Abbeytown, Crossmolina
Co. Mayo: the land, its zoning and planning, and every recorded sale since 2010
- Land parcels
- 49
- median 196 m²
- Median price
- €147,000
- 5 market sales since 2021
- Zoning
- M4
- Self-Sustaining Consolidation Zoning, 49 of 49 parcels
- Planning
- 1
- applications within 15 m of the street since 2010
Estimate About €176,000 for a second-hand house here at 2026 prices; one sale in two between €154,000 and €201,000. Refine the estimate
Land parcels
Registered freehold land, within 15 m of the street
49 parcels, from 78 m² to 49,160 m² (4.92 ha, 12.15 acres), median 196 m².
Line of the street: © OpenStreetMap contributors, ODbL.
Zoning
Development plan, within 15 m of the street
- M4Self-Sustaining Consolidation Zoning (Built up area)
Mayo County Development Plan 2022-2028, Mayo The zoning objective in the plan
49 parcels of this street
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0. A parcel counts in the zone its centre falls in.
Planning applications
Sites within 15 m of the street, newest first
30 Jun 2026N/a
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Mayo is 5.87 Hectares (Ha). The proposed development within Co. County Mayo comprises both temporary and permanent works located in the townlands Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 6 No. locations • Temporary modification to street furniture (traffic lights, bench, junction boxes, wall and part of a bridge parapet/railing) at 1No. location • Temporary removal of street lighting, bollard and tree removal at 1No. location. • Temporary removal of a wall and gate, berm regarding, hedge trimming and temporary modification to street furniture at 1No location. • Temporary removal of wall and vegetation as well as temporary modifications to street furniture at 1No. location • Temporary entrance to be constructed at 3 No. locations • Construction of a dual-purpose permanent access and public amenity track of approx. 2.7km at Crossmolina, Co. Mayo • Construction of permanent bridge crossing of the River Deel at Crossmolina, Co. Mayo • Installation of permanent lighting along the access and amenity track at Crossmolina, Co. Mayo • Installation of permanent sustainable drainage system along the access and amenity track at Crossmolina, Co. Mayo • Installation of temporary construction compound to include site offices, welfare facilities and car parking at Crossmolina Co. Mayo. • Reinstatement of all temporary works areas to previous condition • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications wil
Permission · Mayo County Council, 2660511
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Median price by year
Years with three market sales or more
| Year | Median price | Sales |
|---|---|---|
| 2025 | €155,000 | 3 |
Every recorded sale
15 sales, newest first
| Date | Address, as recorded | Price |
|---|---|---|
| 28 Oct 2025 | 49 ABBEYTOWN, CROSSMOLINA, MAYO F26X012 | €205,000 |
| 24 Jul 2025 | 50 ABBEYTOWN, CROSSMOLINA, MAYO F26NW80 | €155,000 |
| 24 Mar 2025 | 1 ABBEYTOWN, CROSSMOLINA, MAYO F26TK65 | €45,000 |
| 18 Jul 2023 | 15 ABBEYTOWN, CROSSMOLINA, CO. MAYO F26D253 | €147,000 |
| 27 Aug 2021 | 45 ABBEYTOWN, CROSSMOLINA, MAYO F26YH77 | €118,000 |
| 28 Jun 2021 | 36 ABBEYTOWN, CROSSMOLINA, MAYO F26XA49 (not full market price) | €24,520 |
| 13 Aug 2020 | 21 ABBEYTOWN, CROSSMOLINA, MAYO | €95,000 |
| 21 Feb 2020 | 17 ABBEYTOWN, CROSSMOLINA, MAYO | €80,000 |
| 11 Dec 2018 | 18 ABBEYTOWN, CROSSMOLINA, MAYO | €67,000 |
| 28 Sept 2017 | 55 ABBEYTOWN, CROSSMOLINA, MAYO | €70,000 |
| 4 May 2016 | 11 ABBEYTOWN, CROSSMOLINA, CO MAYO | €45,000 |
| 19 Dec 2013 | 56 ABBEYTOWN, CROSSMOLINA, MAYO | €78,000 |
| 17 Dec 2013 | 10 ABBEYTOWN, CROSSMOLINA, MAYO (not full market price) | €13,691 |
| 19 Dec 2012 | 44 Abbeytown, Crossmolina | €47,000 |
| 25 Nov 2011 | 41 ABBEYTOWN, CROSSMOLINA | €97,500 |
Source: Residential Property Price Register, Property Services Regulatory Authority. Sales marked “not full market price” are left out of every median.