Greenway View, Kiltipper Road
Co. Dublin: the land, its zoning and planning, and every recorded sale since 2010
- Land parcels
- 22
- median 204 m²
- Median price
- €400,881
- 12 market sales since 2021
- Zoning
- R2
- RES, 20 of 22 parcels
- Planning
- 16
- applications within 15 m of the street since 2010
Estimate About €488,000 for a second-hand house here at 2026 prices; one sale in two between €391,000 and €609,000. Refine the estimate
Land parcels
Registered freehold land, within 15 m of the street
22 parcels, from 189 m² to 13,067 m² (1.31 ha, 3.23 acres), median 204 m².
Line of the street: © OpenStreetMap contributors, ODbL.
Zoning
Development plan, within 15 m of the street
- R2RES (Existing residential)
South Dublin County Development Plan 2022-2028, South Dublin The zoning objective in the plan
20 parcels of this street - G1OS (Open space, park)
South Dublin County Development Plan 2022-2028, South Dublin The zoning objective in the plan
1 parcel of this street
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0. A parcel counts in the zone its centre falls in.
Planning applications
Sites within 15 m of the street, newest first
21 Sept 2022Grant permission
Alteration of the external finish of the rear elevations of the duplex units to change from brick to plaster; This alteration also applies to the side and front of the end units to each row.
Permission, 22 homes · South Dublin County Council, SD22A/0365
17 Aug 2022Withdraw the application
The alterations of the external finish of the rear Elevations of the duplex units to change from brick to plaster. This alteration also applies to the side & front of the end units to each row.
Permission · South Dublin County Council, CE22/0032
27 Jun 2022Grant permission
Extension and alterations consisting of a 2 storey extension at the front main entrance of existing building (371.5sq.m ground floor addition & 367.5sq.m first floor addition); the extension will match the existing mansard roof profile; reorganisation of the first floor over an area of 272.2sq.m with the addition of 9 dormer windows; all associated services connections and ancillary site works.
Permission · South Dublin County Council, SD21A/0287
5 Mar 2018Grant permission
A residential development consisting of 70 dwelling units, consisting of 48 houses and 22 apartments to be provided as follows: 36 two storey, three bed semi-detached houses (Type A), 5 three storey, four bed detached houses (Type B), 7 three storey, four bed detached and semi-detached, face on houses (Type C), 3 no. three storey, duplex buildings to include 11 two bed ground floor apartments and 11 three bed apartments at first and second floor level. The development also includes vehicular and pedestrian access from Kiltipper Road, all associated site and infrastructural works including foul and surface water drainage, 127 surface car parking spaces, 6 visitor car parking spaces accessed off the private access road to the west, landscaping and open space, bin and bike store, cycle parking, boundary walls, fences, roads and footpaths, all on a site area of approximately 2.39 hectares. The site is located to the east of Ellensborough Green and a private access road to Kiltipper Woods Care Home.
Permission, 70 homes · South Dublin County Council, SD17A/0368
23 Jan 2018Grant permission
Extension to the existing facility by the addition of: Area 1 - construct a 27.65sq.m extension to the existing building by moving a wall out by 3.5m and forming a new wall, door and glazed panels; Area 2 - extend bedrooms 96, 97, 99, 100A & 100B out by 2.55m to make each of these bedrooms doubles, 45.63sq.m; Area 3 - construct a new room in the courtyard with an area of 24.4sq.m; Area 4 - construct a new room in the courtyard with an area of 35.9sq.m. All new areas are to have flat roofs and rainwater drainage connected to the existing.
Permission · South Dublin County Council, SD18A/0018
22 Jun 2017Part 8 approved by council
Dodder Greenway Route Scheme comprising: The proposed Dodder Greenway is being developed to be a Greenway of international renown and to be on a par with the best greenways in the world. Although developed as a combination of off road and on road it utilises existing facilities within the Dodder Valley as much as possible to connect the linear parkland along the route. The main elements of the proposed Greenway are as follows: • The Greenway route is approximately 14km in length and passes along the Dodder Valley from Orwell / Terenure through the outer suburbs of Tallaght to rural and upland Dublin to the entrance to the Bohernabreena reservoirs at Glenasmole. • It will provide for improved connectivity to communities, facilities and local business along the Dodder Valley corridor with a dedicated signage strategy. • Where commuting currently exists and demand is anticipated to continue, the scheme either ensures it is facilitated in a pedestrian priority environment with additional capacity for safe use at junctions or provide an alternative route for commuting cyclists where required. • The Greenway will generally consist of a shared 3-4m wide bound surface on the off road sections, tying into suitable bound surfacing for the on road sections. It is proposed to utilise enhanced variations to reflect local context. • Works will include widening and upgrade to existing paths, construction of new paths, the construction of a number of new bridges, upgrade of existing bridges and underpasses, junction upgrades, etc. • The upgrade and creation of new entrances to the Greenway. • Improved landscape treatment to provide a coherent and legible Greenway along the proposed Greenway. • Ecological enhancements including species rich grassland management, the planting of native trees and the provision of bat boxes. • Bat friendly public lighting will be provided both in new areas and in upgrading sections of existing lighting. • CCTV will be provided at a number of locations including each of the bridges. • Drainage measures including swales, signage, markings and ancillary works. The proposed works will comprise the following: Bohernabreena to Old Bawn Road • Upgrade of existing entrances to proposed Greenway • Improved environment for pedestrians and cyclists in a traffic calmed environment within Bohernabreena car park • Re-alignment of the entrance within the curtilage of Bohernabreena Reservoir a Protected Structure, Map Reference No.395 • Provision of traffic calming measures to cross the R114 into Kiltipper Park, at Ellensborough • Utilise existing shared surface through Kiltipper Park • Introduction of a new car park adjacent to Kiltipper Woods Care Centre. To minimise surface water runoff from this area the car park will be constructed using a geocell type product with gravel infill. • Shared street on access road to Kiltipper Woods Care Centre • Roundabout upgrade of existing roundabout on Kiltipper Way and Kiltipper Road junction • Revise road cross section between Kiltipper Road roundabout to Kiltipper Woods Care Centre access road. Road width to be narrowed to 6m with 2m cycle track and 2m footpath. • Revise road cross section between Kiltipper Woods Care Centre and Old Bawn Road. Road to be narrowed to 6m with provision of pedestrian facilities and traffic calming measures. • Upgrade to existing public lighting where required. • Incorporation of landscape plans and planting along Greenway to further detail Dodder Valley Park to M50 Underpass • Upgrade of existing entrances to proposed Greenway • Widen existing paths to 3.5-4m where possible to create shared surface. Widen path at edge furthest from river. • New 4m wide bridge over Dodder River at the Bolbrook Enterprise Centre and construct new 4m wide path to access road • Link path to Mount Carmel Park and change estate road to shared street • Upgrade junction geometry at Firhouse Road/Ballycullen Road junction • Existing underpass under M50 motorway to be upgraded and re-graded • Paths through parklands to include swales • New public lighting directed away from river edge • This section of the route passes through a pNHA (Proposed Natural Heritage Area) • Incorporation of landscape plans and planting along Greenway to further detail M50 Underpass to Firhouse Road • Upgrade of existing entrances to proposed Greenway • Widen existing paths to 3.5-4m where possible to createshared surface • Create linkages to the Firhouse Road with upgrade of entrance and new toucan crossing of Firhouse Road • Paths through parklands to include swales at certain locations • New public lighting • Realignment of existing paths at Spa link road underpass • Extension of existing car park at Cherryfield • Incorporation of landscape plans and planting along Greenway to further detail Firhouse Road to Kilvere • Upgrade of existing entrances to proposed Greenway • Reconfigure geometry of Firhouse Road/Old Bridge Road junction including removing the existing left slip lane off Old Bridge Road onto Butterfield Avenue • Revise road cross section from Firhouse Road/Old Bridge Road junction to Kilvere. Road width to be narrowed to 6m with 2m cycle track and 2m footpath. On street parking to be removed along Butterfield Avenue. • Shared street through Kilvere to Dodder Valley Park entrance • Upgrade to existing public lighting where required. • Upgrade of existing entrances to proposed greenway • Upgrade of existing cycle and pedestrian facilities on Firhouse Road • Incorporation of landscape plans and planting along Greenway to further detail Kilvere to Springfield Avenue • Upgrade of existing entrances to proposed Greenway • Widen existing paths to 3.5-4m where possible to create shared surface • New 4m wide bridge over Dodder River at Riverside Cottages, which is an Architectural Conservation Area, and construct 4m wide path linking to roadway and link to existing footpath to north of river, upgrading shared street from Riverside Cottages to Templeogue. • Path to ramp up to Springfield Avenue to link with a shared surface and an alternative narrower path is to join in with the existing underpass. • Upgrade to existing public lighting where required • New public lighting within park area. • Incorporation of landscape plans and planting along Greenway to further detail. Springfield Avenue to Rathfarnham Road Junction • Upgrade of existing entrances to proposed Greenway • Reduce carriageway width down to 6.5m and form a 4m wide shared surface along the northern side of the carriageway. The existing footpath, cycle track and shared surface along the southern side of the carriageway is to be retained. • New paths and toucan crossing at Fairways junction. • Upgrade existing car parking at Owendoher River. • New 4m wide bridge over Dodder River at Bushy Park, the bridge is to connect directly into the Park north of existing wall where required. Provide path linkage from new path to existing paths along southern side the River. • New car park opposite the bridge location, in open space adjacent to Springfield Avenue. • New toucan crossing across Springfield Avenue • New 4m wide shared path through green area at Woodview Cottages and shared street along on Church Lane to Rathfarnham Main Street. • Upgrade to existing public lighting where required. • Incorporation of landscape plans and planting along Greenway to further detail. Rathfarnham Road Junction • Upgrade of existing entrances to proposed Greenway • Revised junction geometry to improve pedestrian and cycle facilities • Widen Springfield Avenue and Dodder Park Road approaches to the junction to facilitate the junction upgrade • Upgrade to existing public lighting where required • Incorporation of landscape plans and planting along Greenway to further detail. Rathfarnham Road Junction to Orwell Park • Upgrade of existing entrances to proposed Greenway • Upgrade of shared street along Dodder Road Lower adjacent to park area at junction • Existing shared surface along the River to be maintained and upgraded as necessary • New 4m wide bridge over Dodder River at Orwell Park. • Upgrade of existing pathways to allow tie in to Orwell Park • Upgrade to existing public lighting where required • Incorporation of landscape plans and planting along Greenway to further detail the proposed Greenway will be subject to a landscape plan, signage plan and ecological and environmental enhancements for the proposed greenway route. All ancillary works are included in the proposals. Plans and particulars of the proposed scheme will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy from Thursday 22nd of June to Friday 18th of August at the following locations: • South Dublin County Council Offices, County Hall, Tallaght, Dublin 24 between the hours of 9:00am – 5.00pm Monday to Thursday and 9.00am - 4.30pm on Friday (Inspection only) between the hours of 9:00am – 4.00pm Monday to Thursday and 9.00am – 3.30pm on Friday (Inspection and Purchase) • County Library, Tallaght, Dublin 24, between the hours of 9.45am to 8.00pm Mon to Thurs, 9.45am to 4.30pm Fri to Sat. Closed Saturdays and Mondays of Bank Holiday Weekends (Inspection only) • Ballyroan Library, Orchardstown Avenue, Rathfarnham, Dublin 14, between the hours of 9:45am – 8.00pm Mon to Thurs, 9.45am – 4.30pm Fri to Sat. Closed Saturdays and Mondays of Bank Holiday Weekends (Inspection only) • Dublin City Council Offices, Wood Quay, Dublin 8 between the hours of 9:00am – 5.00pm Monday to Friday (Inspection and Purchase). An Ecological Impact Assessment Report has been prepared in respect of the proposed works. The proposed Scheme has undergone Appropriate Assessment Screening under the Habitats Directive (92/43/EEC) and Environmental Impact Assessment Screening under the EIA Directive 2014/52/EU. The documents are also available to view on the Council’s Public Consultation Portal website http://consult.sdublincoco.ie Submissions Submissions and observations on the Part 8 Proposed Dodder Greenway Route can be made online and in writing to the addresses below between Thursday 22nd of June to Friday 18th of August inclusive (excluding Public Holidays) as follows: • Online: at https://consult.sdublincoco.ie up to Midnight on the Friday 18th of August 2017 • By Post: In writing to the Senior Executive Officer, Forward Planning Section, Land Use, Planning and Transportation, County Hall, Tallaght, Dublin 24 up to 4.00pm on the Friday 18th of August 2017. Only submissions received by Friday 18th August 2017 and addressed as set out above, will be considered. Submissions cannot be accepted in any other format or to any other postal address. Submissions and observations should state the name, address, and where relevant the body represented. All comments including the names and addresses of those making the comments, submitted to the Council in regarding the Part 8 Dodder Greenway Route will form a report to be presented to South Dublin County Council, and will form part of a public document.
Application under part 8 · South Dublin County Council, SD178/0003
25 May 2017Grant permission
138sq.m single storey extension to previously approved southern extension providing four ensuite bedrooms, a sitting room, nurse's station and 1 surface car park space.
Permission · South Dublin County Council, SD17A/0162
27 Nov 2009Grant permission
Proposed alterations and additions to recently approved proposals, Ref. SD08A/0557 for Kiltipper Woods Care Home, to comply with new guideline standards as contained in the Health Information Quality Authority (HIQA) latest national care standards document for care homes for the elderly. The additions to the approved extension include: additional fire escape stairs from first floor at south wing; rearrangement and enlargement of staff training room to first floor; addition of ground floor treatment room, smoking lounge and therapy rooms, and Occupational Therapy Office adjacent to Hydrotherapy Pool. The additions to the approved existing building are all at ground floor level and include: extensions to 7 no. double bedrooms to provide ensuites; splitting and extension of 4 bed ward to create 2 no. double bedrooms with ensuites; addition of sun lounge to courtyard, therapy room and therapy office to south east corner; and coffee shop next to main kitchens for visitor welfare. The works also include for revised hard and soft landscape and drainage proposals.
Permission · South Dublin County Council, SD09A/0457
20 Jan 2009Grant permission
Extension to existing nursing care home to provide additional 22 no. single ensuite bedrooms and associated living accommodation; with physiotherapy and hydrotherapy wing all at ground floor; and staff training, staff change and laundry accommodation at first floor level. The extension will be connected to the existing home at ground and first floor levels. The works will also include substantial tree screening, landscaping features and provision of walkway to the boundary of the site and ancillary engineering works.
Permission · South Dublin County Council, SD08A/0557
21 Jun 2007Refuse permission
Extension of existing care centre comprising the provision of 44no. bedrooms and supporting facilities in one and two storey format, provision of additional car parking and cycle parking, and all associated ancillary services, works and landscaping.
Permission · South Dublin County Council, SD07A/0477
12 Jan 2006Grant permission for retention
First floor extension of residential nursing care accommodation over existing nursing home within the roofspace of the existing structure: the proposal also includes additional car parking provision. The revised proposal now includes for a 1.5m wide walkway and safety railings to be carried out along with the other works listed in the foregoing.
Retention · South Dublin County Council, SD05A/0779
28 Jun 2004Grant permission
Construct all weather playing pitch, providing 6 no. 21 metre high flood lighting poles and 3 metre high perimeter fencing.
Permission · South Dublin County Council, SD03A/0912
2 Jan 2003Invalid - site notice
Minor works involving retention of existing equipment container and associated palisade fencing and the placing of No. 3 GSM panel antennas, and No. 1 Transmission link dish mounted on and existing 13m wooden pole safety net support.
Retention · South Dublin County Council, SD03A/0004
1 Nov 2002Withdraw the application
Retention of existing no. 3 GSM panel antennas, no. 1 transmission link dish mounted on a 13m wooden safety support pole, plus equipment cabin.
Retention · South Dublin County Council, SD02A/0512
12 Feb 2002Grant permission
New residential care unit and renovation and conversion of existing Kiltipper House, to provide residential staff accommodation. The proposals include for partial demolition, site works, open amenity space and vehicular entrance of existing access road on Kiltipper Road.
Permission · South Dublin County Council, S02A/0084
29 Mar 1999Withdraw the application
50 no. residential units consisting of 40 no. 2 bed apartments located in 6 no. 2 storey blocks, 3 no. 2 and 3 bed terraced town houses and conversion, renovation and extension of existing Kiltipper House and outbuildings to provide 6 no. 1 and 2 bed single storey units and 1 no. 3 bed two storey unit including partial demolition, associated site works and open spaces and new vehicular entrance off existing Kiltipper Road on site of circa 4.3 acres.
Permission · South Dublin County Council, S99A/0193
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Median price by year
Years with three market sales or more
| Year | Median price | Sales |
|---|---|---|
| 2023 | €411,894 | 7 |
| 2022 | €400,881 | 5 |
Every recorded sale
12 sales, newest first
| Date | Address, as recorded | Price |
|---|---|---|
| 9 Feb 2023 | 14 Greenway View, Kiltipper Road (new, excl. VAT) | €396,476 |
| 7 Feb 2023 | 8 Greenway View, Kiltipper Road (new, excl. VAT) | €411,894 |
| 27 Jan 2023 | 4 Greenway View, Kiltipper Road, Tallaght (new, excl. VAT) | €396,475 |
| 20 Jan 2023 | 6 Greenway View, Kiltipper Road (new, excl. VAT) | €411,894 |
| 13 Jan 2023 | 2 Greenway View, Kiltipper Road (new, excl. VAT) | €484,581 |
| 9 Jan 2023 | 20 Greenway View, Kiltipper Road (new, excl. VAT) | €411,894 |
| 3 Jan 2023 | 22 Greenway View, Kiltipper Road, Tallaght (new, excl. VAT) | €475,000 |
| 30 Nov 2022 | 7 Greenway View, Kiltipper Road D24DDH2 (new, excl. VAT) | €400,881 |
| 17 Nov 2022 | 3 GREENWAY VIEW, KILTIPPER ROAD, TALLAGHT (new, excl. VAT) | €383,259 |
| 16 Nov 2022 | 21 Greenway View, Kiltipper Road, Dublin 24 (new, excl. VAT) | €400,881 |
| 16 Nov 2022 | 19 Greenway View, Kiltipper Road, Tallaght (new, excl. VAT) | €392,070 |
| 16 Nov 2022 | 15 Greenway View, Kiltipper Road, Tallaght (new, excl. VAT) | €400,881 |
Source: Residential Property Price Register, Property Services Regulatory Authority. Sales marked “not full market price” are left out of every median.