclusion of an additional water tank and generator and a minor increase in area (5sq.m) to the client MV Switch room and all associated site works.. File: https://planning.agileapplications.ie/southdublin/application-details/49145 - 22 Jul 2015, South Dublin County Council SD14A/0198: Grant retention & refuse permission. Permission and retention. Retention permission for existing palisade fence on the boundary with adjoining property and permission for relocation of existing palisade fence and reinstatement of original site entrance.. File: https://planning.agileapplications.ie/southdublin/application-details/47577 - 14 Apr 2015, South Dublin County Council SD15A/0092: Withdraw the application. Permission. Minor amendments (614sq.m approx) to previously approved planning permission reference No. SD13A/0186. Minor amendments are primarily to the logistics building comprising: increased area to the +5°C and -30°C cooling pods to the cold room storage warehouses and reorientation of the centrally located cooling pods to extend lengthways across the roof of the cold room storage warehouses, reduced length to the -30°C cold room storage warehouse, minor increase to parapet levels and roof profile to cold room storage warehouses, removal of the access stairs to these cold room storage warehouses and inclusion of proposed escape ladders; removal of the Central Utilities Building (CUB), reorientation of stair at original CUB location, logistics MV switch room changed to office area and inclusion of window to south elevation of logistics building, penthouse louvres removed and 3 cooling towers removed. Minor amendments also include some relocation of external doors to both administration and logistics building, inclusion of an additional water tank and generator and a minor increase in area to the client MV Switch room, all on an 11 hectare site.. File: https://planning.agileapplications.ie/southdublin/application-details/48514 - 28 Nov 2014, South Dublin County Council SD14A/0252: Grant permission. Permission. 6 additional dock levellers; a single storey extension 228sq.m; 4m high and associated ancillary works to the front elevation to facilitate the relocation of locker rooms and canteen.. File: https://planning.agileapplications.ie/southdublin/application-details/47899 - 17 Sept 2014, South Dublin County Council SD14A/0194: Grant permission. Permission. Development consists of alterations and additions to previously approved development under Reg. Ref. SD13A/0265 to provide for: a reduction in the gross floor area of the permitted building from 35,000sq.m (with a data capacity of 32 MW) to 21,350sq.m (data capacity 17.6 MW). The altered building will include an administration area with office space of 2,225sq.m. As a result, permitted elevations will be altered and the number of flues reduced from 9 to 5. The finished floor level (of 71m OD and the height of flues (of 25m at 95.85m OD) to the permitted (altered) building will be developed as granted under Reg. Ref. SD13A/0265; the permitted surface area to the front of the building is altered to provide 5 truck parking spaces; 6 new buildings are proposed to the west of the altered building to provide data facilities totalling 28,383sq.m. The new buildings will be in the range of 6.362 m - 8.689 m high and to a range of finished floor levels between 68.5m and 69.5m OD; a total of 12 new flues (each 15m high) are proposed; provision of associated plant to include sprinkler tank (670m3) and pump room (69sq.m), external generators (20 no.) (2112sq.m. in total) on hard-standing, reserve switchgear (378sq.m), external plant (646sq.m), water tanks (240sq.m), landscaping, site services, signage, and parking area with electric gates for vehicular access along with electric buggies parking to be provided; provision of heat dispersal infrastructure to facilitate the potential recycling of energy by third parties; 47 new car parking spaces are proposed; otherwise, the site will be developed pursuant to Reg. Ref. SD13A/0265 to provide external plant totalling 5,718sq.m to include 3 no. each of 110KV transformers totalling 974sq.m, fire safety sprinkler tanks (670m3) with an associated pump room (69sq.m), ancillary site works, signage, perimeter services road, 155 car parking spaces, a site perimeter berm and landscaping to Technology Park Road and Grange Castle estate roads. The net result of the above is that the entire data facility will now comprise a total of 49,733sq.m (14,733sq.m over permitted) with a total data capacity of 49.6 MW (17.6 MW over permitted); all of the above for the sole use of Microsoft Ireland. En EIS has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/47561 - 20 Dec 2013, South Dublin County Council SD13A/0265: Grant permission. Permission. Construction of a single data centre with plant at roof level (total gross floor area 35,000 sq.m. as the approved SD13A/0143 scheme). The single change between the approved SD13A/0143 and this application being that the finished floor level is now proposed to be 71.00 OD and not 69.00 OD as per the approved - as a result of this change the heights of the permitted flues, 93.85 OD will be 95.85 OD but will remain 25 metres tall as per SD13A/0143). Otherwise the proposed development remains as the granted SD13A/0143 and comprises of the following uses : - offices, computer and associated support areas, electrical component rooms, plant and associated equipment and new three string 110KV transformer of 974sq.m. for the sole and only use of Microsoft Ireland in connection with this installation. For site safety purposes the provision of sprinkler tanks of 670m3 and associated tank pump room of 69sq.m. are also proposed; also included are ancillary site works for connection to existing Grange Castle infrastructural services as well as fencing, signage, perimeter services road around the building, 155 no. car parking spaces including 8 no. disabled car parking spaces; the site perimeter will be enclosed with berming and landscaping to the frontage onto Technology Park Road and the other Grange Castle estate roads. An Environmental Impact Statement has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/46332 - 13 Sept 2013, South Dublin County Council SD13A/0186: Grant permission. Permission. Construction of a warehouse, distribution, packaging and logistics building over two floors with a 3 storey administration and laboratory building. The warehouse buildings are at height of 20m and 31m; the facility has a total floor area of 22,800sq.m. approx. The development also includes a new entrance, a security gatehouse, sprinkler tank and pump house, generator, fuel tank storage areas, substation, plant rooms, bicycle shelter, smoking shelter, signage, flag poles, security fencing, entrance gates and hard and soft landscaping; 162 no. car parking spaces will be provided (of these 9 no. spaces are accessible); a rainwater retention pond, circulation roads and footpaths are also to be included and all associated site works; an Environmental Impact Statement is enclosed with this application, all on an 11 hectare site.. File: https://planning.agileapplications.ie/southdublin/application-details/45907 - 23 Jul 2013, South Dublin County Council SD13A/0149: Grant permission for retention. Retention. Retention of existing air conditioning condenser units and associated services with a modified layout affixed to the rear wall.. File: https://planning.agileapplications.ie/southdublin/application-details/45653 - 19 Jul 2013, South Dublin County Council SD13A/0143: Grant permission. Permission. Construction of a single storey data centre with plant at roof level (total gross floor area 35000sq.m.) which comprises the following uses: offices, computer and associated support areas, electrical component rooms, plant and associated equipment and new three string 110KV transformer of 974sq.m. for the sole and only use of Microsoft Ireland in connection with this installation. For site safety purposes the provision of sprinkler tanks of 670m3 and associated tank pump room of 69sq.m. are also proposed. Also included are ancillary site works for connection to existing Grange Caste infrastructural services as well as fencing, signage, perimeter services road around the building, 148 car parking spaces including two disabled car parking spaces. The site perimeter will be enclosed with berming and landscaping to the frontage onto Technology Park Road and the other Grange Castle estate roads. An EIS (Environmental Impact Statement) has been submitted with this application.. File: https://planning.agileapplications.ie/southdublin/application-details/45617 - 8 May 2013, South Dublin County Council SD138/0002: Part 8 approved by council. Application under part 8. Construct a new access road as follows: Construction of 550m of 9m wide single carriageway road; Construction of cycletracks, footpaths and verges; Provision of drainage and associated features; Provision of public lighting, road markings and signage; Relocation of services where necessary; Provision of other services and utilities where necessary; Provision of landscaping finishes; All associated site works as necessary to complete the scheme. Plans and particulars of the proposed development are available for inspection at:- South Dublin County Council, County Hall, Tallaght, Dublin 24, between the hours of 9:30am - 12:45pm and 2:00pm - 4:30pm Monday to Thursday and 9.00 am - 4.00 pm Friday and South Dublin County Council,Civic Offices, Clondalkin, Dublin 22 between the hours of 9:30am - 12:45pm and 2:00pm - 4:30pm Monday to Thursday and 9.30 am - 4.00 pm Friday From Wednesday 8th May 2013 - Wednesday 19th June 2013. Submissions and observations with respect to this matter, dealing with the proper planning and sustainable development of the area, in which the development would be situated, may be made in writing to: The Senior Executive Officer, Corporate Services, South Dublin County Council, County Hall, Tallaght, Dublin 24 or by email to : info@grangecastle.ie. Closing date for receipt of submissions is up to and including 12.00 noon on Wednesday, 3rd July, 2013. http://www.sdublincoco.ie/index.aspx?pageid=939&pid=26035. File: https://planning.agileapplications.ie/southdublin/application-details/45309 - 25 Apr 2013, South Dublin County Council SD13A/0073: Withdraw the application. Retention. Retention of existing air conditioning condenser units and associated services with a modified layout affixed to the rere wall.. File: https://planning.agileapplications.ie/southdublin/application-details/45273 - 25 Oct 2012, South Dublin County Council SD12A/0209: Grant permission. Permission. Replacement of existing roller shutter door with a new glazed window to match existing at ground floor on the side / west elevation of an existing two storey office building.. File: https://planning.agileapplications.ie/southdublin/application-details/44594 - 2 Oct 2012, South Dublin County Council SD12A/0150: Grant permission. Permission. Erection of a 2.4m high perimeter fence along Nangor Road boundary (approximately 250m long) with separate entrance gates for vehicular, bicycle and pedestrian access; construction of a single storey security hut with security barriers.. File: https://planning.agileapplications.ie/southdublin/application-details/44201 - 4 May 2012, South Dublin County Council SD12A/0080: Grant permission for retention. Retention. Retention of an existing 15m high telecommunications support structure with antennas, equipment container and associated equipment within a fenced compound (previous permission SD07A/0181). The development forms part of Vodafone Ireland Ltd.'s existing GSM and 3G broadband telecommunications network.. File: https://planning.agileapplications.ie/southdublin/application-details/43872 - 22 Dec 2011, South Dublin County Council SD11A/0311: Grant permission. Permission. Installation of a new generator at first floor level on the south elevation of the building with associated steel structure within an open top cladding enclosure; cladding to include louvred sections for air-intake to the generator. The development also includes the construction of a new fully weathered roof access enclosure to the north elevation of Unit 6 to allow for stairs access to the roof plant area.. File: https://planning.agileapplications.ie/southdublin/application-details/43364 - 15 Nov 2011, South Dublin County Council SD06A/0568/EP: Grant extension of duration of permission. Extension of duration of permission. Provision of roads and services infrastructure to facilitate the future development of a business park, to be known as 'Profile Park' on these lands. The development includes the provision of 1,675 metres of internal distributor roads consisting of 267 metres to dual carriageway standard (at the main entrance) with a further 1,408 metres to single carriageway standard and one internal roundabout. The development also includes surface water drainage, foul drainage and water supply infrastructure, associated landscaping and all ancillary works, on a site of 39.84 hectares. Access to the site will be provided at the northern boundary off the existing roundabout to Kilcarbery Business Park. This application is accompanied by an Environmental Impact Statement.. File: https://planning.agileapplications.ie/southdublin/application-details/43201 - 16 May 2011, South Dublin County Council SD118/0001: Part 8 approved by council. Application under part 8. Construct a new access road off the Nangor Road, Clondalkin Dublin 22 as described below:- • Construction of new single and dual carriageway in 2 phases; • Construction of cycletracks and footpaths; • Provision of drainage and associated features; • Provision of public lighting and signing; • Relocation of services where necessary; • Provision of other services where necessary. Plans and particulars of the proposed development are available for inspection at:- South Dublin County Council, County Hall, Tallaght, Dublin 24, between the hours of 9:30am - 12:45pm and 2:00pm - 4:30pm Monday to Thursday and 9.00 am -4.00 pm Friday and South Dublin County Council, Civic Offices, Clondalkin, Dublin 22 between the hours of 9:30am -12:45pm and 2:00pm - 4:30pm Monday to Thursday and 9.30 am -4.00 pm Friday from Monday 16th May 2011-Monday 27th June 2011. Submissions and observations with respect to this matter, dealing with the proper planning and sustainable development of the area, in which the development would be situated, may be made in writing to: The Senior Executive Officer, Corporate Services South Dublin County Council, County Hall, Tallaght, Dublin 24 or by email to : developdept@sdublincoco.ie. Closing date for receipt of submissions is up to and including 12.00 noon on Monday 11th July, 2011.. File: https://planning.agileapplications.ie/southdublin/application-details/42479 - 16 Mar 2011, South Dublin County Council SD11A/0066: Grant permission for retention. Retention. Two lattice telecommunications support structures, carrying antennae, on the rooftop, for mobile telecommunication purposes at Data Electronics. The development forms part of Vodafone Ireland Ltd's existing GSM and 3G Broadband telecommunications network.. File: https://planning.agileapplications.ie/southdublin/application-details/42221 - 6 May 2010, South Dublin County Council SD09A/0267: Grant permission & grant retention. Permission and retention. Retention of the existing 15-meter high telecommunications support structure carrying antennas & link dishes together with associated equipment container & security fence with access over existing access track.. File: https://planning.agileapplications.ie/southdublin/application-details/39296 - 25 Nov 2009, South Dublin County Council SD09A/0453: Grant permission. Permission. Temporary change of use (for a period of 5 years) of an existing two storey dwelling house (c. 277 sq. m.) to use as an office. Planning Permission is also sought for an additional 3 car parking spaces and the relocation of the site's vehicular entrance from its existing position on the site's southern boundary to the site's western boundary. The planning application will also involve remedial landscaping works to remove the existing residential vehicular entrance and driveway and works involved with the provision of a new driveway linking the new site entrance with the existing property.. File: https://planning.agileapplications.ie/southdublin/application-details/40037 - 27 Mar 2009, South Dublin County Council SD09A/0124: Refuse permission. Permission. Change of use of an existing two storey dwelling house of c.227sq.m. to use as an office; planning permission is also sought for an additional 3 car parking spaces.. File: https://planning.agileapplications.ie/southdublin/application-details/38746 - 14 Oct 2008, South Dublin County Council SD088/0010: Part 8 approved by council. Application under part 8. Construct Baldonnell Road Improvement Scheme & Access Road to Proposed Milltown Business and Technology Park, Clondalkin, Dublin 22 as described below: construction of 300 linear metres of new widened carriageway on Baldonnell Road complete with grass verge on either side of the road; construction of Cycletracks and Footpaths; construction of 1 no. roundabout at the Entrance to the proposed Milltown Business and Technology Park ; construction of 200 metres of dual carriageway within the proposed Milltown Business and Technology Park; construction of 150 metres of single carriageway within the proposed Milltown Business and Technology Park; construction of 2 no. Roundabouts within the proposed Milltown Business and Technology Park; upgrade of Baldonnell Road/Aylmer Road Junction as a small roundabout; demolition of existing house and provision of ancillary service works. Plans and particulars of the proposed developments are available for inspection, or purchase at a fee not exceeding the reasonable cost of making a copy, at:- South Dublin County Council, County Hall, Tallaght, Dublin 24, between the hours of 9.00 am - 5.00 pm Monday to Thursday and 9.00 am - 4.30 pm Friday (inspection and purchase); South Dublin County Council, Civic Offices ,Clondalkin, Dublin 22, between the hours of 9.00 am - 5.00 pm Monday to Thursday and 9.00 am - 4.30 pm Friday (inspection and purchase); Clondalkin Library, Monastery Road, Clondalkin, Dublin 22, between the hours of 9.45am 8.00pm Monday to Thursday and 9.45 4.30pm Friday and Saturday (inspection only) from Monday 21st July to Monday 1st September 2008. Submissions and observations with respect to this matter, dealing with the proper planning and sustainable development of the area, in which the development would be situated may be made in writing to: Senior Executive Officer, Roads Department, South Dublin County Council, County Hall, Tallaght, Dublin 24. Closing date for receipt of submissions is up to and including 4.30 pm on Friday 19th September 2008.. File: https://planning.agileapplications.ie/southdublin/application-details/37852 - 22 Apr 2008, South Dublin County Council SD08A/0266: Grant permission. Permission. Five storey headquarter office building which includes four storeys of office accommodation with a gross floor area of 2657.31sq.m. over a single storey level of undercroft car parking. The development also includes two no. single storey plant rooms of 69.42sq.m. at roof level. Access to the development is proposed from the Nangor Road via the internal Spine Road within the 'Profile Park' Business Park permitted under Planning Application Reg. Ref. SD06A/0568. The development includes 60 number car parking spaces which will be provided at undercroft level and 40 no. surface car parking spaces which will be provided at podium level above. The development also includes an ESB sub-station, all ancillary services, landscaping and site works on a site of 4899 hectares.. File: https://planning.agileapplications.ie/southdublin/application-details/36286 - 18 Mar 2008, South Dublin County Council SD08A/0187: Refuse permission. Permission. Change of use of an existing two storey dwelling house of c.227sq.m. to use as an office.. File: https://planning.agileapplications.ie/southdublin/application-details/35966 - 21 Dec 2007, South Dublin County Council SD07A/1059: Grant permission. Permission. Phase 1 of a services and retail centre and will consist of 3 no. office blocks as follows: (1) Block A comprises a five storey office building of 3,019.6 sq.m. gross floor area which fronts onto the Nangor Road and which will accommodate 18 no. own door office units and 1 no. ESB substation; (2) Block B comprises a five storey office building of 2,905.1 sq.m gross floor area which fronts onto the Nangor Road and is located adjacent to the boundary with Grange Castle Golf Course - this block will accommodate 26 no. own door office units; (3) Block C comprises a four storey office building of 2,684.8 sq. m. gross floor area located adjacent to the boundary with Grange Castle Golf Course which will accommodate 24 no. own door office units. The proposed blocks are arranged in a u-shaped configuration around a central landscaped square. Vehicular access to the site is proposed via a left-turning entry and exit slip lane from the Nangor Road and also via the internal Spine Road permitted under application Reg. Ref. SD06A/0568. The proposed development includes 30 no. surface level car parking spaces and one level of underground car parking which will accommodate 200 no. car spaces. The development also includes all ancillary services, landscaping and site works on a site of 1.3163 hectares. This application is being lodged pursuant to application Reg. Ref: SD06A/0568 under which planning permission was granted for the development of roads and services to facilitate the 'Profile Park' Business Park.. File: https://planning.agileapplications.ie/southdublin/application-details/35266 - 24 Apr 2007, South Dublin County Council SD07A/0296: Grant permission. Permission. A Secondary Pharmaceutical Finishing facility for the manufacture and development of pharmaceutical products consisting of the following: a three storey administration/laboratory building sized 4600sq.m. approximately facing Nangor Road with a height of 15.5m approximately; a single storey production/offices building sized 5000sq.m. approximately principally for packing activities with a height of 8.5m approximately; a four storey tabletting production building sized 8000sq.m. approximately with a height of 25m approximately including its own plant and boiler areas; a single storey combined warehouse, production laboratory, offices and utility building sized 7800sq.m. approximately with a height of 18.5m approximately and a single storey link building sized 900sq.m. approximately with a height of 6m approximately, all on a 20 acre site. The proposed development also includes a single storey security and electrical building, a sprinkler pumphouse and tanks, a single storey drum store, boiler house stacks, roof mounted items of plant and equipment, yard and docking areas; 217 carparking spaces, an internal roads system, surface water attenuation systems and extensive on-site berming and landscape systems. The proposed development has two entrances off the internal Grange Castle site road infrastructure, one main entrance and one emergency entrance and additional security fencing and gates to the rear of the site and replacement fence to Nangor Road and both building and ground mounted signage and flagpoles. Permission is sought to build this facility in modular phases according to need during the ten year permission lifetime sought by this application. An Environmental Impact Statement accompanies this application.. File: https://planning.agileapplications.ie/southdublin/application-details/32453 - 14 Mar 2007, South Dublin County Council SD07A/0181: Grant permission for retention. Retention. Retain existing 15 metre high telecommunications support structure, antennas, equipment container, and associated equipment within a fenced compound. The development forms part of Vodafone Ireland Limited's existing GSM and 3G Broadband telecommunications network.. File: https://planning.agileapplications.ie/southdublin/application-details/31996 - 3 Nov 2006, South Dublin County Council SD06A/0568: Grant permission. Permission. Provision of roads and services infrastructure to facilitate the future development of a business park, to be known as 'Profile Park' on these lands. The development includes the provision of 1,675 metres of internal distributor roads consisting of 267 metres to dual carriageway standard (at the main entrance) with a further 1,408 metres to single carriageway standard and one internal roundabout. The development also includes surface water drainage, foul drainage and water supply infrastructure, associated landscaping and all ancillary works, on a site of 39.84 hectares. Access to the site will be provided at the northern boundary off the existing roundabout to Kilcarbery Business Park. This application is accompanied by an Environmental Impact Statement.. File: https://planning.agileapplications.ie/southdublin/application-details/29356 - 27 Jan 2006, South Dublin County Council SD06A/0049: Grant permission. Permission. Permission to develop an Advance Integrated Circuit Manufacturing Facility and Research Campus on a 145 acre site. The Integrated Circuit Manufacturing Facility will consist of a four storey Integrated Circuit Production Building with Plant Room over, sized approximately 103,000sq. meters, a four storey Headquarters Building sized approximately 13,000sq. meters, a four storey Manufacturing Support Building sized approximately 39,000 sq. meters, a Central Utilities and Water Treatment Building sized approximately 12,000sq. meters, a two storey test and assembly/labatory building sized approximately 20,000sq. meters and a Services Yard for Plant and Equipment, and its associated Tank Farm, a covered Drum Recycling Storage area, a single storey 110kv Electrical Station with Underground Supplies, a Bulk Gas and Liquids Storage and a Nitrogen Gas Generation Facility, Water Storage Tanks, parking for approximately 1,506 cars, a sustaining contractors compound and two storey Contractor Support Building sized approximately 4,300 square meters and 1,225 contractor car parking spaces (approximately), a two storey Engineering Support Building sized approximately 6,700 square meters and extensive landscaping and ancillary site works. The campus and its associated facilities will comprise of a series of modularised production units that will be built to need during the 10 year lifetime sought by this permission. Permission will be sought also to build the complex in phases. The development consists of an activity for which a licence, under Part IV of the Environmental Protection Agency Act, 1992 (as amended by the Protection of the Environment Act, 2003), is required. An Environmental Impact Statement (EIS) has been prepared in respect of the application for planning permission and is submitted with the application.. File: https://planning.agileapplications.ie/southdublin/application-details/27745 - 14 Jul 2005, South Dublin County Council SD05A/0566: Grant permission. Permission. Erection of two ten meter high lattice tower telecommunications support structures, carrying antennae , on the rooftop, for mobile telecommunications purposes.. File: https://planning.agileapplications.ie/southdublin/application-details/26293 - 4 Nov 2004, South Dublin County Council SD04A/0489: Grant permission for retention. Retention. To retain the existing permitted GSM base station installation (See Reg. Ref. S98A/0585) comprising: 15m high triangular lattice mast carrying 6.No.GSM antennas and 2. No. 0.6m diameter link dish/drum antenna, together with associated telecommunications equipment container, security fencing and access track.. File: https://planning.agileapplications.ie/southdublin/application-details/23472 - 13 Apr 2004, South Dublin County Council SD04A/0062: Grant permission. Permission. Alterations to previously approved warehouse extension plan Ref No. SD03A/0714, such alteration consisting of 568 sq.m. of proposed mezzanine dispatch offices in lieu of 312 sq.m. of ground floor offices approved in the orignal application together with associated alterations to the north facing facade of the extension.. File: https://planning.agileapplications.ie/southdublin/application-details/22278 - 24 Sept 2003, South Dublin County Council SD03A/0714: Grant permission. Permission. 1) 70000sq.ft. single storey extension to existing warehouse for use as warehouse storage; 2) 2-storey extension to offices at rear of existing warehouse for use as offices and ancillary staff accommodation; 3) a) 3-storey extension to offices at front of existing warehouse to include staff toilets, locker rooms, stores, and b) new access corridor; 4) single storey extension to rear of existing warehouse for use as a forklift charging enclosure; 5) single storey packaging, recycling and grading enclosure building to rear of site; 6) additional car parking and associated site works.. File: https://planning.agileapplications.ie/southdublin/application-details/21508 - 27 Aug 2003, South Dublin County Council SD03A/0358: Grant permission. Permission, 1 home. Four bedroom dormer bungalow and double garage with wastewater treatment system and associated site works.. File: https://planning.agileapplications.ie/southdublin/application-details/20680 - 14 Aug 2002, South Dublin County Council SD02A/0480: Grant permission. Permission. Relocation of existing jet car wash, provision of new automatic car wash, relocation of car parking, remove section of existing palisade fence and erect new section of palisade fence.. File: https://planning.agileapplications.ie/southdublin/application-details/14485 - 4 Jul 2002, South Dublin County Council SD02A/0361: Grant permission for retention. Retention. Retention of relocation of roller shutter door to side and new glazed screen to front.. File: https://planning.agileapplications.ie/southdublin/application-details/16979 - 26 Mar 2002, South Dublin County Council S02A/0097: Refuse permission. Permission. Change of use from Residential To Irish Cultural and Language Institute and for a new Bio - Cycle unit. File: https://planning.agileapplications.ie/southdublin/application-details/4724 - 24 Jan 2002, South Dublin County Council S02A/0042: Grant permission. Permission. Retention for external signage.. File: https://planning.agileapplications.ie/southdublin/application-details/16153 - 11 Jul 2001, South Dublin County Council S01A/0441: Request additional information. Permission. Demolition of existing dwelling and construction of 1590 m. sq. of new small enterprise units to consist of between 1 and 6 units or combination thereof, to suit occupiers requirements and all associated site works. For use as light industrial and industry offices to consist of data processing, software development, telemarketing, research development, information technology and science research.. File: https://planning.agileapplications.ie/southdublin/application-details/18433 - 29 Jun 2001, South Dublin County Council S01A/0408: Grant permission & refuse permission. Permission. The erection of an external plant enclosure to the side (east) elevation, and a roof mounted communications mast.. File: https://planning.agileapplications.ie/southdublin/application-details/17427 - 14 Jun 2001, South Dublin County Council S01A/0359: Grant permission. Permission. Retention and completion of the following: (a) External generator enclosure to front elevation (Nangor Road). (b) Roof mounted plant enclosure. (c) Rear escape stairs (4 no. steps). (d) New steel double doors to ESB sub-station (on Nangor Road elevation).. File: https://planning.agileapplications.ie/southdublin/application-details/14152 - 28 May 2001, South Dublin County Council S01A/0324: Grant permission. Permission. Erect a 15 metre telecommunications structure carrying antennae with associated equipment container all in a fenced compound.. File: https://planning.agileapplications.ie/southdublin/application-details/13263 - 5 Sept 2000, South Dublin County Council S00A/0625: Grant permission. Permission. Installation of a non-illuminated sign comprising of individual letters and logo to be mounted to the building facade. File: https://planning.agileapplications.ie/southdublin/application-details/16990 - 18 Apr 2000, South Dublin County Council S00A/0259: Refuse permission. Permission. Relocation of site entrance and construction of 760 sq.m. light industrial building and associated site works.. File: https://planning.agileapplications.ie/southdublin/application-details/11485 - 7 Mar 2000, South Dublin County Council S99A/0959: Grant permission. Permission. 6062 sq.m. of small enterprise units for light industrial and industry office use. The development will be sub- divided into either 16 or 25 units or combination thereof to suit occupier's size requirements.. File: https://planning.agileapplications.ie/southdublin/application-details/8861 - 14 Feb 2000, South Dublin County Council S99A/0835: Grant permission. Permission. Retention of change of use of approved industrial/ warehousing unit (reg. ref. S99A/0053) to office based industry with additional office based industry on first floor.. File: https://planning.agileapplications.ie/southdublin/application-details/10312 - 20 Apr 1999, South Dublin County Council S99A/0053: Grant permission. Permission. Development comprising of 7 industrial/warehousing units with ancillary offices with a total area of 4901.93sq. m., all on a 2.65 acre site.. File: https://planning.agileapplications.ie/southdublin/application-details/18268 - 1 Apr 1999, South Dublin County Council S99A/0208: Grant permission. Permission. For alterations to approved development to include 10,393 sq.m. of warehouse unit; 1,144 sq.m. of offices revised elevations; revised site boundary; relocation of warehouse, offices and loading bays; additional car parking at Site F.. File: https://planning.agileapplications.ie/southdublin/application-details/7390 Applicants are not shown. ## Designated sites (National Parks and Wildlife Service) No designated site (Special Area of Conservation, Special Protection Area, Natural Heritage Area or proposed one) touches the townland of Ballybane. ## Recorded monuments (Sites and Monuments Record, National Monuments Service) - DU021-108: Concentric enclosure, https://heritagedata.maps.arcgis.com/apps/webappviewer/index.html?id=0c9eb9575b544081b0d296436d8f60f8&query=18a4b61b268-layer-9%2CSMRS%2CDU021-108----. Not indicated on any OS map a large concentric enclosure is visible as a crop-mark on an aerial photo. A second enclosure (DU021-109----) is visible to the SW. DU021-108----_01.jpg Aerial image (derived from Bing Maps) showing the enclosures. Compiled by: Paul Walsh Date of upload: 11 March 2015 - DU021-109: Enclosure, https://heritagedata.maps.arcgis.com/apps/webappviewer/index.html?id=0c9eb9575b544081b0d296436d8f60f8&query=18a4b61b268-layer-9%2CSMRS%2CDU021-109----. Not indicated on any OS map this enclosure is as a crop-mark on an aerial photo. A second larger enclosure (DU021-108----) is visible to the NE. DU021-109----_01.jpg Aerial image (derived from Bing Maps) showing the enclosures. Compiled by: Paul Walsh Date of upload: 11 March 2015 Works at or in relation to a recorded monument need two months' written notice to the National Monuments Service (National Monuments (Amendment) Act 1994, section 12). ## Architectural heritage (National Inventory of Architectural Heritage) No building of the National Inventory of Architectural Heritage stands in the townland of Ballybane. ## Ground and risks (Radon Risk Map of Ireland, EPA; Landslide Susceptibility Classification and LiDAR, Geological Survey Ireland) - Radon: at the centre of the townland of Ballybane, about 1 in 20 homes in this area is likely to have high radon levels. Testing a home: https://www.epa.ie/environment-and-you/radon/radon-testing/#d.en.82887 - Landslides: The 1:50,000 map rates the landslide susceptibility here as low, partly inferred. - Terrain model: LiDAR of the Office of Public Works, flown in 2011, at 2 m: tile OPW_3005, https://gsi.geodata.gov.ie/downloads/LiDAR/OPW_NASC/OPW_3005.zip (ZIP). - Flooding: the flood maps of the Office of Public Works, https://www.floodinfo.ie/map/floodmaps/, linked only: their licence does not allow re-use. LiDAR: contains Irish Public Sector Data (Geological Survey Ireland & the Office of Public Works) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. ## Downloads - DXF, in Irish Transverse Mercator metres, with its boundary, parcels and buildings, for a drawing program: https://everytownland.com/dublin/ballybane.dxf - GeoJSON, in WGS 84, for a map: https://everytownland.com/dublin/ballybane.geojson - KML, for Google Earth: https://everytownland.com/dublin/ballybane.kml ## Homes sold (Residential Property Price Register) No address of the register names Ballybane with five sales or more. The sales of the area are on the page of Co. Dublin: https://everytownland.com/dublin.md ## Neighbouring townlands (National Statutory Boundaries, Tailte Éireann) - Aungierstown and Ballybane: https://everytownland.com/dublin/aungierstown-and-ballybane.md - Clutterland: https://everytownland.com/dublin/clutterland-260243.md - Grange: https://everytownland.com/dublin/grange-260438.md - Kilbride: https://everytownland.com/dublin/kilbride.md - Kilcarbery: https://everytownland.com/dublin/kilcarbery.md - Kilmactalway: https://everytownland.com/dublin/kilmactalway.md - Milltown: https://everytownland.com/dublin/milltown.md - Nangor: https://everytownland.com/dublin/nangor.md A townland is the smallest land division of Ireland, and the unit of a rural address; old registers such as the 1901 and 1911 censuses file it under its civil parish and barony. --- Everytownland reads the registered freehold land and the statutory boundaries of Tailte Éireann, the national zoning, planning file and heritage records of the Department of Housing, Local Government and Heritage, and the Residential Property Price Register. A parcel is the land of a title, not an address. The owner's name is in the Land Registry of Tailte Éireann: a copy of the folio can be ordered on landdirect.ie, for a fee; this site names no owner. A price is the price recorded for a past sale, not a valuation. Sources: Cadastral Parcels Freehold, Townlands, Civil Parishes, Baronies, Electoral Divisions and Buildings, Tailte Éireann, CC BY 4.0; national zoning of development plans (GZT, MyPlan) and National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0, applicants not shown; designated sites, National Parks and Wildlife Service, CC BY 4.0; Sites and Monuments Record, National Monuments Service, CC BY 4.0; National Inventory of Architectural Heritage, CC BY 4.0; Residential Property Price Register, Property Services Regulatory Authority, re-used with the source acknowledged. - Page: https://everytownland.com/dublin/ballybane - In JSON: https://everytownland.com/api/townland/dublin/ballybane