Tullagreen
Townland in the civil parish of Carrigtohill, barony of Barrymore, Co. Cork; in Irish Tulach Ghréine
Parcel 2225437
- Area
- 106,405 m² (10.64 ha, 26.29 acres)
- Buildings
- 11 buildings touch it, 19,312 m² on the ground
- Zoning
- C2.2 Industry (Cork County Development Plan 2022) The objective
R3 Existing Residential/Mixed Residential and Other Uses (Cork County Development Plan 2022) The objective - Townland
- Tullagreen
Planning applications on this parcel
24 Jul 2026Awaiting recommendation
GE Healthcare Ireland Limited intends to apply to the Planning Authority mentioned above for permission for a development consisting of the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 400.2 kWp DC and 345 kVA AC, located within the GE Healthcare campus at IDA Business Park, Terry’s Land and Tullagreen Townlands, Carrigtwohill, Co. Cork, T45 AV60. The proposed development will comprise 920 photovoltaic modules, each rated at 435 Wp, covering an approximate area of 2,315 square metres, within a total application site area of approximately 0.37 hectares, installed on a fixed East West mounting structure with a height of approximately 0.8 metres at the lower edge and 1.38 metres at the upper edge. The development will also include underground direct current and alternating current cabling, string inverters, galvanised steel support structures, earthing infrastructure and associated electrical works. The system will connect directly to the existing on site switchgear, with no requirement for a transformer cabin. All works will take place within the GE Healthcare landholding. The development will include minor civil works, trenching and reinstatement and all associated site and environmental works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The Natura Impact Statement (NIS) will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant Planning Authority. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Permission · Cork County Council, 26/1972
8 Apr 2026Invalid - case closed
The development consisting of the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 400.2 kWp DC and 345 kVA AC, located within the GE Healthcare campus at IDA Business Park, Carrigtwohill, Co. Cork, T45 AV60. The proposed development will comprise 920 photovoltaic modules, each rated at 435 Wp, covering an approximate area of 2,315 square metres, within a total application site area of approximately 0.37 hectares, installed on a fixed East West mounting structure with a height of approximately 0.8 metres at the lower edge and 1.38 metres at the upper edge. The development will also include underground direct current and alternating current cabling, string inverters, galvanised steel support structures, earthing infrastructure and associated electrical works. The system will connect directly to the existing on site switchgear, with no requirement for a transformer cabin. All works will take place within the GE Healthcare landholding. The development will include minor civil works, trenching and reinstatement and all associated site and environmental works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application described above. This development is covered by the provisions of the Renewable Energy Directive III Directive EU 2023/2413, and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000 as amended. When a notice issues in accordance with section 34D b, the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Permission · Cork County Council, 26/0873
19 Jun 2025Conditional permission
Permission for upgrade works to two existing controlled pedestrian crossings at the IDA Business and Technology Park. The works include installing raised crossing points, new section of footpath, line marking, traffic poles with lights and tactile paving. We also intend to install a new raised uncontrolled crossing at the roundabout at the rear of the IDA Business and Technology Park. These works include upgrade works to the existing footpath, installation of a raised crossing point, new sections of footpath, tactile paving and line marking.
Permission · Cork County Council, 25/5189
4 Dec 2023Conditional
Permission for construction of 3No. general industry units; The provision of an ESB sub-station, 3No. bicycle shelters, associated site signage (1 main entrance sign & 3No. totem signs), 3 no. waste storage areas, truck hardstanding, HGV parking areas, car-parking and all other ancillary and associated site development works including landscaping; all at Anngrove Carrigtwohill, Co. Cork.
Permission · Cork County Council, 23/6416
1 Dec 2023Conditional
Permission for the extension and expansion of their existing facility and all ancillary site development works. The proposed development provides for the construction of a new extension to the existing GE Healthcare building (approximate maximum height of 27 metres) comprising a new filling line, solution preparation and utilities building. The proposed development also includes : i) The demolition of an existing single storey entrance security building, upgrade and reconfiguration of existing site entrance to the north, construction of a new relocated single storey entrance security building, ii) The demolition of existing waste bins structure, gas storage building, and an existing contractors compound, inclusive of workshop, prefabs and other ancillary structures, iii) The establishment of a utilities yard to include a pump house, chemical store, waste storage building, fuel tank, fire water retention tanks, gas storage, liquid nitrogen tank (LN2), mains water tank (MW Tank), rainwater harvesting treatment hut (RWH Tank) rainwater harvesting tank (RWH Tank), pipe racks to the proposed new filling line, solution preparation and utilities building and all ancillary plant and services infrastructure, iv) All other ancillary site development works which includes signage, tree removal and compensatory planting, bicycle shelter, provision of a new gated pedestrian/cycle entrance to the south onto Cork Road (L-3678) and rooftop PV solar panels, site drainage and landscaping works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Permission · Cork County Council, 23/6412
13 Nov 2023Incompleted application
Permission for construction of 3No. General industry units; The provision of an ESB sub-station, 3No. bicycle shelters, associated site signage (4No. totem signs), 3No. waste storage areas, truck hardstanding, HGV parking areas, 165No. car-parking spaces and all other ancillary and associated site development works including landscaping; all at Terrysland Carrigtwohill, Co. Cork.
Permission · Cork County Council, 23/6265
29 Sept 2023Conditional
The development consists of site enabling works to facilitate future expansion of their facility and all ancillary site development works. The proposed development comprises modifications to the internal site layout including: (i) The decommissioning of existing surface car parking spaces to the northwest of the site and their relocation to the south and east of the site. Decommissioned car parking areas to be finished with temporary graded gravel. (ii) All ancillary site development works including the relocation of existing smoking and bicycle parking shelters, removal of existing container structure, tree removal, compensatory planting, site drainage and landscaping works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Permission · Cork County Council, 23/5968
7 Apr 2022Withdrawn
Permission for the following (1) the construction of a new site entrance (2) the construction/ installation of approximately 470m new 2.4m high green palisade security fencing / gate (3) the demolition / demounting of approximately 170m of existing mesh fencing and (4) all associated site works including footpath, lighting and CCTV at IDA business Park
Permission · Cork County Council, 22/4781
27 Apr 2020Conditional
For use of a single storey classroom, permitted as a temporary building under planning registration no. 17/6292, on a permanent basis.
Permission · Cork County Council, 20/4848
24 Feb 2020Incompleted application
Permission for use of a single storey classroom, permitted as a temporary building under planning registration no. 17/6292, on a permanent basis.
Permission · Cork County Council, 20/4370
5 Sept 2019Conditional
(1) To relocate the existing single storey gas bottle store (2) To relocate the existing single storey waste compactor enclosure and (3) All associated site development works .
Permission · Cork County Council, 19/6192
23 Aug 2019Conditional
(1) To construct a new single storey extension of total area 750sqm to the western side of the existing main building containing a new high-speed Filling Line to replace the existing filling line on the current site for final product filling, (2) modifications to existing car parking area to suit proposed extension. (3) all associated site development works.
Permission · Cork County Council, 19/6052
22 Jul 2019Conditional
Internal road upgrades. The proposed development will involve the upgrade of existing internal access roads to provide a dedicated shared use cycleway and footpath, pedestrian and cycle crossing point, bus lane, bus shelter and traffic safety barrier. The proposed development will also include for the provision of a cycleway and footpath adjacent to the L-3616 public road to connect into the L-3615 at the north eastern corner of the IDA Business Park
Permission · Cork County Council, 19/5836
7 Sept 2018Conditional
Retention and completion of dwelling and all associated site works.
Retention · Cork County Council, 18/6379
21 Jun 2018Conditional
Construction of flood management scheme consisting of flood defence embankments, an overflow culvert, an attenuation pond, headwalls and outfalls, electrical cabinet and other ancillary works. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Permission · Cork County Council, 18/5609
28 May 2018Incompleted application
The Construction of flood management scheme consisting of flood defence embankments, an overflow culvert, an attenuation pond, headwalls and outfalls and other ancillary works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Permission · Cork County Council, 18/5370
4 Sept 2017Conditional
The construction of a single-storey temporary classroom and all associated site works.
Permission · Cork County Council, 17/6292
4 Aug 2017Incompleted application
Construction of a single storey temporary classroom and all associated site works.
Permission · Cork County Council, 17/6046
28 Jun 2017Incompleted application
The construction of a single storey temporary classroom and all associated site works.
Permission · Cork County Council, 17/5630
26 Aug 2016Conditional
Erect a single storey childcare facility with a 2 storey administration block, a separate playhouse building, all associated site development works including entrance from the IDA estate roadway, on-site parking, signage, boundaries and landscaping.
Permission · Cork County Council, 16/6155
1 Jul 2016Incompleted application
To erect a single storey childcare facility with a 2 storey administration block, a separate playhouse building, all associated site development works including entrance from the IDA estate roadway, on-site car parking, signage, boundaries, and landscaping.
Permission · Cork County Council, 16/5638
23 Nov 2015Conditional
Construction of an extension to existing light industrial building together with associated site works
Permission · Cork County Council, 15/6639
5 Nov 2015Conditional
(1) Construction of a new innovation extension building on two floors of total area 1277 square metres to the eastern side of the existing main building, with a new link corridor to existing ground floor, and a new escape staircase. The new innovation centre shall also include a canteen/kitchen area, changing/locker rooms and conference room to ground floor, and an open plan office with cellular offices to first floor. The new building will also incorporate a roof top plant room of total area 53 square metres in addition to solar panels. (2) Demolition of the existing canteen and link corridor, portacabin and utilities store. (3) Modifications to existing access road to suit proposed extension. (4) All associated site development works
Permission · Cork County Council, 15/6486
16 Oct 2015Incompleted application
(1) Construction of a new innovation extension building on two floors of total area 1277sq.m to the eastern side of the existing main building, with a new link corridor to existing ground floor, and a new escape staircase. The new innovation centre is to also include a canteen/kitchen area, changing/locker rooms and conference room to ground floor, and as an open plan office with cellular offices to first floor. The new building will also incorporate a roof top plant room of total area 53sq.m in addition to solar panels. (2) The demolition of the existing canteen and link corridor, portacabin and utilities store. (3) Modifications to existing access road to suit proposed extension. (4) all associated site development works.
Permission · Cork County Council, 15/6327
20 Jan 2015Conditional
Two-storey manufacturing and assembly building, including production and administration areas, a new site entrance and access road, car parking and external storage and gas compound areas, together with all associated site works
Permission · Cork County Council, 15/4093
The 25 most recent of 49 applications.
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Designated sites
No designated site (Special Area of Conservation, Special Protection Area, Natural Heritage Area or proposed one) touches this parcel.
Recorded monuments around it
No zone of notification of a recorded monument touches this parcel.
Architectural heritage
No building of the National Inventory of Architectural Heritage stands on this parcel.
Designated sites: National Parks and Wildlife Service. Recorded monuments: Sites and Monuments Record, National Monuments Service. Buildings: National Inventory of Architectural Heritage. Department of Housing, Local Government and Heritage, CC BY 4.0. Works at or in relation to a recorded monument need two months' written notice to the National Monuments Service (National Monuments (Amendment) Act 1994, section 12).
Ground and risks
- Radon
- About 1 in 10 homes in this area is likely to have high radon levels. Testing a home
- Landslides
- Susceptibility moderately low, low, low (inferred), on the 1:50,000 map.
- Terrain model
- No LiDAR survey of the Office of Public Works covers the centre of this parcel.
- Flooding
- The flood maps of the Office of Public Works: floodinfo.ie.
Radon Risk Map of Ireland, Environmental Protection Agency; Landslide Susceptibility Classification, Geological Survey Ireland; both CC BY 4.0. LiDAR: contains Irish Public Sector Data (Geological Survey Ireland & the Office of Public Works) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.
Download this parcel: DXF, in Irish Transverse Mercator metres, with its neighbours and buildings, for a drawing program; GeoJSON, in WGS 84, for a map; KML, for Google Earth.
Registered freehold land, Tailte Éireann, CC BY 4.0. A parcel is the land of a title, not an address. The owner's name is in the Land Registry of Tailte Éireann: a copy of the folio can be ordered on landdirect.ie, for a fee.
- Area
- 49.5 ha
- 122 acres
- Land parcels
- 3
- registered freehold, median 1,362 m²
- Zoning
- C2.2
- Industry
- Planning
- 100
- applications since 2010
Land parcels
Registered freehold land, Tailte Éireann
3 registered freehold parcels lie mostly in Tullagreen, from 737 m² to 3,643 m² (0.36 ha, 0.9 acres). The dashed line is the townland's boundary; 15 neighbouring parcels touch it.
Download the townland: DXF, in Irish Transverse Mercator metres, with its boundary, parcels and buildings; GeoJSON or KML.
Zoning
Development plans, national zoning
- C2.2Industry (General industry)
Cork County Development Plan 2022, Cork · 5 parcels The zoning objective in the plan - C2.1Business and General Employment (Industrial, enterprise, employment)
Cork County Development Plan 2022, Cork · 3 parcels The zoning objective in the plan - C6Existing Mixed/General Business/Industrial Uses (Mixed/general commercial/industrial/enterprise uses)
Cork County Development Plan 2022, Cork · 2 parcels The zoning objective in the plan
Source: Tailte Éireann and the Department of Housing (MyPlan), national zoning, CC BY 4.0.
Planning applications
Sites that touch the townland, newest first
24 Jul 2026Awaiting recommendation
GE Healthcare Ireland Limited intends to apply to the Planning Authority mentioned above for permission for a development consisting of the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 400.2 kWp DC and 345 kVA AC, located within the GE Healthcare campus at IDA Business Park, Terry’s Land and Tullagreen Townlands, Carrigtwohill, Co. Cork, T45 AV60. The proposed development will comprise 920 photovoltaic modules, each rated at 435 Wp, covering an approximate area of 2,315 square metres, within a total application site area of approximately 0.37 hectares, installed on a fixed East West mounting structure with a height of approximately 0.8 metres at the lower edge and 1.38 metres at the upper edge. The development will also include underground direct current and alternating current cabling, string inverters, galvanised steel support structures, earthing infrastructure and associated electrical works. The system will connect directly to the existing on site switchgear, with no requirement for a transformer cabin. All works will take place within the GE Healthcare landholding. The development will include minor civil works, trenching and reinstatement and all associated site and environmental works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The Natura Impact Statement (NIS) will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant Planning Authority. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Permission · Cork County Council, 26/1972
8 Apr 2026Invalid - case closed
The development consisting of the installation of a ground mounted solar photovoltaic plant with an approximate capacity of 400.2 kWp DC and 345 kVA AC, located within the GE Healthcare campus at IDA Business Park, Carrigtwohill, Co. Cork, T45 AV60. The proposed development will comprise 920 photovoltaic modules, each rated at 435 Wp, covering an approximate area of 2,315 square metres, within a total application site area of approximately 0.37 hectares, installed on a fixed East West mounting structure with a height of approximately 0.8 metres at the lower edge and 1.38 metres at the upper edge. The development will also include underground direct current and alternating current cabling, string inverters, galvanised steel support structures, earthing infrastructure and associated electrical works. The system will connect directly to the existing on site switchgear, with no requirement for a transformer cabin. All works will take place within the GE Healthcare landholding. The development will include minor civil works, trenching and reinstatement and all associated site and environmental works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority in connection with the application described above. This development is covered by the provisions of the Renewable Energy Directive III Directive EU 2023/2413, and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000 as amended. When a notice issues in accordance with section 34D b, the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Permission · Cork County Council, 26/0873
18 Dec 2025Grant with conditions
Permission for the construction of a single storey utilities building, 1 no. buffer tank, a 2m high retaining wall to the north, south and west of the proposed development and associated site works at the existing facility. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions licence that is regulated by the Environmental Protection Agency (EPA). Under the proposed development the site will remain in compliance with all the regulatory requirements under existing licence condition.
Permission · Cork County Council, 25/6871
24 Nov 2025Invalid - prepare letters
Permission for the construction of a new single storey utilities building and associated site works at the existing facility at Tullagreen, Carrigtwohill, Co. Cork, T45KD29. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions licence that is regulated by the Environmental Protection Agency (EPA). Under the proposed development the site will remain in compliance with all the regulatory requirements under existing licence condition.
Permission · Cork County Council, 25/6570
26 Sept 2025F.i. consultees/awaiting recommendation
Permission for the construction of a business park comprising of 6 no. warehouse/light industrial buildings each with ancillary office accommodation and associated yard space. As part of the development, buildings no. 3, 4, 5 and 6 are each to be subdivided into 2 no. warehouse/light industrial units providing a total of 10 no. individual units across the site. The development also includes a new ESB substation, along with 5 no. sprinkler tanks, 5 no. pump houses and 10 no. waste storage areas. Permission is also sought to upgrade an existing vehicular (agricultural) entrance to the site from the L-3004-0 public road, along with the provision of internal roads, footpaths, cycle lanes, parking, landscaping, public lighting, site signage, infrastructure and services including roof-top solar panel arrays to serve each unit, and all associated site development works. The development includes the provision of new/upgraded infrastructure along or adjacent to the L-3004-0 public road, including the upgrade of the existing junction between the L-3004-0 and the L-3605-0 public roads to a staggered cross-road junction, the provision of a signalised pedestrian crossing from the L-3004-906 (Bury’s Bridge to Carrigtwohill pedestrian/cycle route) across the L-3004-0 public road, road markings, public lighting, service infrastructure and all ancillary development. A Natura Impact Statement will be submitted to the planning authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority.
Permission · Cork County Council, 25/6047
20 May 2025Conditional permission
Permission for the construction of an electrical compound and associated site development works. The proposed electrical compound will include an ESB control building, Merck customer building, 2 no. 38kV transformers and all ancillary bunds, equipment, access roads, lighting and fencing. The proposed development is for a new build on an existing manufacturing establishment site to which the Major Accident Directive applies. The Natura Impact Statement will be submitted to the Planning Authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority. The establishment holds an Industrial Emissions Licence that is regulated by the Environmental Protection Agency (EPA). Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.
Permission · Cork County Council, 25/4938
24 Mar 2025Conditional permission
Alterations to the extension and expansion of their existing facility permitted by Cork County Council planning references 23/5968 and 23/6412 and all ancillary site development works. The proposed development includes alterations to planning reference 23/5968 comprising the omission of a permitted detention basin and replacement with Stormcell attenuation system. The proposed development also includes alterations to planning reference 23/6412 comprising: (i) The construction of a revised extension to the existing GE Healthcare building comprising a filling line, solution preparation and utilities building with an approximate maximum height of 13 metres (reduction from approximate maximum height of 27 metres). (ii) The reduction in area and reconfiguration of the permitted utilities yard/contractors compound to include a utilities building, electrical building, pump house, waste compactor building, nitrogen tank, mains water tank, piperacks to the proposed new filling line and solution preparation building and all ancillary plant and service infrastructure. The works provide for the maintenance of the existing project cabin and workshop buildings on site, with partial demolition of the workshop building. (iii) The relocation west of the existing vehicular site entrance from the north and associated realignment of the internal service road within the site. (iv) All other ancillary site development and enabling works which include rooftop PV panels, signage, revised servicing and drainage proposals, landscaping works and establishment of a temporary construction compound (area to be reinstated post construction phase) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
Permission · Cork County Council, 25/4506
17 Jan 2025Conditional
Permission for the extension and expansion of the existing stryker innovation centre and all ancillary site development work. The proposed development provides for the construction of a four-storey extension to the rear of the existing innovation centre. The proposed development includes the relocation and extension of an existing surface car park to southern areas of the site, the provision of a multi-shelter structure accommodating bicycle parking and smoking area, rooftop PV solar panels, signage, storage yard and waste compound/recycling building, and a pedestrian/cycle connection to the existing greenway to the south of the site. The proposed development also includes minor elevational and internal alterations to the existing innovation centre building. A Natura impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Permission · Cork County Council, 25/4040
8 Jan 2025Conditional
Permission for alterations and revisions to the previously approved planning reference number 22/4839. The proposed changes include a reduction in the size of the T7 building and an expansion of the pump house footprint (total 5.6m2 increase in total floor area). Modifications to the permanent bridge are also proposed, involving adjustments to its external materials and dimensions. Site-wide landscaping updates are planned, along with the installation of high-level signage on the IC4 production building. Minor adjustments to the type, size and placement of doors and windows are proposed for the IC4 production building, central utility building, drum store and foam deluge building. The application also includes the relocation of the southeast gate and detailing of the cycle route. Finally, alterations to plant, machinery, and tanks to the IC4 production building, yard area and fire water tank areas are part of this proposal. The proposed development is located on an existing manufacturing site which the Major Accidents Directive applies. The site is also subject to both an Industrial Emissions License and an Integrated Pollution Control License, regulated by the environmental Protection Agency (EPA). A Natura Impact Statement and Appropriate Assessment Screening Report is submitted to the Planning Authority with this Application.
Permission · Cork County Council, 25/4007
1 Dec 2023Conditional
Permission for the extension and expansion of their existing facility and all ancillary site development works. The proposed development provides for the construction of a new extension to the existing GE Healthcare building (approximate maximum height of 27 metres) comprising a new filling line, solution preparation and utilities building. The proposed development also includes : i) The demolition of an existing single storey entrance security building, upgrade and reconfiguration of existing site entrance to the north, construction of a new relocated single storey entrance security building, ii) The demolition of existing waste bins structure, gas storage building, and an existing contractors compound, inclusive of workshop, prefabs and other ancillary structures, iii) The establishment of a utilities yard to include a pump house, chemical store, waste storage building, fuel tank, fire water retention tanks, gas storage, liquid nitrogen tank (LN2), mains water tank (MW Tank), rainwater harvesting treatment hut (RWH Tank) rainwater harvesting tank (RWH Tank), pipe racks to the proposed new filling line, solution preparation and utilities building and all ancillary plant and services infrastructure, iv) All other ancillary site development works which includes signage, tree removal and compensatory planting, bicycle shelter, provision of a new gated pedestrian/cycle entrance to the south onto Cork Road (L-3678) and rooftop PV solar panels, site drainage and landscaping works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Permission · Cork County Council, 23/6412
3 Oct 2023Conditional
The Development will consist of a new waste water treatment area. Works will include the construction of a standalone single storey roofed tankage structure, a two-storey dewatering/sludge building, a concrete slab area, access road, 3 no. vehicle parking bays and associated ground level mounted equipment and storage area. This application is for an amendment to the WWT area previously approved under reference no. 22/4839. The proposed development is on an existing manufacturing site to which the Major Accidents Directive applies, and to which an Industrial Emissions Licence and an Integrated Pollution Control Licence that are regulated by the Environmental Protection Agency (EPA) applies.
Permission · Cork County Council, 23/5983
29 Sept 2023Conditional
The development consists of site enabling works to facilitate future expansion of their facility and all ancillary site development works. The proposed development comprises modifications to the internal site layout including: (i) The decommissioning of existing surface car parking spaces to the northwest of the site and their relocation to the south and east of the site. Decommissioned car parking areas to be finished with temporary graded gravel. (ii) All ancillary site development works including the relocation of existing smoking and bicycle parking shelters, removal of existing container structure, tree removal, compensatory planting, site drainage and landscaping works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Permission · Cork County Council, 23/5968
20 Sept 2023Conditional
Planning permission for increase in floor area at first floor level by 68.5m² for office use, located in the existing double height entrance lobby, to our existing office and manufacturing building at Tullagreen, Carrigtwohill, Co. Cork, T45KD29. The proposed development is for modifications to an existing manufacturing establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with the regulatory requirements under existing licence conditions.
Permission · Cork County Council, 23/5901
29 Aug 2023Conditional
Permission for the construction of a single storey ESB switch room building, single vehicle park space, pedestrian paths and ramps. The proposed development is for a new build on an existing manufacturing establishment site to which the Major Accidents Directive applies. The proposed development site is subject to the provisions of an EPA-Industrial Emissions Directive (IE) Licence
Permission · Cork County Council, 23/5751
3 Aug 2023Incompleted application
Permission for the construction of a single storey ESB switch room building, single vehicle park space, pedestrian paths and ramps
Permission · Cork County Council, 23/5585
3 Aug 2023Incompleted application
Permission for increase in floor area at first floor level by 68.5m2 for office use, located in the existing double height entrance lobby, to our existing office & manufacturing building
Permission · Cork County Council, 23/5589
9 Feb 2023Conditional
The construction of a single-storey plantroom extension and demolition of an existing single storey airlock lobby, to an existing production building and associated site works at the existing facility. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence conditions
Permission · Cork County Council, 23/4211
26 Jan 2023Conditional
Permission for retention of an emergency response team modular building, a medical team modular building, an engineering support office modular building, a chemical storage unit, an argon gas store, joining and enclosing of two chemical drum store canopies, a contractor’s smoking shelter, a general smoking shelter, a motorbike and bicycle shelter, a chemical dosing station enclosure, a water analysing cabin, increase height of the stairwell enclosure to the northwest of the K2 production building and enclosure to the stairs on the north east of the K2 production building which are alterations to that granted under planning permission number 18/6189, permanent security building and facilities support building temporarily granted under planning permission 13/4033, production building elevational alterations to that granted under planning permission number 14/4013, machinery parts storage building elevational and layout alterations and additional mezzanine storage area, as constructed, to that granted under planning permission number 15/6112, boiler house elevational and layout alterations and additional mezzanine maintenance area, as constructed, to that granted under planning permission number 13/5232, retention and completion of three IC4 engineering support office modular buildings and link corridor joining the engineering support office to the IC4 engineering support office #1, and all associated site works at the existing facility at Tullagreen and Carrigtohill (townland), Carrigtowhill, Co.Cork, T45 KD29. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.
Retention · Cork County Council, 23/4096
11 May 2022Conditional
The construction of a new single storey electrical control building and new 20m high stack to replace an existing 14.6m high as well as associated site plant, equipment and all associated site works at the existing research, development and manufacturing facility. The proposed development is for modifications to an establishment to which the Major Accidents Directives applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under the existing licensc condition.
Permission · Cork County Council, 22/5082
14 Apr 2022Conditional
The demolition of existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building to the east of the existing manufacturing building. At ground floor level the new manufacturing building will comprise warehouse area with two loading docks, a main production area, changing facilities, entrance area, offices, circulation corridors, workshops and a quality control laboratory. First floor level will comprise laboratory accommodation, offices, meeting rooms, circulation corridors, mechanical and electrical plant rooms. Second floor level will comprise process, mechanical and electrical plantrooms and circulating corridors. Roof level will comprise double stacked air handling units, chillers, miscellaneous mechanical pipework and electrical cable tray on pipe bridge structures traversing the roof. The development will also consist of a new single storey drum storage building & a 2 storey central utilities building accommodating boilers, air compressors and electrical switch rooms. A pipe Rack structure will carry electrical cable tray and pipework between the main production building, the drum store, the central utilities building and a new wastewater treatment plant. External works will comprise: The provision of a new internal road serving the south side of the main production building and along the west side serving the new central utilities building and drum store. The hard-standing area between the drum store and central utilities building to accommodate a process regenerative thermal oxidiser accessible by a service road between CUB and drum store. The provision of a hard-standing area east of the drum store and central utilities building accommodating a replacement switch room, regenerative thermal oxidiser serving the WWTP, a fire water storage tank, a used pallet storage area, a pump house, a foam pump house and an area to locate emergency generators. The height of the existing fire water retention pond is to be increased by 500mm for increased capacity. An extension to the wastewater treatment plant serving the new development will comprise an electrical switch room building, multiple tanks and bunded areas to be located on the east side of the site. Expansion of the existing tank farm will comprise the installation of mechanical equipment and solvent recovery units, serviced by a new tanker loading bay. The provision of a new main electrical switch building adjacent to the existing security cabin. The exis
Permission · Cork County Council, 22/4839
7 Apr 2022Withdrawn
Permission for the following (1) the construction of a new site entrance (2) the construction/ installation of approximately 470m new 2.4m high green palisade security fencing / gate (3) the demolition / demounting of approximately 170m of existing mesh fencing and (4) all associated site works including footpath, lighting and CCTV at IDA business Park
Permission · Cork County Council, 22/4781
25 Mar 2022Incompleted application
The demolition of existing switch room and an existing drum store and the construction of a new 3 storey manufacturing building to the east of the existing manufacturing building. At ground floor level the new manufacturing building will comprise warehouse area with two loading docks, a main production area, changing facilities, entrance area, offices, circulation corridors, workshops and a quality control laboratory. First floor level will comprise laboratory accommodation, offices, meeting rooms, circulation corridors, mechanical and electrical plant rooms. Second floor level will comprise process, mechanical and electrical plantrooms and circulating corridors. Roof level will comprise double stacked air handling units, chillers, miscellaneous mechanical pipework and electrical cable tray on pipe bridge structures traversing the roof. The development will also consist of a new single storey drum storage building & a 2 storey central utilities building accommodating boilers, air compressors and electrical switch rooms. A pipe Rack structure will carry electrical cable tray and pipework between the main production building, the drum store, the central utilities building and a new wastewater treatment plant. External works will comprise: The provision of a new internal road serving the south side of the main production building and along the west side serving the new central utilities building and drum store. The hard-standing area between the drum store and central utilities building to accommodate a process regenerative thermal oxidiser accessible by a service road between CUB and drum store. The provision of a hard-standing area east of the drum store and central utilities building accommodating a replacement switch room, regenerative thermal oxidiser serving the WWTP, a fire water storage tank, a used pallet storage area, a pump house, a foam pump house and an area to locate emergency generators. The height of the existing fire water retention pond is to be increased by 500mm for increased capacity. An extension to the wastewater treatment plant serving the new development will comprise an electrical switch room building, multiple tanks and bunded areas to be located on the east side of the site. Expansion of the existing tank farm will comprise the installation of mechanical equipment and solvent recovery units, serviced by a new tanker loading bay. The provision of a new main electrical switch building adjacent to the existing security cabin. The exis
Permission · Cork County Council, 22/4651
24 Mar 2022Conditional
Permission for the construction of a single-storey extension to the existing manufacturing building, including a single-storey link corridor, external ladder, external rooftop plant area and all associated site works at the existing facility. The proposed development is for modifications to an establishment to which Major Accidents Directive applies. The establishment holds an Industrial Emissions licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.
Permission · Cork County Council, 22/4643
14 Mar 2022Conditional
To apply for a temporary permission for the provision of single storey pre-fabricated office and general lab building. The development also includes the provision of a temporary covered walkway connecting the proposed temporary office accommodation to the existing innovation centre, car parking, cycle parking and all ancillary site development works. Access to the proposed development will be from the existing entrance to the IDA Business park.
Permission · Cork County Council, 22/4567
17 Feb 2022Conditional
Construction of a new single storey electrical building and associated site works at the existing facility. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The establishment holds an Industrial Emissions Licence and is regulated by the Environmental Protection Agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.
Permission · Cork County Council, 22/4332
The 25 most recent of over 100 applications.
Source: National Planning Applications, Department of Housing, Local Government and Heritage, CC BY 4.0. Applicants are not shown.
Nature and heritage
Designated sites and recorded monuments
Designated sites
- Special Area of Conservation: Great Island Channel SAC 001058
- Special Protection Area: Cork Harbour SPA 004030
- Proposed Natural Heritage Area: Great Island Channel 001058
Recorded monuments
- CO075-019 Country house
Description
Late 18th/early 19th century 2-storey L-shaped house. Originally hipped-roof, gabled at rear. Entrance front (E) of 5 bays; central door; brick arched windows; brick cornice. Central 2-storey hipped projection to rear. According to local information farmbuildings to SSE are remains of larger complex, demolished during Gas Pipeline construction (1976); contained a mill building of which two millstones survive. House subsequently demolished. The above description is derived from the published 'Archaeological Inventory of County Cork. Volume 2: East and South Cork' (Dublin: Stationery Office, 1994). In certain instances the entries have been revised and updated in the light of recent research. Date of upload/revision: 14 January 2009
Architectural heritage
- Tullagreen House, country house, 1810–1830 · Regional interest
Description
Detached five-bay two-storey over raised basement country house, built c. 1820, incorporating fabric of earlier dwelling and having single-bay breakfronts to north and south elevations, two-storey canted projection to east elevation and single-bay single-storey extension to west end of north elevation incorporating entrance. Skirt roof with overhanging eaves, render eaves course, rendered chimneystacks and cast-iron rainwater goods. Render cornice to canted bay. Rendered walls with render quoins. Recessed blind roundels having moulded render surrounds to north elevation of single-storey extension. Square-headed diminishing window openings with painted sills and two-over-two pane and one-over-one pane timber sliding sash windows. Round-headed windows to west elevation of single-storey extension having moulded render arcaded surrounds, cut stone sills and one-over-one pane timber sliding sash windows. Round-headed door opening to single-storey extension with render doorcase comprising piers supporting moulded archivolt set in recess, having timber panelled door and overlight. Square-headed door opening to south elevation with timber panelled half-glazed double-leaf doors surmounted by overlight and approached by flight of rendered steps.
- Tullagreen House, gate lodge, 1870–1890 · Regional interest
Description
Detached two-bay two-storey former gate lodge, built c. 1880, having gablets to front (west) elevation and single-storey extensions to east and north elevations. Now in use as house. Pitched slate roof with decorative ridge crestings, carved timber pinnacles and bargeboards to gables, cast-iron rainwater goods and skylights to east pitch. Flat-roofs to extensions. Exposed rubble limestone and Cork red sandstone walls with rendered round-headed niche to south elevation and rendered blind roundel to north elevation. Segmental-headed openings with render surrounds and concrete sills and timber casement windows, opening to south elevation with blind pointed-arch above. Square-headed door opening to flat-roofed extension to north with recent timber panelled half-glazed door. Rubble limestone and Cork red sandstone gate piers and boundary walls to site having red brick and render coping and caps.
- Slatty Bridge, bridge, 1805–1810 · Regional interest
Description
Bridge and sluice carrying road over Slatty Channel, built 1807, of coursed rock-faced limestone construction with carved limestone copings to parapet walls, carved limestone plaques with incised lettering to east parapet wall and round-headed arches to sluice openings.
Designated sites: National Parks and Wildlife Service. Recorded monuments: Sites and Monuments Record, National Monuments Service. Buildings: National Inventory of Architectural Heritage. Department of Housing, Local Government and Heritage, CC BY 4.0. Works at or in relation to a recorded monument need two months' written notice to the National Monuments Service (National Monuments (Amendment) Act 1994, section 12).
Ground and risks
Radon, landslides, flooding
- Radon
- About 1 in 10 homes in this area is likely to have high radon levels. Testing a home
- Landslides
- Susceptibility moderately low, low, low (inferred), on the 1:50,000 map; parts are water.
- Terrain model
- No LiDAR survey of the Office of Public Works covers the centre of the townland of Tullagreen.
- Flooding
- The flood maps of the Office of Public Works: floodinfo.ie.
Radon Risk Map of Ireland, Environmental Protection Agency; Landslide Susceptibility Classification, Geological Survey Ireland; both CC BY 4.0. LiDAR: contains Irish Public Sector Data (Geological Survey Ireland & the Office of Public Works) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.
Homes sold
Property Price Register
No address of the register names Tullagreen with five sales or more. The sales of the area are on the page of Co. Cork.
The townland
- Name
- Tullagreen · Tulach Ghréine
- Area
- 495,320 m² (49.53 ha, 122.4 acres)
- Civil parish
- Carrigtohill, and its townlands
- Barony
- Barrymore
- Electoral division
- Carrigtohill, the unit of the census
- Census 2022
- Carrigtohill electoral division: 8,181 people in 2,751 households; 72% of households own their home; 61% of homes were built since 2001; 5% of dwellings stood vacant on census night, and 0% were holiday homes.
- Neighbouring townlands
- Anngrove, Barryscourt, Carrigtohill, Foaty, Killacloyne, Terry's-Land
- Placenames
- Tullagreen on logainm.ie, the Placenames Database of Ireland
Townlands, civil parishes, baronies and electoral divisions, National Statutory Boundaries, Tailte Éireann, CC BY 4.0. Census 2022, Small Area Population Statistics by electoral division, Central Statistics Office, CC BY 4.0. A townland is the smallest land division of Ireland, and the unit of a rural address; old registers such as the 1901 and 1911 censuses file it under its civil parish and barony.