Celbridge Road, Leixlip
Co. Kildare: the land, its zoning and planning, and every recorded sale since 2010
Parcel 1053555
- Area
- 328,293 m² (32.83 ha, 81.12 acres)
- Buildings
- 19 buildings touch it, 86,481 m² on the ground
- Zoning
- No zone of a development plan covers it in the national zoning. Outside zoned towns and villages, the county development plan's rural policies apply.
- Townland
- Parsonstown
Planning applications on this parcel
11 Feb 2026Conditional
Extension of Duration: 20/873: the construction of a logistics warehouse with ancillary office accommodation (total c. 25,268 sqm) to an overall height of 14.86 metres. The warehouse element of the development is principally single storey including an ancillary mezzanine level (554 sqm). The ancillary offices, comprising c. 1,737 sqm, are provided over three storeys and include toilets, change rooms, showers, cafeteria, gym, plant areas and circulation spaces. The proposed development will also include: the provision of a new vehicular access from Barnhall Road roundabout with ancillary associated entry/exit gates, access road and footpath; 179 no. surface car parking spaces including electric vehicle charging stations and 18 no. bicycle parking; solar pv panels on the warehouse roof; hard and soft landscaping; signage; sprinkler storage tanks and pump house; an electrical substation (c. 54 sqm); and all ancillary works including boundary treatments, street lighting, site excavation and development works above and below ground. The site is principally bounded by: Liffey Business Campus to the north; Barnhall Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At this site of c. 8.19 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
Extension of duration · Kildare County Council, 2621
13 Oct 2025Conditional
works to uprate the existing Rinawade – Dunfirth Tee – Kinnegad 110kV overhead line (OHL). Within County Kildare, the proposed development will take place within the following townlands: Confey, Parsonstown, Barnhall, Easton, Rinawade Upper, Rinawade Lower, Castletown, Oldcarton, Nicholastown, Killickaweeny, Cappagh, Newtown, Ballynakill, Ballyvoneen, Dysart, Dunfierth, Coolree, Kilmurry, Thomastown, Kilshanchoe, Clonagh, Cadamstown, Tanderagee, Calfstown, Ballinderry, Balrinnet, Kilglass, Nurney, Williamstown, Ballindoolin, Carrick, Grange East, Rahin. The Rinawade - Dunfirth Tee - Kinnegad 110 kV OHL circuit runs through County Meath, County Kildare and County Offaly. It is 54 km in length and travels from Kinnegad 110 kV substation in Killaskillen (County Meath) and traverses southeast where a short loop into Dunfirth 110 kV substation in Dunfirth (County Kildare) exists. The line then continues southeast where it terminates at Rinawade 110kV substation in Rinawade Lower (County Kildare). The OHL has a total of 249no. supporting structures. Within the functional area of Kildare County Council, there is 30.66 km of the existing OHL circuit, with 140 no. structures. Within the functional area of Meath County Council there is 23.16 km, with 107 no. structures, and within the functional area of Offaly County Council there is 0.42 km, with 2 no. structures. Separate planning applications will be lodged with Meath County Council and Offaly County Council. The proposed development within Co. Kildare will comprise: the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between structure numbers 93 - 153, 224 - 226, and 240 - 247; the strengthening of tower foundations at 9no. locations; the strengthening of towers (i.e., member replacement) at 14no. locations; the painting of towers at 15no. locations; shear block remedial works of towers at 1no. location; the replacement of polesets at 43no. locations, with similar structures. There will be no change in height at 6no. poleset replacements. There will be height increases between 0.1m and 2.0m at 33no. poleset replacements. Poleset numbers 67, 72 and 132 will increase in height no greater than 3.0m, and poleset number 151 will increase in height no greater than 4.0m; the replumbing of polesets at 14no. locations; the replacement of insulating and ancillary hardware at all structures where conductor wires will be replaced; the replacement of stay wire/a
Permission · Kildare County Council, 2561155
8 Apr 2025Conditional
for 6 No. new lighting pole standards with energy efficient LED lamp / flood lights no more than 18.5 metres high, to provide illumination to the existing training pitches. Inclusive of all associated site works
Permission · Kildare County Council, 2560367
8 Sept 2023Conditional
will consist of a proposed single storey extension to the east of the existing clubhouse, comprising of 4 no. changing rooms with shower facilities attached, 2 no. referee rooms with a shower room attached and a general storeroom, inclusive of all associated site works
Permission · Kildare County Council, 2360199
4 Sept 2023Conditional
3 No lighting pole standards with energy efficient LED lamp/flood lights no more than 12.5 metres high providing illumination to existing training pitches inclusive of all associated site works
Permission · Kildare County Council, 2360172
31 Aug 2023N/a
for 3 No lighting pole standards with energy efficient LED lamp / flood lights no more than 12.5 metres high providing illumination to existing training pitches inclusive of all associated site works
Permission · Kildare County Council, 2360159
25 Aug 2023N/a
for 3 No lighting pole standards with energy efficient LED lamp / flood lights no more than 12.5 metres high providing illumination to existing training pitches inclusive of all associated site works.
Permission · Kildare County Council, 2360141
18 Jul 2023Conditional
will consist of Demolition of existing Buildings No’s 7, 8 and 9 (total gfa c. 84,838sqm). - Existing Buildings No’s 1 – 6 will be retained for deep tech and innovation related uses (total gfa c.42,862sqm) - Construction of 2 no. new deep tech buildings and 4 no. new data centre buildings, all including ancillary office spaces. The deep tech buildings will have an overall maximum height of c.16m and vary in size from30,945sqm – 41,190sqm with a combined total gfa of c. 72,135 sqm. The data centres will be c.15 m in height to parapet and c.16.5m in height to top of roof plant screening. The data centres will vary in size from 13,225 sqm – 21,000 sqm with a combined total gfa of c. 76,225sqm. All buildings will be provided with Solar PV panels at roof level and green walls along selected elevations. - The new deep tech buildings (A1 & A2) will be provided with service yard areas, loading docks, car parking, access roads, security fencing/gates and landscaping. The deep tech buildings will include rainwater harvesting tanks and green roofs over office areas. - Each data centre (B1, C1, C2 & C3) will include data halls, admin blocks (comprising offices, breakroom, loading dock, storage, and ancillary areas) and a variety of mechanical and electrical plant areas/structures including battery storage rooms and mechanical rooms. Car parking, access roads, security fencing/gates, gate houses and landscaping will also be provided. - B1 will include 14 no. fuel oil generators, MV rooms and associated mechanical flues. C1 – C3 will each include 22 no. fuel oil generators, MV rooms and associated mechanical flues (each c.18.6m high). Car parking, access roads, security fencing/gates, gate houses and landscaping will also be provided. - 2 no. district heating pump house areas and inground piping for district heating system. - Construction of a Replacement 110kV Gas Insulated Switchgear (GIS) Substation adjacent to the existing 110kV Rinawade Substation. The current Air Insulated Switchgear (AIS) substation known as the Rinawade 110kV sub is fed by 2 x 110kV Overhead lines. The new substation will connect to these overhead lines via short runs of underground cable. The replacement 110kV substation will include 6 No. transformers, with client control building and a 2 storey GIS substation building within a 2.4m high fenced compound. - Decommissioning and removal of the existing 110kV Rinawade substation. - Construction of an on-site energy centre to provide to the nation
Permission · Kildare County Council, 2360047
22 Jun 2023Conditional
will consist of erection of Six 3m diameter x 10m high raw material storage silos in the open yard to the rear of Buildings, 2, 3 and 4. Two new fire exit doors (double doors) to Building 2 (South West Elevation). Retention of the erection of Two 3m diameter x 10m high raw material storage silos in the open yard to the rear of Buildings 2, 3 and 4
Permission · Kildare County Council, 23690
28 Apr 2023N/a
erection of six 3m diameter x 10m high raw material storage siles in the open yard to the rear of buildings 2, 3, and 4. Two new fire exit doors (double doors) to building 2 (south west elevation.) Retention of the erection of two 3m diameter x 10m high raw material storage silos in the open yard to the rear of buildings 2, 3, and 4.
Retention · Kildare County Council, 23450
6 Sept 2022Conditional
development of 4 No. 20 kV ESB double substations at four sites of c. 591 sqm in total (Site 1, c. 138 sqm adjacent to Building 4; Site 2, c. 138 sqm adjacent to Building 2 and Building 5; Site 3, c. 138 sqm adjacent to Building 5; and Site 4, c. 177 sqm partially within Building 9, at the Kildare Innovation Campus (formerly known as the Hewlett Packard Campus) Barnhall Road, Leixlip, Co. Kildare. The wider Kildare Innovation Campus is c. 80 hectares. The wider Campus is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and grounds associated with Castletown House to the west. The proposed development will consist of: the construction of 3 No. standalone ESB double substations and associated LV switch rooms (Substations No. 1-3) of c. 3m in height, c. 4.8m in depth, and c. 17.8m in width, with an individual gross floor area of 57.5 sqm; and all associated works above and below ground. Substation No. 4 (gross floor area of 57.5 sqm) will include: internal alterations to the existing Campus Building No. 9; associated LV switch rooms; the removal of existing louvre and replacement with substation access doors on the southeast elevation; access path; and all associated works above and below ground. The cumulative gross floor area of the development will be 230 sqm
Permission · Kildare County Council, 221096
26 May 2021Conditional
Development at a site of c. 0.516 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus). The proposed development will consist of the construction of a new vehicle access to the rugby club inclusive of associated pedestrian footpaths; modification to the rugby club’s existing vehicle access to replace it with a shared pedestrian and cycle access and the provision of a raised pedestrian/cycle crossing on Barnhall Road; the expansion of the existing car park for the rugby club to accommodate 38 No. surface car parking spaces as well as hard and soft landscaping and all ancillary works including boundary treatments, site excavation and development works above and below ground
Permission · Kildare County Council, 21730
10 May 2021Conditional
The proposed development which specifically relates to Building No. 4 located to the northeast of the centre of the site. The development for which retention permission is sought consists of the retention of the mezzanine area (121 sqm) on the first- floor level. This consists of office space, toilets, and a canteen. Retention permission is sought for any associated site works that would have occurred due to the construction of the mezzanine
Retention · Kildare County Council, 21623
5 Mar 2021N/a
Retention permission for development specifically relates to Building No.4, retention permission consists of the retention of the mezzanine area(121 sqm) on the first floor level. This consists of office space, toilets, and a canteen. Retention permission is sought for any associated site works that would have occurred due to the construction of the mezzanine.
Retention, 1 home · Kildare County Council, 21270
26 Jan 2021Conditional
the change of use of the existing and permitted (Reg. Ref:. 95/923) Ancillary Production Support Office associated with part of Building No. 2 to a standalone independent Office use including break room and tea station (c. 1,139sqm). The proposed development specifically relates to Building No. 2 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application.) The site is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At a site of c.80.56 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
Permission · Kildare County Council, 2179
19 Jan 2021Conditional
(a) Permission for 1 number new lighting standard providing illumination to the existing training pitches. (b) Retention Permission for 19 number existing lighting standards to the perimeter of the site to include for the relocation of 2 number existing lighting standards and the re-lamping of all fittings throughout with energy efficient LED lamps and all associated site works
Permission · Kildare County Council, 2147
7 Aug 2020Conditional
the construction of a logistics warehouse with ancillary office accommodation (total c. 25,268 sqm) to an overall height of 14.86 metres. The warehouse element of the development is principally single storey including an ancillary mezzanine level (554 sqm). The ancillary offices, comprising c. 1,737 sqm, are provided over three storeys and include toilets, change rooms, showers, cafeteria, gym, plant areas and circulation spaces. The proposed development will also include: the provision of a new vehicular access from Barnhall Road roundabout with ancillary associated entry/exit gates, access road and footpath; 179 no. surface car parking spaces including electric vehicle charging stations and 18 no. bicycle parking; solar pv panels on the warehouse roof; hard and soft landscaping; signage; sprinkler storage tanks and pump house; an electrical substation (c. 54 sqm); and all ancillary works including boundary treatments, street lighting, site excavation and development works above and below ground. The site is principally bounded by: Liffey Business Campus to the north; Barnhall Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At this site of c. 8.19 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
Permission · Kildare County Council, 20873
28 Jan 2020Conditional
The proposed development specifically relates to Building No. 3 and Building No. 4 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application). The development for which retention permission is sought consists of: the change of use of Building No. 3 from its permitted warehouse use (Reg. Ref. 95/923) to manufacturing use (4,421 sq. m gross floor area including ancillary offices at ground floor and first floor level); and the change of use of part of Building No. 4 from its permitted manufacturing use (Reg. Ref. 95/923) to office use (9,002 sq. m gross floor area ). The development for which retention permission is sought also consists of: the provision of ancillary office space at first floor level within Building No. 4 (246 sq. m gross floor area); and all other associated site development works above and below ground. The site is principally bounded by; Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west
Retention · Kildare County Council, 2060
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Registered freehold land, Tailte Éireann, CC BY 4.0. A parcel is the land of a title, not an address. The owner's name is in the Land Registry of Tailte Éireann: a copy of the folio can be ordered on landdirect.ie, for a fee.
- Land parcels
- 104
- median 626.5 m²
- Median price
- —
- 3 market sales since 2021, too few
- Zoning
- R2
- Existing Residential / Infill, 80 of 104 parcels
- Planning
- 15
- applications within 15 m of the street since 2010
Estimate About €607,000 for a second-hand house here at 2026 prices; one sale in two between €545,000 and €677,000. Refine the estimate
Land parcels
Registered freehold land, within 15 m of the street
104 parcels, from 38 m² to 328,293 m² (32.83 ha, 81.12 acres), median 626.5 m².
Line of the street: © OpenStreetMap contributors, ODbL.
Zoning
Development plan, within 15 m of the street
- R2Existing Residential / Infill (Existing residential)
Leixlip LAP 2020-2023, Kildare The zoning objective in the plan
80 parcels of this street - M3Neighbourhood Centre (District, neighbourhood centre)
Leixlip LAP 2020-2023, Kildare The zoning objective in the plan
6 parcels of this street - G4Open Space and Amenity (Active open space)
Leixlip LAP 2020-2023, Kildare The zoning objective in the plan
2 parcels of this street - S5Community and Education (Mixed/general community services/facilities uses)
Leixlip LAP 2020-2023, Kildare The zoning objective in the plan
1 parcel of this street - N4Transport & Utilities (Telecommunications)
Leixlip LAP 2020-2023, Kildare The zoning objective in the plan
1 parcel of this street - R1New Residential (New/proposed residential)
Leixlip LAP 2020-2023, Kildare The zoning objective in the plan
No parcel of this street has its centre in it - P1Agriculture
Leixlip LAP 2020-2023, Kildare The zoning objective in the plan
No parcel of this street has its centre in it
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0. A parcel counts in the zone its centre falls in.
Planning applications
Sites within 15 m of the street, newest first
17 Dec 2024Conditional
for the proposed extension of his existing house: 1) The removal of an existing shed in the rear garden to facilitate the construction of a new ground floor extension to the side and rear of the existing house; to accommodate; porch, living space, boot room, and dining, 2) New extension roof to accommodate rooflights, 3) Modification of existing main roof structure to include; new dormer window to the front, with rooflight and new dormer window to the rear (attic space not to be converted, to remain as dry storage space only), 4) Internal modifications and all associated site works
Permission · Kildare County Council, 2461353
3 Apr 2024Conditional
renovation, alterations, attic conversion, a replacement single-storey extension to the existing house, and all associated site work
Permission · Kildare County Council, 2460286
28 Mar 2024N/a
Development will consist of Renovation, alterations, attic conversion, a replacement single-storey extension to the existing house, and all associated site work at 22 Celbridge Rd., Leixlip, Co. Kildare.
Permission · Kildare County Council, 2460260
12 Feb 2024Conditional
for refurbishment of dwelling to include demolition of sheds and removal of chimney and porch, upgrade of existing walls, floors and roof with new insulation, single storey extension to the rear with roof lights and rearrangement of internal layout of dwelling with new draught porch and solar panels to roofs. Single story detached garage to the rear garden, removal of septic tank and new connection to public sewers and associated works
Permission · Kildare County Council, 2452
20 Dec 2023N/a
Refurbishment of dwelling to include demolition of sheds and removal of porch, chimney, upgrade of existing walls, floors and roof with with new insulation, single storey extension to the rear with roof lights and rearrangement of internal layout of dwelling with new draught porch and solar panels to roofs. Single storey detached garage to the rear garden, removal of septic tank and new connection to public sewers and associated works
Permission · Kildare County Council, 231053
18 Jul 2023Conditional
will consist of Demolition of existing Buildings No’s 7, 8 and 9 (total gfa c. 84,838sqm). - Existing Buildings No’s 1 – 6 will be retained for deep tech and innovation related uses (total gfa c.42,862sqm) - Construction of 2 no. new deep tech buildings and 4 no. new data centre buildings, all including ancillary office spaces. The deep tech buildings will have an overall maximum height of c.16m and vary in size from30,945sqm – 41,190sqm with a combined total gfa of c. 72,135 sqm. The data centres will be c.15 m in height to parapet and c.16.5m in height to top of roof plant screening. The data centres will vary in size from 13,225 sqm – 21,000 sqm with a combined total gfa of c. 76,225sqm. All buildings will be provided with Solar PV panels at roof level and green walls along selected elevations. - The new deep tech buildings (A1 & A2) will be provided with service yard areas, loading docks, car parking, access roads, security fencing/gates and landscaping. The deep tech buildings will include rainwater harvesting tanks and green roofs over office areas. - Each data centre (B1, C1, C2 & C3) will include data halls, admin blocks (comprising offices, breakroom, loading dock, storage, and ancillary areas) and a variety of mechanical and electrical plant areas/structures including battery storage rooms and mechanical rooms. Car parking, access roads, security fencing/gates, gate houses and landscaping will also be provided. - B1 will include 14 no. fuel oil generators, MV rooms and associated mechanical flues. C1 – C3 will each include 22 no. fuel oil generators, MV rooms and associated mechanical flues (each c.18.6m high). Car parking, access roads, security fencing/gates, gate houses and landscaping will also be provided. - 2 no. district heating pump house areas and inground piping for district heating system. - Construction of a Replacement 110kV Gas Insulated Switchgear (GIS) Substation adjacent to the existing 110kV Rinawade Substation. The current Air Insulated Switchgear (AIS) substation known as the Rinawade 110kV sub is fed by 2 x 110kV Overhead lines. The new substation will connect to these overhead lines via short runs of underground cable. The replacement 110kV substation will include 6 No. transformers, with client control building and a 2 storey GIS substation building within a 2.4m high fenced compound. - Decommissioning and removal of the existing 110kV Rinawade substation. - Construction of an on-site energy centre to provide to the nation
Permission · Kildare County Council, 2360047
12 May 2023Conditional
Large-Scale Residential Development (LRD) at a site of c. 14.3 hectares. The application site is principally bounded by: Celbridge Road (R404) and Back Gate Lodge, Celbridge, Leixlip, Co. Kildare W23E0F6 to the west; the existing residential developments of Leixlip Park and Wogansfield to the north; the M4 Motorway to the south; and by agricultural lands to the east. The development will consist of the: (1) Construction of 237 No. residential units ranging in height from two-three storeys comprising 30 no. two-bedroom houses (c.86.8sq.m each), 124 no. three-bedroom houses (ranging in area from c.103sq.m to 114sq.m each), 13 No. four-bedroom houses (ranging from c. 151sq.m to 168sq.m) , 20 No. one-bedroom apartments (ranging in area from c.56.6sq.m each), 22 No. two-bedroom duplex apartments (ranging in area from c. 86.9sq.m to 89.0sq.m) and 22 No. three-bedroom duplex apartments (ranging in area from c.127sq.m to 139sq.m each); (2) Construction of a two storey creche (c.278sq.m in area) with associated external play area (c.85.8sq.m. in area); (3) Provision of public open space (totalling c.7.71 ha of which c.5.61 ha comprises strategic amenity space), communal open space (serving the duplex apartments) (c. 570sq.m), and private open space (in the form of private garden areas serving the houses and terraces/balconies serving the apartments/duplexes); and (4) Provision of vehicular, cyclist and pedestrian access/egress and associated circulation routes (including the construction of a fourth arm to the existing three arm junction on the Celbridge Road (R404) opposite the entrance to the existing Barnhall Meadows residential development and pedestrian and cyclist access to the north-east of the site providing access to the existing residential development known as Leixlip Park). The development will also consist of: (5) 303 No. car parking spaces (including 31 No. car parking spaces for visitors and 12 No. car parking spaces serving the proposed créche): (6) Electric vehicle (EV) charging infrastructure; (7) 355 No. bicycle parking spaces (including 17 No. bicycle parking spaces serving the proposed créche and 160 No. bicycle parking spaces serving the proposed strategic amenity/public open space); (8) Bicycle storage; (9) Bin storage; (10) 3 No. ESB substations; (11) Undergrounding and diversion of the existing 20kV and 38kV overhead power lines; (12) Equipped play areas; (13) Photovoltaic roof panels; (14) Boundary treatments (including gates, piers, ra
Permission, 237 homes · Kildare County Council, 23513
26 Jan 2021Conditional
the change of use of the existing and permitted (Reg. Ref:. 95/923) Ancillary Production Support Office associated with part of Building No. 2 to a standalone independent Office use including break room and tea station (c. 1,139sqm). The proposed development specifically relates to Building No. 2 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application.) The site is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At a site of c.80.56 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)
Permission · Kildare County Council, 2179
20 Oct 2020Conditional
an existing extension (22.25sq.m) attached to side of bungalow and also planning permission for the demolition of an existing ground floor extension at rear (21 sq.m), removal of 2 no. chimney stacks, construction of new ground floor extension to rear (63sq.m), new roof and modifications to existing shed, new porch to front entrance (2 sq.m), new roof window over hall in front, widening of entrance drive gates and construction of new pedestrian gate in front boundary,
Retention · Kildare County Council, 201239
29 Sept 2020N/a
for an existing extension attached to side of bungalow and also planning permission for the demolition of an existing ground floor extension at rear, removal of 2 No. chimney stacks, construction of new ground floor extension to rear, new porch to front entrance, new roof window over hall in front, widening of entrance drive gates and construction of new pedestrian gate in front boundary
Retention · Kildare County Council, 201124
28 Jan 2020Conditional
The proposed development specifically relates to Building No. 3 and Building No. 4 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application). The development for which retention permission is sought consists of: the change of use of Building No. 3 from its permitted warehouse use (Reg. Ref. 95/923) to manufacturing use (4,421 sq. m gross floor area including ancillary offices at ground floor and first floor level); and the change of use of part of Building No. 4 from its permitted manufacturing use (Reg. Ref. 95/923) to office use (9,002 sq. m gross floor area ). The development for which retention permission is sought also consists of: the provision of ancillary office space at first floor level within Building No. 4 (246 sq. m gross floor area); and all other associated site development works above and below ground. The site is principally bounded by; Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west
Retention · Kildare County Council, 2060
15 Aug 2018N/a
The development will consist of creating two separate entrances for houses (No. 3 and No. 5 ) by extending separation wall between both houses out in – line with existing entrance walls. The two new entrances will require widening by moving existing piers outward and also lowering of the kerb in front of the entrances
Permission · Kildare County Council, 18995
16 Jan 2018Refused
change of use of existing retail unit to food takeaway and amendments to trademark signage to front of unit and external extract ductwork extending 4.5m to the rear of the site and associated ancillary works
Permission · Kildare County Council, 1845
5 Jan 2018Conditional
STRATEGIC HOUSING DEVELOPMENT (ABP Decision) consisting of 450 no. new residential units; a childcare facility (538sqm); a new roundabout on the Celbridge Road (R404) and associated road realignment to facilitate vehicular access to the application site with revised entrance arrangement to the Wonderful Barn Complex (a Protected Structure), and incorporating landscape features and signage to the Wonderful Barn Complex (a Protected Structure); associated internal roads, pedestrian and cycle paths and linkages; open space; and, all associated site and development works. The residential development consists of the following: 16 no. one-bed, two-storey, own door apartments, 54sqm and 56 sqm Gross Floor Area (GFA) each (Type 1B1 & 1B2); 42 no. two-bed apartments, 83.7sqm GFA each (Type 2B1), with 42 no. three bed duplex units above, ranging in size from 119.2 to 120.4sqm GFA (Type 3B1 & 3B2), in three-storey terraces; 48 no. two-bed, two-storey terraced houses, 86.6sqm each (Type F1 & F2); 187 no. three-bed, two-storey terraced, semi-detached and detached houses, ranging in size from 110.7sqm to 126.4sqm GFA (Types D1-7, E1-5 & H1-4); 2 no. three-bed, single storey, detached houses, 113.7sqm each (Type J); 97 no. four-bed, two-storey, semi-detached and detached houses ranging in size from 130.2sqm to 206sqm (Types A, B1, B4, C1, C2 & G1-3); 16 no. four-bed, three-storey semi-detached houses ranging in size from 216.5sqm to 219.7sqm (Types C3 & C4). A total of 929 no. car parking spaces, including 875 no. spaces serving the residential units and 54 no. visitor spaces dispersed throughout the scheme (of which 13 no. spaces are designated for use by the childcare facility), are proposed. The associated site and infrastructural works include foul and surface water drainage, attenuation areas, open space, landscaping buffer with the Wonderful Barn parkland, boundary walls and fences, internal roads, cycle paths and footpaths including linkages towards the Wonderful Barn Complex (a Protected Structure) and to established residential areas to the north of the site. An Environmental Impact Assessment Report has been prepared in respect of the proposed development.
Permission, 349 homes · Kildare County Council, 18300606
15 Dec 2017N/a
change of use of existing retail unit to food takeaway and amendments to trademark signage to front of unit and ancillary works
Permission · Kildare County Council, 171432
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Every recorded sale
13 sales, newest first
| Date | Address, as recorded | Price |
|---|---|---|
| 31 Jul 2026 | 7 CELBRIDGE RD, LEIXLIP, KILDARE W23F890 | €615,000 |
| 26 Nov 2025 | 33 CELBRIDGE RD, LEIXLIP, CO KILDARE W23A8D5 | €687,500 |
| 8 Apr 2025 | 29 CELBRIDGE RD, LEIXLIP, KILDARE W23P110 | €425,000 |
| 24 Sept 2024 | 25 CELBRIDGE RD, LEIXLIP, KILDARE W23C854 (not full market price) | €262,500 |
| 22 Dec 2022 | 127A CELBRIDGE RD, LEIXLIP, KILDARE (not full market price) | €24,000 |
| 12 Feb 2020 | 33 CELBRIDGE RD, LEIXLIP, CO KILDARE | €347,000 |
| 15 Feb 2019 | 68 CELBRIDGE RD, LEIXLIP, KILDARE | €480,000 |
| 22 Dec 2016 | 78 CELBRIDGE RD, LEIXLIP, KILDARE | €380,000 |
| 7 Oct 2016 | 19 CELBRIDGE RD, LEIXLIP, KILDARE | €312,500 |
| 15 May 2015 | 29 Celbridge Road, Leixlip | €225,000 |
| 15 Apr 2014 | 16 CELBRIDGE RD, LEIXLIP, KILDARE | €299,950 |
| 12 Dec 2013 | 3 CELBRIDGE RD, LEIXLIP | €373,000 |
| 14 Nov 2012 | 5 Celbridge Road, Leixlip (new, excl. VAT) | €340,000 |
Source: Residential Property Price Register, Property Services Regulatory Authority. Sales marked “not full market price” are left out of every median.