Church Rd, Clara
Co. Offaly: the land, its zoning and planning, and every recorded sale since 2010
Parcel 293149
- Area
- 97,922 m² (9.79 ha, 24.2 acres)
- Buildings
- No building touches it.
- Zoning
- R1 New Residential (Offaly County Development Plan 2021-2027) The objective
S5 Community Services/Facilities (Offaly County Development Plan 2021-2027) The objective - Townland
- Raheen
Planning applications on this parcel
29 Apr 2026N/a
(RED 111) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Permission · Offaly County Council, 2660230
23 Apr 2026N/a
(RED III) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Permission · Offaly County Council, 2660212
4 Mar 2026N/a
RED III - for development at this site in the townlands of Lehinch, Kilcoursey, Kilbride, Aghamore, Raheen and Clara, near Clara, Co. Offaly. The development will consist of a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Permission · Offaly County Council, 2660105
22 Dec 2025N/a
a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: •The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of and overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). • The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application
Permission · Offaly County Council, 2560680
18 Jun 2025Conditional
DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK/ETS, PERCOLATION AREA AND ASSOCIATED SITE WORKS
Permission, 1 home · Offaly County Council, 2564
2 May 2025Conditional
THE ERECTION OF A NEW SINGLE STOREY DWELLING, CONNECTION TO A NEW EFFLUENT WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, THE ERECTION OF A NEW DOMESTIC GARAGE AND ALL ANCILLARY SITE WORKS
Permission, 1 home · Offaly County Council, 2546
23 Dec 2024Refused
Construction of a four bedroom 2 storey dwelling and garage. The application will also include a new biofilter treatment system and percolation area, new entrance and all associated site works and drainage
Permission, 1 home · Offaly County Council, 2560001
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Registered freehold land, Tailte Éireann, CC BY 4.0. A parcel is the land of a title, not an address. The owner's name is in the Land Registry of Tailte Éireann: a copy of the folio can be ordered on landdirect.ie, for a fee.
- Land parcels
- 50
- median 1,163.5 m²
- Median price
- —
- 4 market sales since 2021, too few
- Zoning
- R2
- Existing Residential, 1 of 50 parcels
- Planning
- 3
- applications within 15 m of the street since 2010
Estimate About €115,000 for a second-hand house here at 2026 prices; one sale in two between €101,000 and €131,000. Refine the estimate
Land parcels
Registered freehold land, within 15 m of the street
50 parcels, from 168 m² to 97,922 m² (9.79 ha, 24.2 acres), median 1,163.5 m².
Line of the street: © OpenStreetMap contributors, ODbL.
Zoning
Development plan, within 15 m of the street
- R2Existing Residential (Existing residential)
Offaly County Development Plan 2021-2027, Offaly The zoning objective in the plan
1 parcel of this street - S5Community Services/Facilities (Mixed/general community services/facilities uses)
Offaly County Development Plan 2021-2027, Offaly The zoning objective in the plan
1 parcel of this street - R1New Residential (New/proposed residential)
Offaly County Development Plan 2021-2027, Offaly The zoning objective in the plan
1 parcel of this street - G5Open Space, Amenity and Recreation (Mixed/general 'green'/recreation/conservation, other)
Offaly County Development Plan 2021-2027, Offaly The zoning objective in the plan
No parcel of this street has its centre in it
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0. A parcel counts in the zone its centre falls in.
Planning applications
Sites within 15 m of the street, newest first
9 Apr 2025Conditional
the demolition of existing shed and existing extension to the rear of existing dwelling. Planning permission is also sought for construction of new single story extension to the side and rear of existing dwelling together with all associated site works Located at at church Road, Clara, Co. Offaly.
Permission, 1 home · Offaly County Council, 2560118
26 Apr 2024Conditional
Reconstruction and extension to house, relocation of vehicular entrance gate and construction of domestic garage and all associated site services and works
Permission, 1 home · Offaly County Council, 2460147
25 Apr 2017Conditional
THE CONSTRUCTION OF A SINGLE STOREY DWELLING AND DETACHED GARAGE WITH ASSOCIATED SITE WORKS REQUIRED FOR OWN OCCUPATION
Permission, 1 home · Offaly County Council, 17139
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Every recorded sale
6 sales, newest first
| Date | Address, as recorded | Price |
|---|---|---|
| 19 Mar 2025 | CHURCH ROAD, CLARA, CO OFFALY R35V972 | €105,000 |
| 10 Jan 2025 | CHURCH RD, CLARA, OFFALY (not full market price) | €70,000 |
| 13 Dec 2024 | CHURCH RD, CLARA, OFFALY R35NA72 | €100,000 |
| 8 Aug 2023 | CHURCH ROAD, CLARA, CO OFFALY R35V972 | €80,000 |
| 3 Sept 2021 | CHURCH RD, CLARA, OFFALY | €290,000 |
| 7 Feb 2020 | CHURCH RD, CLARA, CO OFFALY | €230,000 |
Source: Residential Property Price Register, Property Services Regulatory Authority. Sales marked “not full market price” are left out of every median.