Tor Bui, Cappagh Road
Co. Galway: the land, its zoning and planning, and every recorded sale since 2010
- Land parcels
- 48
- median 165.5 m²
- Median price
- —
- 2 market sales since 2021, too few
- Zoning
- R3
- Residential, 46 of 48 parcels
- Planning
- 1
- applications within 15 m of the street since 2010
Estimate About €574,000 for a second-hand house here at 2026 prices; one sale in two between €495,000 and €663,000. Refine the estimate
Land parcels
Registered freehold land, within 15 m of the street
48 parcels, from 31 m² to 17,268 m² (1.73 ha, 4.27 acres), median 165.5 m².
Line of the street: © OpenStreetMap contributors, ODbL.
Zoning
Development plan, within 15 m of the street
- R3Residential (Residential, mixed residential and other uses)
Galway City Development Plan 2023 - 2029, Galway The zoning objective in the plan
46 parcels of this street - G1Recreation and Amenity (Open space, park)
Galway City Development Plan 2023 - 2029, Galway The zoning objective in the plan
No parcel of this street has its centre in it
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0. A parcel counts in the zone its centre falls in.
Planning applications
Sites within 15 m of the street, newest first
9 Feb 2026Conditional
Permission for development which consists of: The development will consist of a Park & Ride facility comprising a total of 176 car parking spaces, including 133 standard bays, 9 bays for mobility-impaired users (6 standard, 1 for electric vehicles, 1 futureproofed for electric vehicles and 1 large ), 17 bays designated for electric vehicles, and a further 17 bays futureproofed for electric vehicle use. The facility will also include 4 bus bays, passenger shelters and hardstanding area for bike shelters. The layout of the existing roundabout at the junction of Cappagh Road and Western Distributor Road will be relocated approximately 11 metres westward and redesigned to facilitate a new western arm providing access to the facility, along with new active travel infrastructures. A short section of the Tonabrocky stream will be realigned with installation of four new cross-drainage structures and the extension of one existing culvert. The scheme will further include two new pedestrian links to the south connecting the proposed development to existing footpaths located north of the Gaelic Football/Soccer pitch within Knocknacarra Community Centre. Additional works will comprise hard and soft landscaping, planting, lighting, boundary treatments, surface water drainage infrastructure, public lighting, CCTV, an ESB substation, and all associated and ancillary site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority.
Permission · Galway City Council, 2660032
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Every recorded sale
11 sales, newest first
| Date | Address, as recorded | Price |
|---|---|---|
| 27 Aug 2026 | 39 TOR BUI, CAPPAGH RD, GALWAY CITY H91PF6E (not full market price) | €387,000 |
| 20 Feb 2026 | 8 TOR BUI, CAPPAGH RD, BARNA H91XEW0 | €705,000 |
| 21 Oct 2025 | 16 TOR BUI, CAPPAGH RD, GALWAY H91ND3C | €450,000 |
| 28 Jun 2016 | 32 TOR BUI, CAPPAGH ROAD, BARNA | €238,000 |
| 18 Sept 2015 | 15 TOR BUI, CAPPAGH RD, GALWAY | €245,000 |
| 21 May 2015 | 16 TOR BUI, CAPPAGH RD, GALWAY | €243,000 |
| 5 Sept 2013 | 11 Tor Bui, Cappagh Road | €203,000 |
| 20 Jul 2012 | 22 Tor Bui, Cappagh Road, Barna | €160,000 |
| 1 Jun 2012 | 10 Tor Bui, Cappagh Road, Galway | €158,000 |
| 17 Feb 2011 | No. 17, Tor Bui, Cappagh Road | €242,000 |
| 6 Aug 2010 | 25 Tor Bui, Cappagh Road, Galway | €237,500 |
Source: Residential Property Price Register, Property Services Regulatory Authority. Sales marked “not full market price” are left out of every median.