# Land parcel 2407223, Ireland Registered freehold land, Tailte Éireann. A parcel is the land of a title, not an address. - Parcel number at Tailte Éireann (SP_ID): 2407223 - Area: 23,249 m² (2.32 ha, 5.75 acres), as Tailte Éireann measures it - Buildings (Tailte Éireann): 6 buildings touch it, 18,567 m² on the ground - Townland: none: the statutory boundaries draw no townland here, as in the centres of Dublin, Cork and Galway ## Zoning (national zoning of development plans, MyPlan) - G5 Z9: Amenity/Open Space Lands/Green Network (Mixed/general 'green'/recreation/conservation, other): Development Plan 2022-2028 (Variation No. 11), Dublin City. The zoning objective in the plan: https://www.dublincity.ie/sites/default/files/2022-12/Final%201-14%20Land%20Use%20Zoning%2005.12.22.pdf - G3 Z11: Waterways Protection (Conservation, amenity or buffer space, corridor/belt, landscape): Development Plan 2022-2028 (Variation No. 11), Dublin City. The zoning objective in the plan: https://www.dublincity.ie/sites/default/files/2022-12/Final%201-14%20Land%20Use%20Zoning%2005.12.22.pdf - M2 Z5: City Centre (City/Town/village Centre, central area): Development Plan 2022-2028 (Variation No. 11), Dublin City. The zoning objective in the plan: https://www.dublincity.ie/sites/default/files/2022-12/Final%201-14%20Land%20Use%20Zoning%2005.12.22.pdf - R2 Z1: Sustainable Residential Neighbourhoods (Existing residential): Development Plan 2022-2028 (Variation No. 11), Dublin City. The zoning objective in the plan: https://www.dublincity.ie/sites/default/files/2022-12/Final%201-14%20Land%20Use%20Zoning%2005.12.22.pdf ## Planning applications on this parcel (National Planning Applications, Department of Housing, Local Government and Heritage) 8 applications, newest first. - 5 Jun 2026, Dublin City Council WEB2377/26: Grant retention permission. Retention permission. RETENTION: The development consists of retention of a rooftop solar installation constructed in departure from the details of approved planning application Reg. Ref.: 4220/24. The total solar panel area of the installation is 316.3 sq.m.. - 29 Aug 2024, Dublin City Council 4220/24: Grant permission. Permission. Permission for development at George's Dock I.F.S.C.. Dublin 1. The development will consist of the installation of 224sq. m of solar panels on the roof of the existing building and associated works.. - 8 Dec 2022, Dublin City Council 5398/22: Refuse permission. Permission. PROTECTED STRUCTURE:. The proposed development will consist of the demolition of an existing two-storey over basement extension to the rear (north) of the Harbourmaster Pub (a Protected Structure) and the construction of 1 no. New hotel building which is 11 storeys in height (part 6, 7, 8, 9 and 10 storey building with a plant room at roof/10th floor level). The building will comprise 96 no. hotel bedrooms; with balconies/terraces to hotel bedrooms along the south elevation (located at 6 th -,7 th , 8 th and 9 th -floors) and 1 no. Communal terrace associated with the 10th-floor bar on the south, north and east elevations; ground floor reception area, cycle store,luggage, bar and restaurant and 1 no. ESB sub-station switch room; 1 st to 9 th floor - 96 no. hotel bedrooms; 10 th floor hotel bar; basement level supporting facilities including toilets, hotel kitchen, laundry, waste store, general store, comms room, staff changing and shower facilities, 1 no. water tank room; landscaping; public lighting; boundary treatment; and all associated site development and engineering works necessary to facilitate the proposed development. Access will be provided via the road to the west of the site boundary and George's Dock Road. The building will be connected to the Harbourmaster Pub (a Protected Structure) via a new 1.5-storey glazed link sitting below the eaves level of the Protected Structure.. - 20 May 2022, Dublin City Council 4022/22: Grant permission. Permission. Planning permission for the development will consist of the removal of 3 car parking spaces at ground floor level and construction of a new stand alone single storey shower block accessed from the rear car park entrance to the building. The structure will contain 2 new male shower rooms, 2 female shower rooms and one disabled WC and shower room and a drying room. The entrance to the shower rooms will have an overhead canopy and planter box with integrated external lighting.. - 24 Mar 2022, Dublin City Council 3591/22: Grant permission. Permission. The proposed development comprises the provision of an accessble ramped entrance on the southern and western side of the existing building. The development includes modifications to the existing landscaping and external access arrangements and all ancillary and associated site development and landscaping works.. - 11 Mar 2022, Dublin City Council 3508/22: Application declared inva. Permission. The proposed development comprises the provision of an accessible ramped entrance on the southern and western side of the existing building. The development includes modifications to the existing landscaping and external access arrangements and all ancillary and associated site development site development and landscaping works.. - 18 Feb 2022, Dublin City Council 3315/22: Grant permission. Permission. We, La Touche S.a.r.l. c/o BCP Capital, 71 Upper Leeson Street, Dublin 4, intend to apply for planning permission for development at this c. 0.4417 ha site at La Touche House, Custom House Dock, International Financial Services Centre, Dublin 1. The proposed development will consist of; the refurbishment/reconfiguration, partial demolition, recladding and vertical extension of an existing (c. 13,275.9 sq.m GFA) 7-storey building to a 10-storey (c. 23,314.3 sq.m GFA) office building with an additional c. 8,068.4 sq.m commercial floorspace provided and a total height of c. 45.84 m from ground (50.85m ODM), including the following: 1) Partial demolition of the existing fifth floor and the existing sixth floor plant rooms and external plant areas to fifth floor slab level, comprising a combined area of c. 1528.5sq.m removed, the removal of an existing bridge link across the atrium, and maintaining the existing c. 565.1 sq.m of office space and the existing core areas to the east, west and south; 2) Refurbishment and reconfiguration of the existing office building as follows:- a) Basement level: Reduction in car parking provision from 143 no. to 99 no. retained spaces, reconfiguration of existing plant areas, increased bicycle parking to 184 no. spaces, provision of bicycle storage areas, locker room, changing rooms, staff toilets and drying room, bin storage area, new staircase link, bicycle lift and service lift from podium (ground floor level) covering an additional area of c.913.2 sq.m within the existing basement; b) Ground Floor: Reconfiguration of the existing ground floor to include a new glazed screen enclosure to the existing atrium and introduce a new building entrance to the south elevation accessed from IFSC Plaza and close the existing entrance. Change of use of 103 sq.m of part of an existing retail bank area to office use. Change of use of c. 134.9 sq.m existing office space to a c. 152.1 sq.m food & beverage unit including an extended area of c. 17.2 sq.m to the east and access to an external terrace to the east. Change of use of c. 128.2 sq.m existing office space to a c. 164 sq.m bicycle café including an extended area of c. 35.8 sq.m to the south and east. Reconfiguration of the existing ground floor to the south/south- west to include a change of use from existing office area to create 2 no. food & beverage/retail units of c. 94.1 sq.m and c. 44 sq.m respectively; c) First Floor, Second Floor and Third Floor: Reconfiguration of the existing office floors to include refurbished and extended toilet accommodation; extension of the office accommodation to the edge of a new glazed screen enclosure to the existing atrium; d) Fourth Floor: Reconfiguration of the existing office floors to include refurbished and extended toilet accommodation; extension of the office accommodation to the edge of a new glazed screen enclosure to the existing atrium and enclosure of 2 no. external balcony areas to provide an additional c. 86.6 sq.m office space; e) Fifth Floor: New office floor accommodation to replace the existing plant areas and the enclosure of the existing external terrace to the north of the office floor (c. 1,226 sq.m) and to include the existing c. 565.1 sq.m of office accommodation to the north of the new extended floorplate, reconfiguration of existing plant areas to unisex toilets, lift lobby and circulation space within core area to the south; f) Addition of new floors: Addition of 4 no. office floors with the existing stair cores extended upwards and toilet accommodation replicated as the supplemented existing provision on the lower floors and the existing atrium extended through to roof level; the proposed sixth, seventh and eighth floor levels will consist of c. 1,791.1 sq.m office space each; the proposed ninth floor level will consist of c. 1,329.5 sq.m office space; setback of the external envelope and creation of a terrace area accessible for maintenance only at ninth floor level; new Part M compliant accommodation stairs within the atrium from ground floor to ninth floor; g) External works to include; A complete recladding with replacement curtain walling and an over-wrapping by a translucent perforated metal veil to the vertical external envelope of the existing building from ground floor level to fifth floor level and the extension and continuation of a new curtain wall and external perforated veil above to include the newly reconstructed fifth floor, and the new sixth, seventh. eighth and ninth floors; new plant and plant enclosure screen at roof level; additional plant on perforated metal platforms adjacent to the 3 no. existing cores from first to ninth floor; the provision of photovoltaic panels at roof level; new glazed atrium roof; provision of 4 no standard bicycle spaces and 9 no. cargo bicycle spaces at ground level; provision of a platform lift on the north-east corner of the site; new hard and soft landscaping adjacent to the building only; new lighting; and all associated site development works.. - 23 Dec 2021, Dublin City Council 4190/21: Application declared inva. Permission. Development at a c. 0.4417 ha site. The proposed development will consist of: -The refurbishment/reconfiguration, partial demolition, recladding and vertical extension of an existing (c. 13,276.9 sq.m GFA) 7-storey building to a 10-storey (c. 23,314.3 sq.m GFA) office building with an additional c. 8,068.4 sq.m commercial floorspace provided and a total height of c. 45.84 m from ground (50.85 m ODM), including the following: 1) Partial demolition of the existing fifth floor and the existing sixth floor plant rooms and external plant areas to fifth floor slab level comprising a combined area of c. 1528.5 sq.m removed, the removal of an existing bridge link across the atrium, and maintaining the existing c. 565.1 sq.m of office space and the existing core areas to the east, west and south; 2) Refurbishment and reconfiguration of the existing office building as follows: a) Basement level: Reduction in car parking provision from 143 no. to 99 no. retained spaces, reconfiguration of existing plant areas, increased bicycle parking to 184 no. spaces, provision of bicycle storage areas, locker room, changing rooms, staff toilets and drying room, bin storage area, new staircase link, bicycle lift and service lift from podium (ground floor level) covering an additional area of c. 913.2 sq.m within the existing basement; b) Ground Floor: Reconfiguration of the existing ground floor to include a new glazed screen enclosure to the existing atrium and introduce a new building entrance to the south elevation accessed from IFSC Plaza and close the existing entrance. Change of use of 103 sq.m of part of an existing retail bank area to office use. Change of use of c. 134.9 sq.m existing office space to a c. 152.1 sq.m food and beverage unit including an extended area of c. 17.2 sq.m to the east and access toan external terrace to the east. Change of use of c. 128.2 sq.m existing office space to a c. 164 sq.m bicycle café including an extended area of c. 35.8 sq.m to the south and east. Reconfiguration of the existing ground floor to the south/ south-west to include a change of use from existing office area to create 2 no. food & beverage/ retail units of c. 94.1 sq.m and c. 44 sq.m respectively; c) First Floor, Second Floor and Third Floor: Reconfiguration of the existing office floors to included refurbished and extended toilet accommodation; extension of the office accommodation to the edge of a new glazed screen enclosure to the existing atrium; d) Fourth Floor: Reconfiguration of the existing office floors to include refurbished and extended toilet accommodation, extension of the office accommodation to the edge of a new glazed screen enclosure to the existing atrium and enclosure of 2 no. external balcony areas to provide and additional c. 86.6 sq.m office space; e) Fifth Floor: New office floor accommodation to replace the existing plant areas and the enclosure of the existing external terrace to the north of the office floor (c. 1,226 sq.m) and to include the existing c. 565.1 sq.m of office accommodation to the north of the new extended floorplate, reconfiguration of existing plant areas to unisex toilets, lift lobby and circulation space within core area to the south; f) Addition of new floors: Addition of 4 no. office floors with the existing stair cores extended upwards and toilet accommodation replicated as the supplemented existing provision on the lower floors and the existing atrium extended through to roof level; the proposed sixth, seventh and eighth floor levels will consist of c. 1,791.1 sq.m office space each; the proposed ninth floor level will consist of c. 1,329.5 sq.m office space; setback of the external envelope and creation of a terrace area accessible for maintenance only at ninth floor level; new Part M compliant accommodation stairs within the atrium from ground floor to ninth floor; g) External works to include: A complete recladding with replacement curtain walling and an over-wrapping by a translucent perforated metal veil to the vertical external envelope of the existing building from ground floor level to fifth floor level and the extension and continuation of a new curtain wall and external perforated veil above to include the newly reconstructed fifth floor, and the new sixth, seventh, eighth and ninth floors; new plant and plant enclosure screen at roof level; additional plant on perforated metal platforms adjacent to the 3 no. existing cores from first to ninth floor; the provision of photovoltaic panels at roof level; new glazed atrium roof; provision of 4 no. standard bicycle spaces and 9 no. cargo bicycle spaces at ground level; provision of a platform lift on the north-east corner of the site; new hard and soft landscaping adjacent to the building only; new lighting; and all associated site development works.. Applicants are not shown. ## Designated sites (National Parks and Wildlife Service) No designated site (Special Area of Conservation, Special Protection Area, Natural Heritage Area or proposed one) touches this parcel. ## Recorded monuments around it, by their zones of notification (Sites and Monuments Record, National Monuments Service) No zone of notification of a recorded monument touches this parcel. ## Architectural heritage (National Inventory of Architectural Heritage) - Inner Dock, harbour/dock/port, 1820–1825, Regional interest, registry number 50010007, https://www.buildingsofireland.ie/niah/search.jsp?type=record&county=DU®no=50010007. Rectangular stone wet dock, built 1824, to designs of John Rennie with lock opening into Georges Dock to south. Developed c.1997 as residential development with five apartment blocks built along north and east perimeters and further two blocks built on concrete piles to centre of dock. Built of squared coursed limestone ashlar walls, slightly battered with large squared granite coping, replaced with concrete to southeast end. Curved walls to all corners with iron ladders to southeast and northwest corners. Several cast-iron mooring ties and rings located to south and west perimeter. Enclosed to south and west by iron bollards and chain-fence with concrete and iron footbridge connecting south wall to apartment complex. - Harbour/dock/port, 1820–1840, Regional interest, registry number 50010129, https://www.buildingsofireland.ie/niah/search.jsp?type=record&county=DU®no=50010129. Pair of cast and wrought-iron winches, erected c.1830, to east side of lock linking Inner Dock with George's Dock. Comprising several iron cog-wheels on axles with crank handles and supported on pair of iron brackets fixed to granite base with replacement steel grille covering chute to water below. - Lock, 1810–1830, Regional interest, registry number 50010130, https://www.buildingsofireland.ie/niah/search.jsp?type=record&county=DU®no=50010130. Limestone lock, built c.1825, connecting George's Dock to Inner Dock. Pair of squared coursed limestone ashlar lock walls, slightly battered, with granite coping at ground level enclosing lock to east and west. Walls and coping form curved sections to either end where former lock gates were located, having limestone steps to both walls at north end only. Several granite bollards adjacent to granite coping with recently inserted iron bollards and chain-link fence. Lock gates no longer extant, with steel sheet to north end. Modern steel bridge inserted to south end with four rusticated granite ashlar piers supporting decorative iron lamps and steel parapet with timber finish. ## Ground and risks (Radon Risk Map of Ireland, EPA; Landslide Susceptibility Classification and LiDAR, Geological Survey Ireland) - Radon: at the centre of this parcel, about 1 in 20 homes in this area is likely to have high radon levels. Testing a home: https://www.epa.ie/environment-and-you/radon/radon-testing/#d.en.82887 - Landslides: The 1:50,000 map rates the landslide susceptibility here as low. Parts of the land are made ground. - Terrain model: LiDAR of the Office of Public Works, flown in 2011, at 2 m: tile OPW_3233, https://gsi.geodata.gov.ie/downloads/LiDAR/OPW_NASC/OPW_3233.zip (ZIP). - Flooding: the flood maps of the Office of Public Works, https://www.floodinfo.ie/map/floodmaps/, linked only: their licence does not allow re-use. LiDAR: contains Irish Public Sector Data (Geological Survey Ireland & the Office of Public Works) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. ## Neighbouring parcels within 25 m (Tailte Éireann) - Parcel 1737094: 26,206 m² (2.62 ha, 6.48 acres), https://everytownland.com/parcel/1737094.md - Parcel 3286105: 14,568 m² (1.46 ha, 3.6 acres), https://everytownland.com/parcel/3286105.md - Parcel 5254298: 9,367 m² (0.94 ha, 2.31 acres), https://everytownland.com/parcel/5254298.md - Parcel 1737111: 4,875 m² (0.49 ha, 1.2 acres), https://everytownland.com/parcel/1737111.md - Parcel 1875780: 4,472 m² (0.45 ha, 1.11 acres), https://everytownland.com/parcel/1875780.md - Parcel 1875785: 3,392 m² (0.34 ha, 0.84 acres), https://everytownland.com/parcel/1875785.md - Parcel 2848132: 2,764 m² (0.28 ha, 0.68 acres), https://everytownland.com/parcel/2848132.md - Parcel 2848121: 2,292 m² (0.23 ha, 0.57 acres), https://everytownland.com/parcel/2848121.md - Parcel 4687515: 2,271 m² (0.23 ha, 0.56 acres), https://everytownland.com/parcel/4687515.md - Parcel 4686657: 2,249 m² (0.22 ha, 0.56 acres), https://everytownland.com/parcel/4686657.md - Parcel 2848122: 2,248 m² (0.22 ha, 0.56 acres), https://everytownland.com/parcel/2848122.md - Parcel 2848136: 2,053 m² (0.21 ha, 0.51 acres), https://everytownland.com/parcel/2848136.md - Parcel 1875707: 2,011 m² (0.2 ha, 0.5 acres), https://everytownland.com/parcel/1875707.md - Parcel 4687745: 1,815 m², https://everytownland.com/parcel/4687745.md - Parcel 2848131: 1,680 m², https://everytownland.com/parcel/2848131.md - Parcel 3985995: 1,543 m², https://everytownland.com/parcel/3985995.md - Parcel 2848133: 1,313 m², https://everytownland.com/parcel/2848133.md - Parcel 2848130: 956 m², https://everytownland.com/parcel/2848130.md - Parcel 2848124: 734 m², https://everytownland.com/parcel/2848124.md - Parcel 1916206: 503 m², https://everytownland.com/parcel/1916206.md - Parcel 1875688: 483 m², https://everytownland.com/parcel/1875688.md - Parcel 2848128: 444 m², https://everytownland.com/parcel/2848128.md - Parcel 1875783: 322 m², https://everytownland.com/parcel/1875783.md - Parcel 2588992: 301 m², https://everytownland.com/parcel/2588992.md - Parcel 2848129: 273 m², https://everytownland.com/parcel/2848129.md - Parcel 4687693: 214 m², https://everytownland.com/parcel/4687693.md - Parcel 2848120: 180 m², https://everytownland.com/parcel/2848120.md - Parcel 1737097: 123 m², https://everytownland.com/parcel/1737097.md - Parcel 3986015: 98 m², https://everytownland.com/parcel/3986015.md - Parcel 2848119: 96 m², https://everytownland.com/parcel/2848119.md - Parcel 1875784: 85 m², https://everytownland.com/parcel/1875784.md - Parcel 2848126: 47 m², https://everytownland.com/parcel/2848126.md - Parcel 2848125: 43 m², https://everytownland.com/parcel/2848125.md - Parcel 6008964: 21 m², https://everytownland.com/parcel/6008964.md - Parcel 1737096: 9 m², https://everytownland.com/parcel/1737096.md ## Downloads - DXF, in Irish Transverse Mercator metres, with its neighbours and buildings, for a drawing program: https://everytownland.com/parcel/2407223.dxf - GeoJSON, in WGS 84, for a map: https://everytownland.com/parcel/2407223.geojson - KML, for Google Earth: https://everytownland.com/parcel/2407223.kml --- Everytownland reads the registered freehold land and the statutory boundaries of Tailte Éireann, the national zoning, planning file and heritage records of the Department of Housing, Local Government and Heritage, and the Residential Property Price Register. A parcel is the land of a title, not an address. The owner's name is in the Land Registry of Tailte Éireann: a copy of the folio can be ordered on landdirect.ie, for a fee; this site names no owner. A price is the price recorded for a past sale, not a valuation. Sources: Cadastral Parcels Freehold, Townlands, Civil Parishes, Baronies, Electoral Divisions and Buildings, Tailte Éireann, CC BY 4.0; national zoning of development plans (GZT, MyPlan) and National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0, applicants not shown; designated sites, National Parks and Wildlife Service, CC BY 4.0; Sites and Monuments Record, National Monuments Service, CC BY 4.0; National Inventory of Architectural Heritage, CC BY 4.0; Residential Property Price Register, Property Services Regulatory Authority, re-used with the source acknowledged. - Page: https://everytownland.com/parcel/2407223 - In JSON: https://everytownland.com/api/parcel/2407223