Kilcumber
Townland in the civil parish of Clonsast, barony of Coolestown, Co. Offaly; in Irish Coill Chomair
- Area
- 113.5 ha
- 281 acres
- Land parcels
- 16
- registered freehold, median 4,762 m² (0.48 ha, 1.18 acres)
- Zoning
- —
- not in a zoned settlement
- Planning
- 15
- applications since 2010
Land parcels
Registered freehold land, Tailte Éireann
16 registered freehold parcels lie mostly in Kilcumber, from 347 m² to 330,175 m² (33.02 ha, 81.59 acres). The dashed line is the townland's boundary; 13 neighbouring parcels touch it.
Download the townland: DXF, in Irish Transverse Mercator metres, with its boundary, parcels and buildings; GeoJSON or KML.
Zoning
Development plans, national zoning
No zone of a development plan covers Kilcumber in the national zoning. Outside zoned towns and villages, the county development plan's rural policies apply to each application.
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0.
Planning applications
Sites that touch the townland, newest first
20 Mar 2026Conditional
(RED III) a period of 10 years for a grid connection for the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598). This will consist of installation of medium voltage (MV) electrical cabling between the solar arrays and the existing Philipstown 110kV substation, including a 8m section of cable within the R401 and a 56m section of overhead line and associated pole sets to facilitate crossing of the Figile River. A Natura Impact Statement (NIS) has been submitted as part of the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)
Permission · Offaly County Council, 2660152
18 Dec 2025Conditional
New site entrance arrangements, replacing the previously consented access points 3 and 4 approved under Planning Reference 21/598, together with associated internal access tracks, drainage systems and all related works
Permission · Offaly County Council, 2560654
27 Nov 2025N/a
Permission for development at this site within the townlands of Ballykilleen, Ballinowlart North and Kilcumber, Co. Offaly. The development will consist of: 1. A grid connection for the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598). This will consist of medium voltage (MV) electrical cabling between the solar arrays and the existing Philipstown 110kV substation, including a 8m section of cable within the R401 and a 56m section of overhead line and associated pole sets to facilitate crossing of the Figile River. 2. Amendments to the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598) comprising revised site entrance arrangements in place of permitted access points 3 and 4 including associated internal access tracks, drainage and development boundary amendments.
Permission · Offaly County Council, 2560603
25 Jun 2025Conditional
The development will consist of: A. A single storey extension to an existing single storey dwelling, B. A proposed new onsite effluent treatment system and percolation area, C. Upgrade of an existing agricultural vehicular entrance to residential use and closure of the existing residential entrance D. All other associated site development work
Permission, 1 home · Offaly County Council, 2560264
24 Mar 2025Conditional
for works associated with the proposed uprate of the existing 110 kV Overhead Line (OHL) between the existing Cushaling 110 kV substation in the townland of Ballykilleen, Co. Offaly and the existing Portlaoise 110 kV substation in the townlands of Clonminam and Kylekiproe, Co. Laois. The Cushaling – Portlaoise 110 kV OHL is approximately 41.6 km long and comprises 17 no. steel lattice tower structures and 193 no. wooden pole structures. The existing circuit is located across the functional areas of Offaly County Council (OCC), Kildare County Council (KCC) and Laois County Council (LCC). Approximately 10 km of the existing OHL circuit is located within the functional area of OCC, approximately 9 km is within the functional area of KCC and approximately 22.6 km is located within the functional area of LCC. Separate planning applications are being lodged with each respective County Council. The Proposed Development across the functional area of Co. Kildare is located in the townlands of Coolelan, Kiltaghan North, Kiltaghan South, Clonmoyle West, Ummeras More, Mountrice, Mullaghroe Upper, Mullaghroe Lower, Coolatogher, Coolsickin or Quinsborough and Coolnafearagh. The Proposed Development works across the functional area of Co. Kildare will comprise: 1. The replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor including installation of a new fibre communication connection; 2. The replacement of 2 no. steel towers and their foundations; 3. The replacement of steel members at 1 no. tower; 4. Full tower painting required at 1 no. location; 5. Shear block remedial works (raise and cap) at 1 no. tower location; 6. The replacement of wooden poles only at 8 no. locations; 7. The replacement of wooden poles and crossarm at 3 no. locations; 8. The replacement of crossarm only at 4 no. locations; 9. The replacement of existing danger notices at various locations, as required; 10. The replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware and anti-climbing guards at various locations, as required; 11. The replacement of suspension clamps, vibration dampers and compression assemblies at all locations, as required; 12. All associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts/piers and removal and reinstatement of existing fencing; and 13. Other temporary associated
Permission · Kildare County Council, 2560302
24 Mar 2025Conditional
EirGrid plc, with the consent and approval of the Electricity Supply Board (ESB) is applying to Offaly County Council for permission for works associated with the proposed uprate of the existing 110 kV Overhead Line (OHL) between the existing Cushaling 110 kV substation in the townland of Ballykilleen, Co. Offaly and the existing Portlaoise 110 kV substation in the townlands of Clonminam and Kylekiproe, Co. Laois. The Proposed Development works across the functional area of Co.Offaly will comprise: Replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor including installation of a new fibre communication connection; replacement of the existing earthwire with new earthwire between structures 1 and 8; replacement of steel members at 3 no. towers; Full tower painting required at 3 no. locations; replacement of wooden poles only at 7 no. locations; replacement of wooden poles and crossarm at 2 no. locations; replacement of crossarm only at 3 no. locations; replacement of existing danger notices at various locations, as required; replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware and anti-climbing guards at various locations, as required; replacement of suspension clamps, vibration dampers & compression assemblies at all locations, as required; All associated temporary site development works to gain access to the existing structures & other temporary associated & ancillary development works required for the purpose of the uprate of the existing circuit. No additional structures are proposed along the existing circuit. Structure 203 will be relocated approx. 101m back towards structure 202 due to its existing position on top of a gravel mound & the potential for subsidence of gravel in the long term. No alteration to the nature, extent, alignment, character or voltage of existing electricity infrastructure is proposed. A Natura Impact Statement (NIS) has been submitted with this application. Full description of all works within Site Notice.
Permission · Offaly County Council, 2560087
23 Sept 2022Conditional
THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (D) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (E) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION
Permission · Offaly County Council, 22494
12 Aug 2022N/a
(A) CONSTRUCTION OF A 1.5KM, 5M WIDE, UNPAVED, ACCESS ROAD FROM THE R401 INTO THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/19/606 AND ABP 306924-20), (B) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (C) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (D) RELOCATION OF THE PERMITTED CUSHALING WIND FARM SUBSTATION 25 METERS SOUTHWEST. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION
Permission · Offaly County Council, 22407
30 Sept 2021Conditional
A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV DEVELOPMENT WITH A TOTAL SITE AREA OF CIRCA 117.47 HECTARES, TO INCLUDE PV PANELS MOUNTED ON METAL FRAMES, NEW ACCESS TRACKS, UNDERGROUND CABLING, PERIMETER FENCING WITH CCTV CAMERAS, 22 NO. MV POWER STATIONS, TEMPORARY CONSTRUCTION COMPOUNDS AND ALL ANCILLARY GRID INFRASTRUCTURE AND ASSOCIATED WORKS. THE SOLAR FARM WOULD BE OPERATIONAL FOR 40 YEARS
Permission · Offaly County Council, 21598
10 May 2021Conditional
DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYSTEMS, UTILITIES, PROCESSING SYSTEMS AND ANCILLARY STRUCTURES AS PART OF THE PROPOSED DEVELOPMENT. THERE WILL BE NO CHANGE TO EXISTING INFRASTRUCTURE PRESENT ON-SITE. SITE ACCESS AND EGRESS WILL USE THE EXISTING PERMITTED SITE ENTRANCES TO THE R401 PUBLIC ROAD. THERE WILL BE NO CHANGE TO THE PERMITTED BOUNDARY OF THE FACILITY. EDENDERRY POWER PLANT IS LICENCED BY THE ENVIRONMENTAL PROTECTION AGENCY UNDER AN INDUSTRIAL EMISSIONS (IE) LICENCE [REF. P0482-04]. ACTIVITIES AT THE FACILITY AND ASSOCIATED ENVIRONMENTAL ASPECTS AND EMISSIONS WILL CONTINUE TO BE REGULATED AND CONTROLLED BY THE EPA. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR). THE PLANNING APPLICATION IS ALSO ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)
Permission · Offaly County Council, 21291
19 Dec 2019Refused
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 (EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION
Permission · Offaly County Council, 19606
28 Nov 2019Refused
A 10-year planning permission with a 30-year operational life for development on a site area of 3.23 hectares in the townland of Ticknevin, Carbury, Co. Kildare. The development will consist of up to 1 (one) wind turbine with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, 20 metres of new wind farm road, and all associated underground electrical and communications cabling. This single turbine application forms part of a larger wind farm development located within County Offaly and Kildare with a separate planning application being submitted to Offaly County Council concurrently. The overall development will consist of up to 9 turbines (8 in Offaly and 1 in Kildare) with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, approximately 4,750 metres of new internal access roads, associated drainage and turning areas; upgrade of approximately 3,500 metres of the existing L50062 public road including upgrade of the existing bridge; a new bridge crossing of the Figile River to provide access between Turbine 3 and Turbine 4; a 2,950-metre recreation trail and all associated development to include gravel pathways, a footbridge across the Figile River, a parking area, signage, information boards and outdoor fitness equipment; an off-site electrical substation and a battery energy storage facility; all associated underground electrical and communications cabling to connect the turbines to the substation including approximately 1,550 metres along the R401 Regional Road, a spoil storage area; a permanent meteorological mast up to 110.5 metres high; 2 No. temporary construction compounds; 2 No. temporary blade adapter set-down areas within the wind farm site and at the junction of the R402 and R401 at Rathmore, Edenderry, Co. Offaly; turbine delivery route works including widening of the junction of the R420 and R402 at Ballina, Geashill, Co. Offaly and all associated site development works. This application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement,
Permission · Kildare County Council, 191323
28 Nov 2019N/a
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 ( EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION
Permission · Offaly County Council, 19568
8 Nov 2019N/a
A 10-year planning permission with a 30-year operational life for development on a total site area of approximately 63.9 hectares in the townlands of Ballykilleen, Shean, Kilcumber, Cloncant, Cushaling and Rathmore, Edenderry, Ballina, Geashill, Co. Offaly and Ticknevin, Carbury, Co. Kildare. The development will consist of up to 9 No. wind turbines (8 in Co. Offaly, 1 in Co. Kildare), with a tip height of up to 187 metres, and all associated foundations and hardstanding areas; approximately 4,750 metres of new internal access roads associated drainage and turning areas; upgrade of approximately 3,500 metres of the existing L50062 public road including upgrade of the existing bridge; a new bridge crossing of the Figile River to provide access between Turbine 3 and Turbine 4; a 2,950 metre recreation trail and all associated development to include gravel pathways, a footbridge across the Figile River, a parking area, signage, information boards and outdoor fitness equipment; and off-site electrical substation and a battery energy storage facility; all associated underground electrical and communications cabling to connect the turbines to the substation including approximately 1,550m along the R401 Regional Road; a spoil storage area; a permanent meteorological mast up to 110.5 metres high; 2 No. temporary construction compounds; 2 No. temporary blade adapter set-down areas, turbine delivery route works and all associated site development works. An Environmental Impact Assessment Report and a Natura Impact Statement has been prepared in respect of the application.
Permission · Kildare County Council, 191255
8 Nov 2019N/a
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A TOTAL SITE AREA OF 63.9 HECTARES . THE DEVELOPMENT WILL CONSIST OF UP TO 9 NO. WIND TURBINES (8 IN CO. OFFALY, 1 IN CO. KILDARE), WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO TEMPORARY BLADE ADAPTER SET-DOWN AREAS, TURBINE DELIVERY ROUTE WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATION
Permission · Offaly County Council, 19524
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Nature and heritage
Designated sites and recorded monuments
Designated sites
No designated site (Special Area of Conservation, Special Protection Area, Natural Heritage Area or proposed one) touches the townland of Kilcumber.
Recorded monuments
No recorded monument lies in the townland of Kilcumber.
Architectural heritage
No building of the National Inventory of Architectural Heritage stands in the townland of Kilcumber.
Designated sites: National Parks and Wildlife Service. Recorded monuments: Sites and Monuments Record, National Monuments Service. Buildings: National Inventory of Architectural Heritage. Department of Housing, Local Government and Heritage, CC BY 4.0. Works at or in relation to a recorded monument need two months' written notice to the National Monuments Service (National Monuments (Amendment) Act 1994, section 12).
Ground and risks
Radon, landslides, flooding
- Radon
- About 1 in 20 homes in this area is likely to have high radon levels. Testing a home
- Landslides
- Susceptibility low, on the 1:50,000 map.
- Terrain model
- No LiDAR survey of the Office of Public Works covers the centre of the townland of Kilcumber.
- Flooding
- The flood maps of the Office of Public Works: floodinfo.ie.
Radon Risk Map of Ireland, Environmental Protection Agency; Landslide Susceptibility Classification, Geological Survey Ireland; both CC BY 4.0. LiDAR: contains Irish Public Sector Data (Geological Survey Ireland & the Office of Public Works) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.
Homes sold
Property Price Register
No address of the register names Kilcumber with five sales or more. The sales of the area are on the page of Co. Offaly.
The townland
- Name
- Kilcumber · Coill Chomair
- Area
- 1,135,305 m² (113.53 ha, 280.54 acres)
- Civil parish
- Clonsast, and its townlands
- Barony
- Coolestown
- Electoral division
- Edenderry Rural, the unit of the census
- Census 2022
- Edenderry Rural electoral division: 890 people in 288 households; 94% of households own their home; 26% of homes were built since 2001; 6% of dwellings stood vacant on census night, and 0% were holiday homes.
- Neighbouring townlands
- Ballinowlart North, Ballykilleen, Cloncant, Cushaling, Shean
- Placenames
- Kilcumber on logainm.ie, the Placenames Database of Ireland
Townlands, civil parishes, baronies and electoral divisions, National Statutory Boundaries, Tailte Éireann, CC BY 4.0. Census 2022, Small Area Population Statistics by electoral division, Central Statistics Office, CC BY 4.0. A townland is the smallest land division of Ireland, and the unit of a rural address; old registers such as the 1901 and 1911 censuses file it under its civil parish and barony.