Illaunbaun
Townland in the civil parish of Kilfarboy, barony of Ibrickan, Co. Clare; in Irish An tOileán Bán
- Area
- 169.3 ha
- 418 acres
- Land parcels
- 31
- registered freehold, median 13,690 m² (1.37 ha, 3.38 acres)
- Zoning
- —
- not in a zoned settlement
- Planning
- 4
- applications since 2010
Land parcels
Registered freehold land, Tailte Éireann
31 registered freehold parcels lie mostly in Illaunbaun, from 122 m² to 347,992 m² (34.8 ha, 85.99 acres). The dashed line is the townland's boundary; 34 neighbouring parcels touch it.
Download the townland: DXF, in Irish Transverse Mercator metres, with its boundary, parcels and buildings; GeoJSON or KML.
Zoning
Development plans, national zoning
No zone of a development plan covers Illaunbaun in the national zoning. Outside zoned towns and villages, the county development plan's rural policies apply to each application.
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0.
Planning applications
Sites that touch the townland, newest first
31 Mar 2026Refused
for the development of the Slievenalicka wind turbine in the townlands of Tooreen, Slievenalicka, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • One peat repository area for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the planning application and will be submitted to the Planning Authority with the application
Permission · Clare County Council, 2660207
19 Sept 2025Refused
for the development at this site in the townlands of Slievenalicka, Illaunbaun, Drumbaun and Lackamore (although no infrastructure will be sited within Lackamore townland), Co. Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundation, crane pad hardstand and assembly area. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbine to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction and operation of the turbine. • Two borrow pits. • One peat repository area for peat and spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent and Temporary tree felling to accommodate the construction and operation of the turbine. • Signages. • All associated site development works. This application is seeking a 10-year planning permission, together with a 35-year operational life for the wind turbine from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes. The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) and Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the Planning Authority with the application
Permission · Clare County Council, 2560578
27 Aug 2025Refused
for the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.
Permission · Clare County Council, 2560520
17 Oct 2017Conditional
to build a machinery shed and yard
Permission · Clare County Council, 17796
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Nature and heritage
Designated sites and recorded monuments
Designated sites
No designated site (Special Area of Conservation, Special Protection Area, Natural Heritage Area or proposed one) touches the townland of Illaunbaun.
Recorded monuments
No recorded monument lies in the townland of Illaunbaun.
Architectural heritage
No building of the National Inventory of Architectural Heritage stands in the townland of Illaunbaun.
Designated sites: National Parks and Wildlife Service. Recorded monuments: Sites and Monuments Record, National Monuments Service. Buildings: National Inventory of Architectural Heritage. Department of Housing, Local Government and Heritage, CC BY 4.0. Works at or in relation to a recorded monument need two months' written notice to the National Monuments Service (National Monuments (Amendment) Act 1994, section 12).
Ground and risks
Radon, landslides, flooding
- Radon
- About 1 in 5 homes in this area is likely to have high radon levels. Testing a home
- Landslides
- Susceptibility moderately high, moderately low, low, low (inferred), on the 1:50,000 map; parts are water.
- Terrain model
- No LiDAR survey of the Office of Public Works covers the centre of the townland of Illaunbaun.
- Flooding
- The flood maps of the Office of Public Works: floodinfo.ie.
Radon Risk Map of Ireland, Environmental Protection Agency; Landslide Susceptibility Classification, Geological Survey Ireland; both CC BY 4.0. LiDAR: contains Irish Public Sector Data (Geological Survey Ireland & the Office of Public Works) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.
Homes sold
Property Price Register
No address of the register names Illaunbaun with five sales or more. The sales of the area are on the page of Co. Clare.
The townland
- Name
- Illaunbaun · An tOileán Bán
- Area
- 1,693,396 m² (169.34 ha, 418.45 acres)
- Civil parish
- Kilfarboy, and its townlands
- Barony
- Ibrickan
- Electoral division
- Moy, the unit of the census
- Census 2022
- Moy electoral division: 765 people in 302 households; 84% of households own their home; 31% of homes were built since 2001; 7% of dwellings stood vacant on census night, and 35% were holiday homes.
- Neighbouring townlands
- Clooneyogan South, Drumbaun, Fahanlunaghta Beg, Fahanlunaghtamore, Lackamore, Mooghna, Slievenalicka, Tooreen
- Placenames
- Illaunbaun on logainm.ie, the Placenames Database of Ireland
Townlands, civil parishes, baronies and electoral divisions, National Statutory Boundaries, Tailte Éireann, CC BY 4.0. Census 2022, Small Area Population Statistics by electoral division, Central Statistics Office, CC BY 4.0. A townland is the smallest land division of Ireland, and the unit of a rural address; old registers such as the 1901 and 1911 censuses file it under its civil parish and barony.