Carr's Hill, Douglas
Co. Cork: the land, its zoning and planning, and every recorded sale since 2010
Parcel 4545599
- Area
- 264,355 m² (26.44 ha, 65.32 acres)
- Buildings
- No building touches it.
- Zoning
- P5 City Hinterland (Cork City Development Plan 2022-2028) The objective
- Townland
- Ballinrea
Planning applications on this parcel
4 Aug 2026Awaiting recommendation
Permission for construction of two storey dwelling house, detached domestic garage, splayed entrance. sewerage treatment system and all associated site works
Permission · Cork County Council, 26/2062
17 Sept 2024Refused
Permission for construction of two storey dwelling house, detached domestic garage, splayed entrance, sewerage treatment system and all associated site works
Permission · Cork County Council, 24/5748
20 Dec 2023Conditional
Permission for a) the demolition of existing dwelling and b) construction of a new family home, c) installation of a new treatment unit and percolation area, together with all associated site development works.
Permission · Cork County Council, 23/6559
3 Jul 2023Refused
Permission for a single storey residential care unit for service users with intellectual disabilities; consisting of 2 self-catering residential units; 3 bedroom respite area; one bedroom staff accommodation; detached store with covered link to main building; waste water treatment unit with associated percolation area; associated site works and upgrade of existing site entrance.
Permission · Cork County Council, 23/5357
29 Mar 2023Conditional permission
Modifications to the permitted solar farm (Pl. Ref. No.: 17/6784, ABP Ref. PL04.303013). The modifications are within the boundary of the permitted development and will consist of: i) Changes to the layout and dimensions of the permitted solar photovoltaic layout which will decrease the solar photovoltaic footprint from c. 159,100 sq.m of solar panels, to c. 145,000 sq.m of solar panels on ground mounted frames (this modification is to allow for the inclusion of a proposed 110kV substation and grid connection which will be subject to a separate application); ii) Amendments to the internal track layout and the removal of the permitted battery storage unit; iii) 6 no. single storey inverter/transformer stations (reduced from 10 no. permitted inverter/transformer stations). Permission is also sought for the provision of a 33kV internal network cable (c. 3,760m underground with c. 114m of overhead line) linking the Ballinrea solar farm with the Ballinvuskig solar farm (c. 1.74 km to the northwest). The proposed development includes all associated site works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and the NIS will be submitted to the Planning Authority with the application.
Permission · Cork County Council, 23/4563
21 Dec 2021Conditional
The refurbishment and extension of existing dwelling together with all associated site development works.
Permission · Cork County Council, 21/7455
1 Nov 2017Conditional permission
A solar farm consisting of circa 159,100 m2 of solar panels on ground mounted frames, 1 no. substation, 10 no. single storey inverter/transformer stations, battery storage module and associated equipment building, security fencing, satellite pole, CCTV and all associated ancillary development works. Construction and operational access to the site will be via the existing entrance from the L2464.
Permission · Cork County Council, 17/6784
9 Oct 2017Incompleted application
A solar farm consisting of circa 159,100 m2 of solar panels on ground mounted frames, 1 no. substation, 10 no. single storey inverter/transformer stations, battery storage module and associated equipment building, security fencing, satellite pole, CCTV and all associated ancillary development works. Construction and operational access to the site will be via the existing entrance from the L2464.
Permission · Cork County Council, 17/6617
2 Feb 2009Withdrawn
Construction of 2 no. 18 hole golf courses and associated practice areas, reserved site for future clubhouse application (permission now being sought for proprietary effluent treatment system for future clubhouse), demolition of existing properties on site to include 1 no. habitable dwelling and agricultural sheds,conversion of 1 no. habitable dwelling to staff facilities,construction of replacement two storey dwellinghouse over basement with waste water treatment system on separate adjoining site, construction of primary maintenance facility & satellite/secondary maintenance facility with individual proprietary waste water treatment units and all ancillary works and alterations to include groundworks and alterations to ground levels and landscaping.The primary maintenance facility (incorporating staff facilities building, sand bays,fuel tank,chemical/fuel store, wash bays, machinery storage shed, conversion of farm building to workshop & ancillry parking)will be accessed from an existing farm access to the southwest of the site, the upgrade of the farm access road & culverts are also proposed, service access is also sought to secondary maintenance facility (incorporating sand bays, machinery storage shed, fuel tank & ancillary parking) off the board of works road to the north, removal of existing mobile phone mast on the lands, undergrounding of ESB cables, ancillary car parking adjacent to the future clubhouse reserved site. Leisure facilities are proposed (inclusing 2no. outdoor tennis courts, a bowling green & a building to house 2no. indoor tennis courts & ancillary changing facilities), golf academy facility to include buggy shed and storage shed for golf equipment, 9 hole academy course, driving range/practice & learning facility & attendant driving range bays,bus parking areas,turf nurserys,footbridges, boreholes, irrigation facilities & water features, revision of site levels (allowing increases, decreases & regrading of existing ground levels), hard & soft landscaping & all associated earthworks. The construction of temporary construction & operational access from the existing N28, the construction of a new parmanent access from ,and modifications to,the Board of Works road to the north, modifications to the N28 to allow for acceleration & deceleration lanes & a dedicated right turn lane off the N28 all on a landholding of c.200Ha
Permission · Cork County Council, 09/4297
23 Dec 2008Incompleted application
2no. 18-hole golf courses & associated practice areas & 9-hole short course area, reserved site for future clubhouse application (permission now being sought for an effluent treatment system for that future clubhouse), demolition of existing properties on site including 1no. habitable dwelling & miscellaneous agricultural sheds, conversion of 1no.habitable dwelling to staff facilities, construction of a replacement two-storey dwellinghouse over basement with individual wastewater treatment system on a separate adjoining site at Ballinrea South, all ancillary works & alterations including groundworks & alteration of ground levels & landscaping.The proposed golf club will also allow for ancillary development including 2no. maintenance facilities with associated structures (The northern maintenance facility will be a secondary/satellite facility to the main one), the primary maintenance facility (incorporating staff facilities building, sand bays, wash bays, machinery storage shed, workshop & ancillry parking)will be assessed from an existing farm access to the southwest of the site, the upgrade of the farm access road & culverts are also proposed, service access to secondary maintenance facility (incorporating sand bays, machinery storage shed & ancillary parking) off the board of works road to the north, removal of existing mobile phone mast on the lands, undergrounding of ESB cables, ancillary car parking adjacent to the future clubhouse reserved site & leisure facilities now proposed (inclusing 2no. outdoor tennis courts, a bowling green & a building to house 2no. indoor tennis courts & ancillary changing facilities), golf academy facility with 9-hole academy course, driving range/practice & learning facility & attendant driving range bays, turf nurserys, footbridges, boreholes, irrigation facilities & water features, revision of site levels (allowing increases, decreases & regrading of existing ground levels), hard & soft landscaping & all associated earthworks. The construction of temporary construction & operational access from the existing N28, the construction of a new parmanent access from the Board of Works road to the north, modifications to the N28 to allow for acceleration & deceleration lanes & a dedicated right turn lane off the N28 all on a landholding of c.200Ha
Permission · Cork County Council, 08/10388
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Designated sites
No designated site (Special Area of Conservation, Special Protection Area, Natural Heritage Area or proposed one) touches this parcel.
Recorded monuments around it
This parcel is in the zone of notification of 2 recorded monuments.
- CO086-028 Ringfort - rath
Description
In tillage, on E-facing slope. Shown on 1933 OS 6-inch map as circular enclosure (diam. c. 40m). According to local information, levelled c. 1979. No visible surface trace. The above description is derived from the published 'Archaeological Inventory of County Cork. Volume 2: East and South Cork' (Dublin: Stationery Office, 1994). In certain instances the entries have been revised and updated in the light of recent research. Date of upload/revision: 14 January 2009
- CO086-131 Enclosure
Description
The Archaeological Survey of Ireland (ASI) is in the process of providing information on all monuments on The Historic Environment Viewer (HEV). Currently the information for this record has not been uploaded. To access available information for research purposes please make an appointment in advance with the Archive Unit (open Fridays 10.00 am – 5.00 pm), Department of Housing, Local Government and Heritage, The Custom House, Dublin 1 D01W6XO or email NMarchive@housing.gov.ie.
Designated sites: National Parks and Wildlife Service. Recorded monuments: Sites and Monuments Record, National Monuments Service. Department of Housing, Local Government and Heritage, CC BY 4.0. Works at or in relation to a recorded monument need two months' written notice to the National Monuments Service (National Monuments (Amendment) Act 1994, section 12).
Download this parcel: DXF, in Irish Transverse Mercator metres, with its neighbours and buildings, for a drawing program; GeoJSON, in WGS 84, for a map.
Registered freehold land, Tailte Éireann, CC BY 4.0. A parcel is the land of a title, not an address. The owner's name is in the Land Registry of Tailte Éireann: a copy of the folio can be ordered on landdirect.ie, for a fee.
- Land parcels
- 29
- median 10,273 m²
- Median price
- —
- 3 market sales since 2021, too few
- Zoning
- P5
- City Hinterland, 18 of 29 parcels
- Planning
- 4
- applications within 15 m of the street since 2010
Estimate About €384,000 for a second-hand apartment here at 2026 prices; one sale in two between €320,000 and €449,000. Refine the estimate
Land parcels
Registered freehold land, within 15 m of the street
29 parcels, from 164 m² to 405,817 m² (40.58 ha, 100.28 acres), median 10,273 m².
Line of the street: © OpenStreetMap contributors, ODbL.
Zoning
Development plan, within 15 m of the street
- P5City Hinterland (Mixed/general primary sector uses, including 'rural')
Cork City Development Plan 2022-2028, Cork The zoning objective in the plan
18 parcels of this street - R1New Residential Neighbourhoods (New/proposed residential)
Cork City Development Plan 2022-2028, Cork The zoning objective in the plan
3 parcels of this street - R2Sustainable Residential Neighbourhoods (Existing residential)
Cork City Development Plan 2022-2028, Cork The zoning objective in the plan
1 parcel of this street - G1Public Open Space (Open space, park)
Cork City Development Plan 2022-2028, Cork The zoning objective in the plan
No parcel of this street has its centre in it
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0. A parcel counts in the zone its centre falls in.
Planning applications
Sites within 15 m of the street, newest first
9 Dec 2025Grant with conditions
Permission for construction of an agricultural livestock shed with underground slatted slurry storage tanks and handling facilities and all associated siteworks.
Permission · Cork County Council, 25/6725
1 Feb 2024Conditional
For a 10 year planning permission for a Large-Scale Residential Development (LRD) at Castletreasure, Moneygurney and Maryborough (townlands), Douglas, Cork. The development will consist of: the demolition of an existing dwelling house and associated agricultural outbuildings and the construction of a mixed-use residential development of 580 no. residential units consisting of 263 no. dwelling houses and 317 no. apartment/duplex units and all ancillary site development works. The proposed development also includes a 2-storey 122 no. child capacity creche and a 2-storey mixed-use building with retail and café uses at ground floor and 2 no. commercial/retail service units at first floor level. The 263 no. dwelling houses will include 88 no. 4 bedroom semi-detached dwelling houses, 4 no. 4 bedroom townhouses, 136 no. 3 bedroom semi-detached dwelling houses,18 no. 3 bedroom townhouses and 17 no. 2 bedroom townhouses. The proposed 317 no. apartment/duplex units will include 8 no. 3 bedroom units, 218 no. 2 bedroom units and 91 no. 1 bedroom units to be provided in 27 no. apartment/duplex buildings ranging in height from 2–4 storeys over basement. The proposed development makes provision for the construction of a section and extension of the Ballybrack Valley Pedestrian & Cycle Route and for pedestrian and cycle connections to the proposed Ballybrack Valley Pedestrian & Cycle Route. The proposed development also includes minor modifications to the residential development to the north permitted by An Bord Pleanála reference 304367-19, which include amendments to the permitted boundary treatments, public open space and the creation of vehicular, pedestrian and cycle connections. Access to the proposed development will be via a proposed vehicular bridge over the Moneygurney Stream to a new junction on the existing Carr’s Hill/Carrigaline Road (R609). An alternative access to the lands is also proposed and which integrates with the Carr’s Hill/Carrigaline Road (R609) upgrades and Carr’s Hill Junction permitted by the M28 Cork to Ringaskiddy Motorway Scheme (An Bord Pleanála References 04.HA0053 and 04.MA0014) which will be implemented once the M28 Motorway scheme is operational. Ancillary site works include the provision of bicycle parking and bin storage facilities, landscaping and servicing proposals including the diversion of existing underground service infrastructure and the delivery of upgrades to the footpath and foul sewer network on Carr’s Hill/Carrigaline R
Permission · Cork City Council, 2442632
2 Feb 2009Withdrawn
Construction of 2 no. 18 hole golf courses and associated practice areas, reserved site for future clubhouse application (permission now being sought for proprietary effluent treatment system for future clubhouse), demolition of existing properties on site to include 1 no. habitable dwelling and agricultural sheds,conversion of 1 no. habitable dwelling to staff facilities,construction of replacement two storey dwellinghouse over basement with waste water treatment system on separate adjoining site, construction of primary maintenance facility & satellite/secondary maintenance facility with individual proprietary waste water treatment units and all ancillary works and alterations to include groundworks and alterations to ground levels and landscaping.The primary maintenance facility (incorporating staff facilities building, sand bays,fuel tank,chemical/fuel store, wash bays, machinery storage shed, conversion of farm building to workshop & ancillry parking)will be accessed from an existing farm access to the southwest of the site, the upgrade of the farm access road & culverts are also proposed, service access is also sought to secondary maintenance facility (incorporating sand bays, machinery storage shed, fuel tank & ancillary parking) off the board of works road to the north, removal of existing mobile phone mast on the lands, undergrounding of ESB cables, ancillary car parking adjacent to the future clubhouse reserved site. Leisure facilities are proposed (inclusing 2no. outdoor tennis courts, a bowling green & a building to house 2no. indoor tennis courts & ancillary changing facilities), golf academy facility to include buggy shed and storage shed for golf equipment, 9 hole academy course, driving range/practice & learning facility & attendant driving range bays,bus parking areas,turf nurserys,footbridges, boreholes, irrigation facilities & water features, revision of site levels (allowing increases, decreases & regrading of existing ground levels), hard & soft landscaping & all associated earthworks. The construction of temporary construction & operational access from the existing N28, the construction of a new parmanent access from ,and modifications to,the Board of Works road to the north, modifications to the N28 to allow for acceleration & deceleration lanes & a dedicated right turn lane off the N28 all on a landholding of c.200Ha
Permission · Cork County Council, 09/4297
23 Dec 2008Incompleted application
2no. 18-hole golf courses & associated practice areas & 9-hole short course area, reserved site for future clubhouse application (permission now being sought for an effluent treatment system for that future clubhouse), demolition of existing properties on site including 1no. habitable dwelling & miscellaneous agricultural sheds, conversion of 1no.habitable dwelling to staff facilities, construction of a replacement two-storey dwellinghouse over basement with individual wastewater treatment system on a separate adjoining site at Ballinrea South, all ancillary works & alterations including groundworks & alteration of ground levels & landscaping.The proposed golf club will also allow for ancillary development including 2no. maintenance facilities with associated structures (The northern maintenance facility will be a secondary/satellite facility to the main one), the primary maintenance facility (incorporating staff facilities building, sand bays, wash bays, machinery storage shed, workshop & ancillry parking)will be assessed from an existing farm access to the southwest of the site, the upgrade of the farm access road & culverts are also proposed, service access to secondary maintenance facility (incorporating sand bays, machinery storage shed & ancillary parking) off the board of works road to the north, removal of existing mobile phone mast on the lands, undergrounding of ESB cables, ancillary car parking adjacent to the future clubhouse reserved site & leisure facilities now proposed (inclusing 2no. outdoor tennis courts, a bowling green & a building to house 2no. indoor tennis courts & ancillary changing facilities), golf academy facility with 9-hole academy course, driving range/practice & learning facility & attendant driving range bays, turf nurserys, footbridges, boreholes, irrigation facilities & water features, revision of site levels (allowing increases, decreases & regrading of existing ground levels), hard & soft landscaping & all associated earthworks. The construction of temporary construction & operational access from the existing N28, the construction of a new parmanent access from the Board of Works road to the north, modifications to the N28 to allow for acceleration & deceleration lanes & a dedicated right turn lane off the N28 all on a landholding of c.200Ha
Permission · Cork County Council, 08/10388
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Median price by year
Years with three market sales or more
| Year | Median price | Sales |
|---|---|---|
| 2019 | €270,000 | 5 |
Every recorded sale
11 sales, newest first
| Date | Address, as recorded | Price |
|---|---|---|
| 17 Dec 2025 | Unit 14 Block C, Carr's Hill, Douglas (new, excl. VAT) | €229,015 |
| 25 Oct 2022 | APT 11 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS T12VH73 | €330,000 |
| 5 Sept 2022 | APT 16 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS T12FE44 | €350,000 |
| 20 Dec 2019 | APT 11 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS | €275,000 |
| 21 Nov 2019 | APT 10 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS | €270,000 |
| 24 Oct 2019 | APT 4 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS | €250,000 |
| 29 Apr 2019 | APT 22 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS | €280,000 |
| 25 Feb 2019 | APT 5 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS | €268,000 |
| 17 Dec 2018 | APT 6 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS | €265,000 |
| 26 Oct 2018 | APT 16 BLOCK H TEMPLE GROVE, CARR'S HILL, DOUGLAS | €275,000 |
| 30 Jun 2016 | 2 CARRS HILL, DOUGLAS, CORK | €1,320,000 |
Source: Residential Property Price Register, Property Services Regulatory Authority. Sales marked “not full market price” are left out of every median.