The Walk, Baker Hall
Co. Meath: the land, its zoning and planning, and every recorded sale since 2010
Parcel 164614
- Area
- 43,166 m² (4.32 ha, 10.67 acres)
- Buildings
- 121 buildings touch it, 8,769 m² on the ground
- Zoning
- R2 A1 - Existing Residential (Meath County Development Plan 2021-2027) The objective
G1 F1 - Open Space (Meath County Development Plan 2021-2027) The objective
R1 A2 - New Residential (Meath County Development Plan 2021-2027) The objective - Townland
- Limekilnhill
Planning applications on this parcel
29 Aug 2025Conditional
the development will consist of change of use of existing dwelling to 11 guest ensuite bedrooms for ancillary accommodation to Ma Dwyer’s Guest Accommodation to include modifications to elevations and revised internal plan layout. The development also includes: (a) Blocking up existing entrance to dwelling, (b) new mono-pitch plant room / store to rear, (c) provision of 17 no. car parking spaces at rear with entrance via existing entrance /exit to “Ma Dwyer’s” . (d) Replace existing front boundary with stone wall to match “Ma Dwyer’s” (e) Form new emergency entrance on the east side of “Ma Dwyer’s “ with a designated route to the rear of the development (f) Upgrade existing mains services on site. (g) Construct retaining wall to side and rear of site to include landscaping together with all associated site works. Significant Further Information/Revised Plans submitted on this application
Permission · Meath County Council, 2560924
22 Aug 2025N/a
the development will consist of change of use of existing dwelling to 11 guest ensuite bedrooms for ancillary accommodation to Ma Dwyer’s Guest Accommodation to include modifications to elevations and revised internal plan layout. The development also includes: (a) Blocking up existing entrance to dwelling, (b) new mono-pitch plant room / store to rear, (c) provision of 17 no. car parking spaces at rear with entrance via existing entrance /exit to “Ma Dwyer’s”. (d) Replace existing front boundary with stone wall to match “Ma Dwyer’s”. (e) Form new emergency entrance on the east side of “Ma Dwyer’s “ with a designated route to the rear of the development. (f) Upgrade existing mains services on site. (g) Construct retaining wall to side and rear of site to include landscaping together with all associated site works
Permission · Meath County Council, 2560891
22 Apr 2025Conditional
EXTENSION OF DURATION OF PLANNING PERMISSION ABP Ref: 306021-19. (SHD) The construction of a residential development of 544 no. dwellings, 2 no. creches & open space areas as follows: A) 260 no. houses comprising; 18 no. 2 bed houses, 207 no. 3 bed houses, 35 no. 4 bed houses B) 198 no. apartments in 5 no. buildings (Block A - 5 storeys with a 6 storey setback, Block B – 6 storeys, Block C – 5 storeys, fronting onto Academy Street, Block D – 3 and 4 storeys & Block E – 4 storeys) comprising 46 no. 1 bed apartments & 152 no. 2 bed apartments; C) 15 no. 2 bed duplex apartments & 15 no. 3 bed duplex apartments in 3 no. 3 storey buildings; D) 8 no. 5 dwelling 3 storey corner blocks (each comprising, 1 no. 1 bed apartment, 2 no. 2 bed apartment & 2 no. 3 bed units) – 40 no. units in total; E) 2 no. 8 dwelling 3 storey corner blocks (each comprising 4 no. 1 bedroom and 4 no. 2 bedroom units) – 16 no. units in total; F) Provision of 2 no. creches, ESB kiosks, associated single storey bicycle storage & refuse storage buildings; G) Provision of open space within the development (including playground areas & communal open space areas); H) Access from 3 no. new junctions onto Academy Street, & a new pedestrian access onto the Dublin Road (R147) at the southern end of the site, includes new signalised junction & improvements on the Dublin Road (R147), also 875 no. car parking spaces and 581 no. cycle spaces (northern vehicular access to also facilitate future adjoining school site campus). Proposed works to the former access road to Belmount House (a protected structure) as well as landscaping works to associated woodland area; I) Surface water & underground attenuation systems. J) Temporary marketing signage for a period of 3 years (located on Academy Street); K) All associated site development & landscape works all on a site of c. 15.1 hectares; Also contains a statement setting out how the proposal is consistent with the the relevant development plans (Meath County Development Plan 2013-2019 & Navan Development Plan 2009-2015) & a statement indicating why permission should be granted for the proposed development, having regard to section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An EIAR and NIS have been prepared in respect of the proposed development.
Extension of duration, 1 home · Meath County Council, 2571
6 Dec 2023Conditional
the proposed development comprises:1. Modifications to a Strategic Housing Development (Large-Scale Residential Development) permitted under An Bord Pleanála (ABP) Ref. ABP-306021-19, as previously amended by Meath County Council (MCC) Refs. 221258 and 221309 (known as Baker Hall). The proposed modifications include the replacement of 17 no. permitted dwellings (1 no. 1 bed unit, 8 no. 2 bed units and 8 no. 3 bed units) contained in Duplex Block 1 and Corner Block CB5F, with 9 no. units consisting of 5 no. 2 bed sheltered housing bungalow units (Type H2) and 4 no. two storey townhouse units (2 no. 2 bed units – Type E and 2 no. 3 bed units – Type F), together with all associated and ancillary site and development works including landscaping, boundary treatments, bin storage, public lighting, internal footpaths, car parking and bicycle parking. The proposed dwellings integrate with the roads, drainage, water supply and services infrastructure of the permitted Strategic Housing Development (Large-Scale Residential Development). 2. The demolition and clearance of Belmont Lodge (249.5 sqm), a vacant two storey detached house with a single storey garage, to facilitate the construction of 7 no. two storey, 3 bed houses (House Types C, F and F5) and public open spaces, together with all associated and ancillary site and development works including car parking, landscaping, boundary treatments, pedestrian footpaths, public lighting, drainage and water supply infrastructure. Vehicular access to the 7 no. houses is provided by an internal road that connects to the permitted internal road network of the Strategic Housing Development. In total, the proposed development will provide 16 no. dwellings. The proposed development also includes the conversion of an existing vehicular access from the Dublin Road (via the Belmount House Entrance Gates, a protected structure - RPS No. 90939) to a pedestrian and cycle only access, with a historic access avenue to be reinstated as a pedestrian path between the Dublin Road and the permitted Strategic Housing Development. Works to the protected structure (Belmount House Entrance Gates) include the careful removal of vegetation, localised repairs to masonry and metalwork associated with the gates and railings, and the repainting of the gates and railings. Significant further information/revised plans submitted on this application
Permission, 16 homes · Meath County Council, 2360450
27 Nov 2019Conditional
"DIRECT APPLICATION TO AN BORD PLEANALA - SUBMISSION TO AN BORD PLEANALA".the construction of a residential development of 544 no. dwellings, 2 no. creches & open space areas as follows: A) 260 no. houses comprising; 18 no. 2 bed houses, 207 no. 3 bed houses, 35 no. 4 bed houses B) 198 no. apartments in 5 no. buildings (Block A - 5 storeys with a 6 storey setback, Block B – 6 storeys, Block C – 5 storeys, fronting onto Academy Street, Block D – 3 and 4 storeys & Block E – 4 storeys) comprising 46 no. 1 bed apartments & 152 no. 2 bed apartments; C) 15 no. 2 bed duplex apartments & 15 no. 3 bed duplex apartments in 3 no. 3 storey buildings; D) 8 no. 5 dwelling 3 storey corner blocks (each comprising, 1 no. 1 bed apartment, 2 no. 2 bed apartment & 2 no. 3 bed units) – 40 no. units in total; E) 2 no. 8 dwelling 3 storey corner blocks (each comprising 4 no. 1 bedroom and 4 no. 2 bedroom units) – 16 no. units in total; F) Provision of 2 no. creches, ESB kiosks, associated single storey bicycle storage & refuse storage buildings; G) Provision of open space within the development (including playground areas & communal open space areas); H) Access from 3 no. new junctions onto Academy Street, & a new pedestrian access onto the Dublin Road (R147) at the southern end of the site, includes new signalised junction & improvements on the Dublin Road (R147), also 875 no. car parking spaces and 581 no. cycle spaces (northern vehicular access to also facilitate future adjoining school site campus). Proposed works to the former access road to Belmount House (a protected structure) as well as landscaping works to associated woodland area; I) Surface water & underground attenuation systems. J) Temporary marketing signage for a period of 3 years (located on Academy Street); K) All associated site development & landscape works all on a site of c. 15.1 hectares; Also contains a statement setting out how the proposal is consistent with the the relevant development plans (Meath County Development Plan 2013-2019 & Navan Development Plan 2009-2015) & a statement indicating why permission should be granted for the proposed development, having regard to section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An EIAR and NIS have been prepared in respect of the proposed development.
Permission, 275 homes · Meath County Council, SH306021
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Registered freehold land, Tailte Éireann, CC BY 4.0. A parcel is the land of a title, not an address. The owner's name is in the Land Registry of Tailte Éireann: a copy of the folio can be ordered on landdirect.ie, for a fee.
- Land parcels
- 3
- median 15,626 m²
- Median price
- €334,804
- 18 market sales since 2021
- Zoning
- R1
- A2 - New Residential, 2 of 3 parcels
- Planning
- 2
- applications within 15 m of the street since 2010
Estimate About €424,000 for a second-hand house here at 2026 prices; one sale in two between €324,000 and €580,000. Refine the estimate
Land parcels
Registered freehold land, within 15 m of the street
3 parcels, from 7,605 m² (0.76 ha, 1.88 acres) to 43,166 m² (4.32 ha, 10.67 acres), median 15,626 m².
Line of the street: © OpenStreetMap contributors, ODbL.
Zoning
Development plan, within 15 m of the street
- R1A2 - New Residential (New/proposed residential)
Meath County Development Plan 2021-2027, Meath The zoning objective in the plan
2 parcels of this street - R2A1 - Existing Residential (Existing residential)
Meath County Development Plan 2021-2027, Meath The zoning objective in the plan
1 parcel of this street
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0. A parcel counts in the zone its centre falls in.
Planning applications
Sites within 15 m of the street, newest first
22 Apr 2025Conditional
EXTENSION OF DURATION OF PLANNING PERMISSION ABP Ref: 306021-19. (SHD) The construction of a residential development of 544 no. dwellings, 2 no. creches & open space areas as follows: A) 260 no. houses comprising; 18 no. 2 bed houses, 207 no. 3 bed houses, 35 no. 4 bed houses B) 198 no. apartments in 5 no. buildings (Block A - 5 storeys with a 6 storey setback, Block B – 6 storeys, Block C – 5 storeys, fronting onto Academy Street, Block D – 3 and 4 storeys & Block E – 4 storeys) comprising 46 no. 1 bed apartments & 152 no. 2 bed apartments; C) 15 no. 2 bed duplex apartments & 15 no. 3 bed duplex apartments in 3 no. 3 storey buildings; D) 8 no. 5 dwelling 3 storey corner blocks (each comprising, 1 no. 1 bed apartment, 2 no. 2 bed apartment & 2 no. 3 bed units) – 40 no. units in total; E) 2 no. 8 dwelling 3 storey corner blocks (each comprising 4 no. 1 bedroom and 4 no. 2 bedroom units) – 16 no. units in total; F) Provision of 2 no. creches, ESB kiosks, associated single storey bicycle storage & refuse storage buildings; G) Provision of open space within the development (including playground areas & communal open space areas); H) Access from 3 no. new junctions onto Academy Street, & a new pedestrian access onto the Dublin Road (R147) at the southern end of the site, includes new signalised junction & improvements on the Dublin Road (R147), also 875 no. car parking spaces and 581 no. cycle spaces (northern vehicular access to also facilitate future adjoining school site campus). Proposed works to the former access road to Belmount House (a protected structure) as well as landscaping works to associated woodland area; I) Surface water & underground attenuation systems. J) Temporary marketing signage for a period of 3 years (located on Academy Street); K) All associated site development & landscape works all on a site of c. 15.1 hectares; Also contains a statement setting out how the proposal is consistent with the the relevant development plans (Meath County Development Plan 2013-2019 & Navan Development Plan 2009-2015) & a statement indicating why permission should be granted for the proposed development, having regard to section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An EIAR and NIS have been prepared in respect of the proposed development.
Extension of duration, 1 home · Meath County Council, 2571
27 Nov 2019Conditional
"DIRECT APPLICATION TO AN BORD PLEANALA - SUBMISSION TO AN BORD PLEANALA".the construction of a residential development of 544 no. dwellings, 2 no. creches & open space areas as follows: A) 260 no. houses comprising; 18 no. 2 bed houses, 207 no. 3 bed houses, 35 no. 4 bed houses B) 198 no. apartments in 5 no. buildings (Block A - 5 storeys with a 6 storey setback, Block B – 6 storeys, Block C – 5 storeys, fronting onto Academy Street, Block D – 3 and 4 storeys & Block E – 4 storeys) comprising 46 no. 1 bed apartments & 152 no. 2 bed apartments; C) 15 no. 2 bed duplex apartments & 15 no. 3 bed duplex apartments in 3 no. 3 storey buildings; D) 8 no. 5 dwelling 3 storey corner blocks (each comprising, 1 no. 1 bed apartment, 2 no. 2 bed apartment & 2 no. 3 bed units) – 40 no. units in total; E) 2 no. 8 dwelling 3 storey corner blocks (each comprising 4 no. 1 bedroom and 4 no. 2 bedroom units) – 16 no. units in total; F) Provision of 2 no. creches, ESB kiosks, associated single storey bicycle storage & refuse storage buildings; G) Provision of open space within the development (including playground areas & communal open space areas); H) Access from 3 no. new junctions onto Academy Street, & a new pedestrian access onto the Dublin Road (R147) at the southern end of the site, includes new signalised junction & improvements on the Dublin Road (R147), also 875 no. car parking spaces and 581 no. cycle spaces (northern vehicular access to also facilitate future adjoining school site campus). Proposed works to the former access road to Belmount House (a protected structure) as well as landscaping works to associated woodland area; I) Surface water & underground attenuation systems. J) Temporary marketing signage for a period of 3 years (located on Academy Street); K) All associated site development & landscape works all on a site of c. 15.1 hectares; Also contains a statement setting out how the proposal is consistent with the the relevant development plans (Meath County Development Plan 2013-2019 & Navan Development Plan 2009-2015) & a statement indicating why permission should be granted for the proposed development, having regard to section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An EIAR and NIS have been prepared in respect of the proposed development.
Permission, 275 homes · Meath County Council, SH306021
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Median price by year
Years with three market sales or more
| Year | Median price | Sales |
|---|---|---|
| 2023 | €334,804 | 18 |
Every recorded sale
18 sales, newest first
| Date | Address, as recorded | Price |
|---|---|---|
| 6 Dec 2023 | 20 The Walk, Baker Hall, Navan (new, excl. VAT) | €324,375 |
| 14 Nov 2023 | 21 THE WALK, BAKER HALL, NAVAN C15E20D (new, excl. VAT) | €325,991 |
| 10 Nov 2023 | 9 The Walk, Baker Hall, Navan (new, excl. VAT) | €374,449 |
| 2 Nov 2023 | 11 THE WALK, BAKER HALL, NAVAN (new, excl. VAT) | €344,801 |
| 27 Oct 2023 | 14 the walk, baker hall, navan (new, excl. VAT) | €339,207 |
| 25 Oct 2023 | 22 The Walk, Baker Hall, Navan (new, excl. VAT) | €330,396 |
| 24 Oct 2023 | 7 The Walk, Baker Hall, Navan (new, excl. VAT) | €361,233 |
| 20 Oct 2023 | 3 The Walk, Baker Hall, Navan (new, excl. VAT) | €339,207 |
| 20 Oct 2023 | 23 The Walk, Baker Hall, Navan (new, excl. VAT) | €330,400 |
| 20 Oct 2023 | 12 The Walk, Baker Hall, Navan (new, excl. VAT) | €330,397 |
| 18 Oct 2023 | 8 The Walk, Baker Hall, Navan (new, excl. VAT) | €348,018 |
| 17 Oct 2023 | 1 The Walk, Baker Hall, Navan (new, excl. VAT) | €396,475 |
| 16 Oct 2023 | 2 The Walk, Baker Hall, Navan (new, excl. VAT) | €330,396 |
| 13 Oct 2023 | 4 The Walk, Baker Hall, Navan (new, excl. VAT) | €361,233 |
| 13 Oct 2023 | 10 The Walk, Baker Hall, Navan (new, excl. VAT) | €339,207 |
| 10 Oct 2023 | 18 The Walk, Baker Hall, Navan (new, excl. VAT) | €330,396 |
| 6 Oct 2023 | 19 The Walk, Baker Hall, Navan (new, excl. VAT) | €325,991 |
| 29 Sept 2023 | 17 The Walk, Baker Hall, Navan (new, excl. VAT) | €330,396 |
Source: Residential Property Price Register, Property Services Regulatory Authority. Sales marked “not full market price” are left out of every median.